HomeMy WebLinkAboutJ5951 Dennis Yarmouth Middle School WE 2022-05-20Summary Report #51
May 23, 2022
Attn:
Job No: 5951
Job Name:Dennis Yarmouth Middle School
296 Station Ave
South Yarmouth, MA 02664
Permit No.:BLD-21-006153
TESTING
INSPECTION
ENGINEERING
GK
12 Tech Circle, Natick, MA 01760 | (617) 938-3774 office | (617) 344-0478 fax
Southern California
New England
Arizona
Texas
New York
Miami
May 17, 2022
Eric Pittman reported to John Pope with PMA at the jobsite. Performed engineering misc. inspection. See attached.
Eric Pittman reported to John Pope with PMA at the jobsite. Performed engineering misc. inspection. See attached.
James Descoteaux reported to Nicholas Hull and Jon Pope with PMA at the jobsite. Performed engineering misc. inspection. See attached.
The work observed was, to the best of Eric's, James knowledge, in accordance with the approved plans, specifications and applicable standards of
workmanship.
Laboratory test results are enclosed if testing was done during the period covered by this report.
Limitations: These inspections were performed in accordance with requirements, but please note this report shall not be relied upon by others, as
acceptance or guarantee of the work. Even with diligent inspection techniques, the contractor is solely liable for defects or failures to adhere to the
code.
Reviewed by:
Jillian Kass
Staff Engineer
05-27-2022
Date
Technical Contact: Bruce Tie, Engineering Manager (btie@fenaghengineering.com)
Administrative Contact: Gabriella Kass (Gkass@fenaghengineering.com)
cc:Fenagh PM – emushi@fenaghengineering.com (email)
Fenagh Technical Reviewer – btie@fenaghengineering.com (email)
TESTING
INSPECTION
ENGINEERING
Project No: 5951
Project Name: Dennis Yarmouth Middle School
Project Location: 296 Station Ave, South Yarmouth, MA, 02664
Fenagh Representative: Eric Pittman
Inspection Type: Engineering Inspection
Pg. 1 of 1
May 17, 2022
Time In: 07:30 Break: 12:00-12:30 Time Out: 13:30
DFR ID: 36058
Weather: Sunny
Temperature: 70°F
Permit No. : BLD-21-006153
Plans Dated: 02/02/2021
Conformance:
The Work observed was, to the best of my knowledge, in accordance with the approved plans, specifications and applicable standards
of workmanship.
Limitations:These inspections were performed in accordance with requirements, but please note this report shall not be relied upon by others, as acceptance or guarantee of the work. Evenwith diligent inspection techniques, the contractor is solely liable for defects or failures to adhere to the code. Information provided herein has not been reviewed by supervisory staff,therefore, should be considered preliminary and subject to change, unless signed by both inspector and engineer below.
Reviewed by:
Eric Pittman
Inspector
05-17-2022
Date Jillian Kass
Staff Engineer
05-24-2022
Date
12 Tech Circle, Natick, MA 01760 | (617) 938-3774 office | (617) 344-0478 fax
Southern California
New England
Arizona
Texas
New York
Miami
Eric Pittman reported to John Pope with PMA at the jobsite.
Building D mulled window unit G1A D4 D2 tested on the first level North wall for air and water infiltration per ASTM E 783 and E
1105 at the parameters given from the project specifications. Report and photograph are attached.
Additional Notes: This window met the test parameters.
Referenced Details: Project specifications and architectural plans. Project submittals.
Introduction:
Fenestration air leakage resistance and water penetration resistance testing was performed as requested by
the client. Windows were selected at random by client. Testing was performed using an internal test
chamber on a pass / fail basis. See procedure for more details.
Procedure(s):
Air Leakage Resistance
Air Leakage resistance testing was performed in accordance with ASTM E783-02: “Standard Test Method
for Field Measurement of Air Leakage Through Installed Exterior Windows and Doors”, with respect to
AAMA 502-12: “Voluntary Specification for Field Testing of Newly Installed Fenestration Products”.
Water Penetration Resistance
Water penetration resistance testing was performed in accordance with ASTM E 1105-00: “Test Method for
Field Determination of Water Penetration of Installed Exterior Windows, Skylights, Doors, and Curtain
Walls, by Uniform or Cyclic Static Air Pressure Difference”, with respect to AAMA 502-12: “Voluntary
Specification for Field Testing of Newly Installed Fenestration Products”.
Procedure A (ASTM E 1105-00, Section 12.1) - A uniform static differential pressure is applied across the
fenestration within 15 seconds and maintain this pressure, along with the specified rate of water spray for 15
minutes.
Massachusetts - 12 Tech Circle | Natick, MA 01760 | Phone (617) 938-3774 | Fax (617) 344-0478
California - 9070 Center Avenue | Rancho Cucamonga, CA 91730 | Phone (909 587-6374 New
York – 54-21 73rd Place | Maspeth, NY 11378 | Phone (515) 787-3333
WINDOW TESTING REPORT
Project: Report Number:
Project Address:
Client:
Date of Site Visit:
Report Date:
Purpose of Visit: Fenestration Field Air Leakage Resistance and Water Penetration Resistance
Testing
On-Site During Visit:
Report By:
Dennis Yarmouth Middle School
South Yarmouth, MA
PMA
5-17-2022
5-17-2022
Eric Pittman, James Descoteaux
Eric Pittman
WINDOW TESTING REPORT
Conformance Criteria:
Air leakage resistance tests shall be conducted at a uniform cyclic test pressure of 1.57 psf. The maximum
allowable rate of air leakage shall not exceed 0.09 cfm/ft2
Water penetration resistance tests shall be conducted at a static test pressure of 6.24 PSF. No water penetration shall
occur as defined in ASTM E1105-00, Section 3.2.3. (Per project specification 08 4113 3.5 as provided by PMA)
ASTM E 1105-00, Section 3.2.3, defines water penetration as “penetration of water beyond a plane parallel to the
glazing (the vertical plane) intersecting the innermost projection of the test specimen, not including interior trim
and hardware, under the specified conditions of air pressure difference across the specimen”. Any such water
penetration shall constitute failure of the water penetration resistance test. Water penetrating through the perimeter
frame of the specimen shall also constitute failure. Water contained within drained flashing, gutters, and sills shall
not constitute failure.
On-Site Results:
Weather
Temperature
Wind Speed
Wind Direction
Barometric Pressure
Weather
Test #1:
Location
Unit Type
Unit Dimensions
Test Pressure
Photos
Massachusetts - 12 Tech Circle | Natick, MA 01760 | Phone (617) 938-3774 | Fax (617) 344-0478
California - 9070 Center Avenue | Rancho Cucamonga, CA 91730 | Phone (909 587-6374
New York – 54-21 73rd Place | Maspeth, NY 11378 | Phone (515) 787-3333
70 °F
0-3mph
varied
30.1 in Hg
Sunny
60" wide x 94" high
1.57 PSF
attached.
level 1 bld D, North Wall
G1A D4-D2
Test #1: Air Leakage Resistance Testing (ASTM E 783)
Time of Test
Date of Test
Extraneous Air Leakage (with plastic sheeting)
Total Air Flow (no exterior plastic sheeting)
Net Airflow
Square footage of specimen
Air Infiltration Rate
Maximum Allowable Air Infiltration Rate
Results
Test #1: Water Penetration Resistance Testing (ASTM E 1105)
Time of Test
Date of Test
Differential Pressure
(psf)
Duration
(min.) Results
Massachusetts - 12 Tech Circle | Natick, MA 01760 | Phone (617) 938-3774 | Fax (617) 344-0478 California - 9070 Center Avenue | Rancho Cucamonga, CA 91730 | Phone (909 587-6374 New York – 54-21 73rd Place | Maspeth, NY 11378 | Phone (515) 787-3333
WINDOW TESTING REPORT
11:17
5-17-22
30 scfm
30 scfm
0.0 scfm
39.3 ft^2
0 cfm
0.09 cfm/ft^2
Meets conformance criteria of ASTM E783
13:15
5-17-22
6.24
.0
0
15 minutes
Diffential pressure reduced to 0, water spray abated
15 minutes
Spray Rack applied water to the exterior face of the fenestration product at 5
gal/sq. ft/hr, with interior chamber at differential pressure of 6.24 psf.
No water penetration observed.
Work observed was, to the best of my knowledge, in conformance with:
•Project Specification 08 4113 3.5 , dated February 2, 2021
•ASTM E1105, E331, & E547
•AAMA 502, ANSI/AAMA/NWWDA 101/I.S.2-97
WINDOW TESTING REPORT
Limitations: These inspections were performed in accordance with requirements, but please note this report shall not
be relied upon by others as acceptance or guarantee of the work. Even with diligent inspection techniques, the
contractor is solely liable for defects or failures to adhere to the code. Information provided herein has not been
reviewed by supervisory staff, therefore, should be considered preliminary and subject to change, unless signed by
both inspector and engineer below.
______
Eric Pittman
Sr. Field Inspector
Massachusetts - 12 Tech Circle | Natick, MA 01760 | Phone (617) 938-3774 | Fax (617) 344-0478
California - 9070 Center Avenue | Rancho Cucamonga, CA 91730 | Phone (909 587-6374
New York – 54-21 73rd Place | Maspeth, NY 11378 | Phone (515) 787-3333
Result Summary:
Air leakage testing per ASTM E783-02 met the parameters set out in the project specifications and AAMA 502.
Per ASTM E1105, differential air pressure was maintained within the capsule at 6.24 PSF and water spray delivery at 5.0 U.S.
gal/ft^2/hour for the duration of the test period. The capsule was sealed to the interior finished wall around the rough opening,
which was lined with flashing. This arrangement tested the integrity of the installation as well as the actual window.
No water leakage was observed at the conclusion of the test.
TESTING
INSPECTION
ENGINEERING
Project No: 5951
Project Name: Dennis Yarmouth Middle School
Project Location: 296 Station Ave, South Yarmouth, MA, 02664
Fenagh Representative: Eric Pittman
May 17, 2022
Permit No. :
TESTING
INSPECTION
ENGINEERING
Project No: 5951
Project Name: Dennis Yarmouth Middle School
Project Location: 296 Station Ave, South Yarmouth, MA, 02664
Fenagh Representative: Eric Pittman
Inspection Type: Engineering Inspection
Pg. 1 of 1
May 17, 2022
Time In: 13:30 Time Out: 16:00
DFR ID: 36060
Weather: Sunny
Temperature: 72°F
Permit No. : BLD-21-006153
Plans Dated: 02/02/2021
Conformance:
The Work observed was, to the best of my knowledge, in accordance with the approved plans, specifications and applicable standards
of workmanship.
Limitations:These inspections were performed in accordance with requirements, but please note this report shall not be relied upon by others, as acceptance or guarantee of the work. Evenwith diligent inspection techniques, the contractor is solely liable for defects or failures to adhere to the code. Information provided herein has not been reviewed by supervisory staff,therefore, should be considered preliminary and subject to change, unless signed by both inspector and engineer below.
Reviewed by:
Eric Pittman
Inspector
05-17-2022
Date Jillian Kass
Staff Engineer
05-24-2022
Date
12 Tech Circle, Natick, MA 01760 | (617) 938-3774 office | (617) 344-0478 fax
Southern California
New England
Arizona
Texas
New York
Miami
Eric Pittman reported to John Pope with PMA at the jobsite.
Building D mulled window unit G2A D4 D2 tested on the second level North wall for air and water infiltration per ASTM E 783 and E
1105 at the parameters given from the project specifications. Report and photograph are attached.
Additional Notes: This window met the test parameters.
Referenced Details: Project specifications and architectural plans. Project submittals.
TESTING
INSPECTION
ENGINEERING
Project No: 5951
Project Name: Dennis Yarmouth Middle School
Project Location: 296 Station Ave, South Yarmouth, MA, 02664
Fenagh Representative: Eric Pittman
May 17, 2022
Permit No. :
Introduction:
Fenestration air leakage resistance and water penetration resistance testing was performed as requested by
the client. Windows were selected at random by client. Testing was performed using an internal test
chamber on a pass / fail basis. See procedure for more details.
Procedure(s):
Air Leakage Resistance
Air Leakage resistance testing was performed in accordance with ASTM E783-02: “Standard Test Method
for Field Measurement of Air Leakage Through Installed Exterior Windows and Doors”, with respect to
AAMA 502-12: “Voluntary Specification for Field Testing of Newly Installed Fenestration Products”.
Water Penetration Resistance
Water penetration resistance testing was performed in accordance with ASTM E 1105-00: “Test Method for
Field Determination of Water Penetration of Installed Exterior Windows, Skylights, Doors, and Curtain
Walls, by Uniform or Cyclic Static Air Pressure Difference”, with respect to AAMA 502-12: “Voluntary
Specification for Field Testing of Newly Installed Fenestration Products”.
Procedure A (ASTM E 1105-00, Section 12.1) - A uniform static differential pressure is applied across the
fenestration within 15 seconds and maintain this pressure, along with the specified rate of water spray for 15
minutes.
Massachusetts - 12 Tech Circle | Natick, MA 01760 | Phone (617) 938-3774 | Fax (617) 344-0478
California - 9070 Center Avenue | Rancho Cucamonga, CA 91730 | Phone (909 587-6374 New
York – 54-21 73rd Place | Maspeth, NY 11378 | Phone (515) 787-3333
WINDOW TESTING REPORT
Project: Report Number:
Project Address:
Client:
Date of Site Visit:
Report Date:
Purpose of Visit: Fenestration Field Air Leakage Resistance and Water Penetration Resistance
Testing
On-Site During Visit:
Report By:
Dennis Yarmouth Middle School
South Yarmouth, MA
PMA
5-17-2022
5-17-2022
Eric Pittman, James Descoteaux
Eric Pittman
WINDOW TESTING REPORT
Conformance Criteria:
Air leakage resistance tests shall be conducted at a uniform cyclic test pressure of 1.57 psf. The maximum
allowable rate of air leakage shall not exceed 0.09 cfm/ft2
Water penetration resistance tests shall be conducted at a static test pressure of 6.24 PSF. No water penetration shall
occur as defined in ASTM E1105-00, Section 3.2.3. (Per project specification 08 4113 3.5 as provided by PMA)
ASTM E 1105-00, Section 3.2.3, defines water penetration as “penetration of water beyond a plane parallel to the
glazing (the vertical plane) intersecting the innermost projection of the test specimen, not including interior trim
and hardware, under the specified conditions of air pressure difference across the specimen”. Any such water
penetration shall constitute failure of the water penetration resistance test. Water penetrating through the perimeter
frame of the specimen shall also constitute failure. Water contained within drained flashing, gutters, and sills shall
not constitute failure.
On-Site Results:
Weather
Temperature
Wind Speed
Wind Direction
Barometric Pressure
Weather
Test #1:
Location
Unit Type
Unit Dimensions
Test Pressure
Photos
Massachusetts - 12 Tech Circle | Natick, MA 01760 | Phone (617) 938-3774 | Fax (617) 344-0478
California - 9070 Center Avenue | Rancho Cucamonga, CA 91730 | Phone (909 587-6374
New York – 54-21 73rd Place | Maspeth, NY 11378 | Phone (515) 787-3333
70 °F
0-3mph
varied
30.1 in Hg
Sunny
60" wide x 94" high
1.57 PSF
attached.
level 2 bld D, North Wall
G2A D4-D2
Test #1: Air Leakage Resistance Testing (ASTM E 783)
Time of Test
Date of Test
Extraneous Air Leakage (with plastic sheeting)
Total Air Flow (no exterior plastic sheeting)
Net Airflow
Square footage of specimen
Air Infiltration Rate
Maximum Allowable Air Infiltration Rate
Results
Test #1: Water Penetration Resistance Testing (ASTM E 1105)
Time of Test
Date of Test
Differential Pressure
(psf)
Duration
(min.) Results
Massachusetts - 12 Tech Circle | Natick, MA 01760 | Phone (617) 938-3774 | Fax (617) 344-0478 California - 9070 Center Avenue | Rancho Cucamonga, CA 91730 | Phone (909 587-6374 New York – 54-21 73rd Place | Maspeth, NY 11378 | Phone (515) 787-3333
WINDOW TESTING REPORT
14:15
5-17-22
20 scfm
20 scfm
0.0 scfm
39.3 ft^2
0 cfm
0.09 cfm/ft^2
Meets conformance criteria of ASTM E783
14:25
5-17-22
6.24
.0
0
15 minutes
Diffential pressure reduced to 0, water spray abated
15 minutes
Spray Rack applied water to the exterior face of the fenestration product at 5
gal/sq. ft/hr, with interior chamber at differential pressure of 6.24 psf.
No water penetration observed.
Work observed was, to the best of my knowledge, in conformance with:
•Project Specification 08 4113 3.5 , dated February 2, 2021
•ASTM E1105, E331, & E547
•AAMA 502, ANSI/AAMA/NWWDA 101/I.S.2-97
WINDOW TESTING REPORT
Limitations: These inspections were performed in accordance with requirements, but please note this report shall not
be relied upon by others as acceptance or guarantee of the work. Even with diligent inspection techniques, the
contractor is solely liable for defects or failures to adhere to the code. Information provided herein has not been
reviewed by supervisory staff, therefore, should be considered preliminary and subject to change, unless signed by
both inspector and engineer below.
______
Eric Pittman
Sr. Field Inspector
Massachusetts - 12 Tech Circle | Natick, MA 01760 | Phone (617) 938-3774 | Fax (617) 344-0478
California - 9070 Center Avenue | Rancho Cucamonga, CA 91730 | Phone (909 587-6374
New York – 54-21 73rd Place | Maspeth, NY 11378 | Phone (515) 787-3333
Result Summary:
Air leakage testing per ASTM E783-02 met the parameters set out in the project specifications and AAMA 502.
Per ASTM E1105, differential air pressure was maintained within the capsule at 6.24 PSF and water spray delivery at 5.0 U.S.
gal/ft^2/hour for the duration of the test period. The capsule was sealed to the interior finished wall around the rough opening,
which was lined with flashing. This arrangement tested the integrity of the installation as well as the actual window.
No water leakage was observed at the conclusion of the test.
TESTING
INSPECTION
ENGINEERING
Project No: 5951
Project Name: Dennis Yarmouth Middle School
Project Location: 296 Station Ave, South Yarmouth, MA, 02664
Fenagh Representative: James Descoteaux
Inspection Type: Engineering Inspection
Pg. 1 of 1
May 17, 2022
Time In: 07:00 Break: 11:00-11:30 Time Out: 15:30
DFR ID: 35781
Weather: Sunny
Temperature: 65°F
Permit No. : BLD-21-006153
Plans Dated: 01/19/2021
Conformance:
The Work observed was, to the best of my knowledge, in accordance with the approved plans, specifications and applicable standards
of workmanship.
Limitations:These inspections were performed in accordance with requirements, but please note this report shall not be relied upon by others, as acceptance or guarantee of the work. Evenwith diligent inspection techniques, the contractor is solely liable for defects or failures to adhere to the code. Information provided herein has not been reviewed by supervisory staff,therefore, should be considered preliminary and subject to change, unless signed by both inspector and engineer below.
Reviewed by:
James Descoteaux
Inspector
05-17-2022
Date Jillian Kass
Staff Engineer
05-24-2022
Date
12 Tech Circle, Natick, MA 01760 | (617) 938-3774 office | (617) 344-0478 fax
Southern California
New England
Arizona
Texas
New York
Miami
James Descoteaux reported to Nicholas Hull and Jon Pope with PMA at the jobsite.
Assisted Eric Pittman with Window Water Leakage Testing. See Eric Pittman's report for specifications and results of testing.
J5951 - Dennis Yarmouth Middle School - Exception Log Pages 1 of 5
NCR ID#Date Location Inspector Issue RFI/ Submittal
No.Resolved? (Y/N)Sub/ Contractor Date Resolved Comment
1 7/21/2021 Wall : C /d3 Arsene Ntwali
Low break:
Mix Desing 3500D, design strength of 3500 psi at 28 days, specified slump from 4 to 6 in., specified air content
from 4.5% to 7.5%
Y Marguerite
Tuesday, January
18, 2022 12:53
PM
EOR to Advise
7 day break 08/10/2021
Set 1 = 1,860 psi
28 day break 08/31/2021
Set 1 = 2,800 psi
Set 1 = 2,900 psi
Set 1 = 3,480 psi
28 day average = 3,060 psi
2 7/28/2021 Footing : C16/E Arsene Ntwali
Low break:
Mix Desing 3500D, design strength of 3500 psi at 28 days, specified slump from 4 to 6 in., specified air content
from 4.5% to 7.5% : Lab Log No.: 15519 (2744-2745)
Y Marguerite
Tuesday, January
18, 2022 12:53
PM
EOR to Advise
28 day break 08/25/2021
Set 1 = 3,370 psi
Set 1 = 3,500 psi
Set 1 = 3,650 psi
3 7/30/2021
Footings Set # 1 :Column
line/Row: D.3/c116 Set # 2
Columm line / Row c5/H
Arsene Ntwali
Low break:
Mix Desing 3500D, design strength of 3500 psi at 28 days, specified slump from 4 to 6 in., specified air content
from 4.5% to 7.5%
Y Marguerite
Tuesday, January
18, 2022 12:53
PM
EOR to Advise
28 day break 08/27/2021
Set 1 = 3,070 psi
Set 1 = 3,330 psi
Set 1 = 3,430 psi
Set 2 = 3,330 psi
Set 2 = 3,520 psi
Set 2 = 3,580 psi
56 day break 09/24/2021
Set # 1 = 3,720 psi
Set #2 = 3,670 psi
4 8/3/2021 Footings: Elevator pit
foundation Arsene Ntwali
Low break:
Mix Desing 3500D, design strength of 3500 psi at 28 days, specified slump from 4 to 6 in., specified air content
from 4.5% to 7.5%
Y Marguerite
Tuesday, January
18, 2022 12:53
PM
EOR to Advise
7 day break 08/10/2021
Set 1 = 2,610 psi
28 day break 08/31/2021
Set 1 = 3,170 psi
56 day break 9/28/2021
Set 1 = 3,330 psi
Set 1 = 3,490 psi
Set 1 = 3,700 psi
56 day average set 1 = 3,510 psi
5 8/6/2021 Level 1 Wall at Building C
and B - E/c2 Arsene Ntwali
Low break:
Mix Desing 3500D, design strength of 3500 psi at 28 days, specified slump from 4 to 6 in., specified air content
from 4.5% to 7.5%
Y Marguerite
Tuesday, January
18, 2022 12:53
PM
EOR to Advise
7 day break 08/13/2021
Set 1 = 2,980 psi
28 day break 09/3/2021
Set 1 = 3,170 psi
56 day break 10/8/2021
Set 1 = 3,230 psi
Set 1 = 3,400 psi
6 8/6/2021 Level 1 Wall at Building C
and B - J.7/b25 Arsene Ntwali
Low break:
Mix Desing 3500D, design strength of 3500 psi at 28 days, specified slump from 4 to 6 in., specified air content
from 4.5% to 7.5%
Y Marguerite
Tuesday, January
18, 2022 12:53
PM
EOR to Advise
7 day break 08/13/2021
Set 2= 2,390 psi
28 day break 09/03/2021
Set 2 = 3380 psi
56 day break 10/01/2021
Set 2 = 3710 psi
7 8/13/2021 Level 1 Footings at Building
B: P.1/b33 Arsene Ntwali
Low break:
Mix Desing 3500D, design strength of 3500 psi at 28 days, specified slump from 4 to 6 in., specified air content
from 4.5% to 7.5%
Y Marguerite
Tuesday, January
18, 2022 12:53
PM
EOR to Advise
17 day break 08/30/2021
Set 1 = 3,090 psi
28 day break 09/10/2021
Set 1 = 3,460 psi
Set 1 = 3,510 psi
56 day break 10/08/2021
Set 1 = 3760 psi
Set 1 = 3850 psi
8 8/13/2021 Level 1 Footings at Building
B: J.3/b24 Arsene Ntwali
Low break:
Mix Desing 3500D, design strength of 3500 psi at 28 days, specified slump from 4 to 6 in., specified air content
from 4.5% to 7.5%
Y Marguerite
Tuesday, January
18, 2022 12:53
PM
EOR to Advise
7 day break 08/20/2021
Set 2 = 2,320 psi
28 day break 09/10/2021
Set 2 = 2,840 psi
56 day break 10/08/2021
Set 2 = 3030 psi
Set 2 = 3260 psi
Set 2 = 3150 psi
J5951 - Dennis Yarmouth Middle School - Exception Log Pages 2 of 5
9 8/20/2021 Level 1 Footings at
Foundation: Wall: H/c5 Arsene Ntwali
Low break:
Mix Desing 3500D, design strength of 3500 psi at 28 days, specified slump from 4 to 6 in., specified air content
from 4.5% to 7.5% : Lab Log No.: 15860 (3024)
Y Marguerite
Tuesday, January
18, 2022 12:53
PM
EOR to Advise
7 day break 08/27/2021
Set 1 = 2,810 psi
28 day break 09/17/2021
Set 1 = 3,440 psi
Set 1 = 3,500 psi
56 day break 10/15/2021
Set 1 = 3,920 psi
Set 1 = 4,020 psi
10 9/3/2021 Level 1 Wall; U/a5 Arsene Ntwali
Low break:
Mix Desing 3500D, design strength of 3500 psi at 28 days, specified slump from 4 to 6 in., specified air content
from 4.5% to 7.5% ; Lab Log No.: 16067 (3123)
Y Marguerite
Tuesday, January
18, 2022 12:53
PM
EOR to Advise
7 day break 09/10/2021
Set 1 = 2,050 psi
28 day break 10/01/2021
Set 1 = 3,100 psi
56 day break 10/29/2021
Set 1 = 3,510 psi
Set 1 = 3,630 psi
Set 1 = 3,660 psi
11 9/9/2021 Level 1 Footing: M.5/b17 Arsene Ntwali
Low break:
Mix Desing 3500D, design strength of 3500 psi at 28 days, specified slump from 4 to 6 in., specified air content
from 4.5% to 7.5% ; Lab Log No.: 16132 (3175)
Y Marguerite
Tuesday, January
18, 2022 12:53
PM
EOR to Advise
7 day break 09/16/2021
Set 1 = 2,400 psi
28 day break 10/07/2021
Set 1 = 3,480 psi
Set 1 = 3,490 psi
56 day break 11/04/2021
Set 1 = 4,050 psi
Set 1 = 4,240 psi
12 9/10/2021 Level 1 Footing: L.9/b2 Arsene Ntwali
Low break:
Mix Desing 3500D, design strength of 3500 psi at 28 days, specified slump from 4 to 6 in., specified air content
from 4.5% to 7.5% ; Lab Log No.: 16133 (3176)
Y Marguerite
Tuesday, January
18, 2022 12:53
PM
EOR to Advise
7 day break 09/17/2021
Set 1 = 2,330 psi
28 day break 10/08/2021
Set 1 = 3,450 psi
Set 1 = 3,450 psi
Set 1 = 3,490 psi
56 day break 11/05/2021
Set 1 = 4,060 psi
13 8/13/2021
Level 1 Footings at Building
B: Set # 1
P.1/b33 Set # 2
J.3/b24
Arsene Ntwali
Low break:
Mix Desing 3500D, design strength of 3500 psi at 28 days, specified slump from 4 to 6 in., specified air content
from 4.5% to 7.5% ; Lab Log No.: 15745 (2945-2946)
Y Marguerite
Tuesday, January
18, 2022 12:53
PM
EOR to Advise
7 day break 08/20/2021
Set 2 = 2,320 psi
28 day break 09/10/2021
Set 1 = 3,460 psi
Set 1 = 3,510 psi
Set 2 = 2,840 psi
56 day break 10/08/2021
Set 1 = 3,760 psi
Set 1 = 3,850 psi
Set 2 = 3,260 psi
Set 2 = 3,030 psi
Set 2 = 3,150 psi
Set 2 = 3,260 psi
14 8/17/2021 Level 1 Footings at Building
B: S.1/b27 Arsene Ntwali
Low break:
Mix Desing 3500D, design strength of 3500 psi at 28 days, specified slump from 4 to 6 in., specified air content
from 4.5% to 7.5% ; Lab Log No.: 15745 (2945-2946)
Y Marguerite
Tuesday, January
18, 2022 12:53
PM
EOR to Advise
7 day break 08/24/2021
Set 1 = 2,510 psi
28 day break 09/14/2021
Set 1 = 3,280 psi
Set 1 = 3,430 psi
56 day break 10/12/2021
Set 1 = 4,070 psi
Set 1 = 4,110 psi
15 9/23/2021 Level 1 Footings at Building
B: P7/a18 Arsene Ntwali
Low break:
Mix Desing 5000D, design strength of 5,000 psi at 28 days, specified slump from 5 to 8 in., specified air content
from 4% to 7% ; Lab Log No.: 16288 (3264)
Y Marguerite
Tuesday, January
18, 2022 12:53
PM
EOR to Advise
7 day break 09/30/2021
Set 1 = 3,510 psi
28 day break 10/21/2021
Set 1 = 4,470 psi
56 day break 11/18/2021
Set 1 = 4,880 psi
Set 1 = 5,120 psi
Set 1 = 5,210 psi
16 11/2/2021
Level 1 Slab at Building D:
Line A-D1, Row D1-before
D16
Enea Mushi Measured Floor Flatness, Levelness (34.7 and 18.3) did not meet overall project requirement (35 and 25)N Marguerite
Tuesday, January
18, 2022 12:53
PM
EOR to Advise
J5951 - Dennis Yarmouth Middle School - Exception Log Pages 3 of 5
17 9/27/2021
Level 1 Wall at Q-P.7/a18,
a18-24/W
D17 : Sampled @ N.4/b5
Arsene Ntwali
Low break:
Mix Desing 5000D, design strength of 5,000 psi at 28 days, specified slump from 5 to 8 in., specified air content
from 4% to 7% ; Lab Log No.: 16339 (3323)
Y Marguerite
Tuesday, January
18, 2022 12:53
PM
EOR to Advise
7 day break 10/04/2021
Set 1 = 3,510 psi
28 day break 10/25/2021
Set 1 = 4,170 psi
56 day break 11/22/2021
Set 1 = 4,700 psi
90 day break 12/26/2021
Set 1 = 5470 psi
Set 1 = 5070 psi
18 12/16/2021
Level 1, area A
@ S.1-S.5/b11 bottoms only:
Level 16
@ K.9-N/b33 steel girts:
Level low roof/high roof
@ N.9-K/b1, K/b1-b22,
L+P.7/a17-b21,
LP.7/a17+b21, V-V.9/a15,
W/a1-a14, W-V/a1, V/a1-a2,
V-U/a2
Tony Paradis
WPSs not available for review for Stellar Steel Erectors or United Steel. Stellar Steel Used FCAW process in the
2F, 4F, 2G and 3G possitions. United Steel used the SMAW process in the 2F possition. rnWPQRs recieved for
Stellar Steel Erectors show no welders qualified for FCAW welds in the 4F or 3G positions.
N PMA EOR to Advise
19 12/17/2021 top and bottom plates Tony Paradis Contractor has failed to maintain 3/4" minimum distance from screw to edge of light gauge surfaces as called for
in General Note 4 on SK-3.Y PMA Wed 3/9/2022
12:46 PM EOR to Advise
20 11/18/2021 Level 1 Metal pan stairs at
Building D Arsene Ntwali Low Break :
Mix #: 4000DGRNA : Slump 5-9 air 0-3 Design Strength (psi): 4,000 @28 days : Lab Log No.: 17282 (3681)N PMA
EOR to Advise
7 day break 11/25/2021
Set 1 = 2,060 psi
28 day break 12/16/2021
Set 1 = 2,580 psi
56 day break 01/13/2022
Set 1 = 3,220 psi
90 day break 02/16/2022
Set 1 = 3,350 psi
21 12/21/2021 locations at building A and B Blake Mullens
The items as listed herein have not been accomplished in accordance with the approved documents, plans and
specifications: No. 10 screw missing at inside leg of track connections. Contractor to install inside leg no 10
screws with lift access. Pins at typical parapet detail within this area not spaced properly. Pins installed at
random locations instead of 5 pins within top 2" and 4 pins within bottom 2".
N PMA EOR to Advise
22 1/10/2022 Level 1, gridlines P.1-
J.1/B.33
Abdulwahab
Abulgasem
CMU blocks the Vertical #7 by 16” not reaching overlap requirements, and may getting conflict with other
structures as going up.Y PMA 1/13/2022 EOR to Advise
23 11/8/2021 Level 2 Salb on metal deck
at Building C: E/C4 Arsene Ntwali Low Break :
Mix #: 4000DGRNA : Slump 5-9 air 0-3 Design Strength (psi): 4,000 @28 days : Lab Log No.: 16995 N PMA
EOR to Advise
7 day break 11/15/2021
Set 1 = 2,880 psi
28 day break 12/06/2021
Set 1 = 3,820 psi
56 day break 01/03/2022
Set 1 = 4,160 psi
Set 1 = 4,250 psi
Set 1 = 4,300 psi
24 12/2/2021 Building C : F-G/C7-9 Arsene Ntwali Low Break :
Mix #: 3000DNA : Slump 5-9 air 0-3 Design Strength (psi): 3,000 @28 days : Lab Log No.: 17226 (3735)N PMA
EOR to Advise
7 day break 12/09/2021
Set 1 = 1,290 psi
28 day break 12/30/2021
Set 1 = 1,720 psi
56 day break 01/27/2022
Set 1 = 1,780 psi
90 day break 03/2/2022
Set 1 = 1,780 psi
25 1/19/2022
1-P/A.10 Low roof media
center
2-P/A.12 Lowroof media
center
3-A5/W Foundation plan
A
Roney Nakhoul Cohesion/Adhesion of SFRM Applied to Structural Members failure: Fireproofing material is not adhering to the
glue. Noted that material was wet to touch and 2 samples taken Y PMA 2/21/2022
Fireproofing material was given more
time to dry, plus warmer weather during
this dates testing resulted with the above
tests. Cohesion adhesion values exceed
requirements by project specs .
26 11/16/2021 Building A : N/b20, A5/S Arsene Ntwali Grout, low break: Design Strength (psi): 3,000 @28 days, Lab Log No.: 17087 (3651)Y PMA
1/19/2021
Page 13 of UNIT
MASONRY 04 2000-
13 Notes: 28-day
compressive
strength indicated,
but not less than
2000 psi
EOR to Advise
7 day break 11/23/2021
Set 1 = 2,300 psi
28 day break 12/14/2021
Set 1 = 2,660 psi
56 day break 01/11/2022
Set 1 = 3,300 psi
Set 1 = 3,330 psi
J5951 - Dennis Yarmouth Middle School - Exception Log Pages 4 of 5
27 11/18/2021 Building A :T.1/A7 Arsene Ntwali Grout, low break: Design Strength (psi): 3,000 @28 days, Lab Log No.: 17119 (3678)Y PMA
1/19/2021
Page 13 of UNIT
MASONRY 04 2000-
13 Notes: 28-day
compressive
strength indicated,
but not less than
2000 psi
EOR to Advise
7 day break 11/25/2021
Set 1 = 1,830 psi
28 day break 12/16/2021
Set 1 = 2,290 psi
56 day break 01/13/2022
Set 1 = 2,450 psi
90 day break 02/16/2022
Set 1 = 2,660 psi
28 11/18/2021 Building D: T.1/A7 Arsene Ntwali Concrete, low break: Design Strength (psi): 4,000 @28 days, Lab Log No.: 17282 (3681)N PMA
EOR to Advise
7 day break 11/25/2021
Set 1 = 2,060 psi
28 day break 12/16/2021
Set 1 = 2,580 psi
56 day break 01/13/2022
Set 1 = 3,220 psi
90 day break 02/16/2022
Set 1 = 3,350 psi
118 day break 03/16/2022
Set 1 = 3,580 psi
29 11/22/2021 Building A : T.1/A6 Arsene Ntwali Concrete, low break: Design Strength (psi): 3,000 @28 days, Lab Log No.: 17197 (3728)N PMA
EOR to Advise
7 day break 11/29/2021
Set 1 = 1,720 psi
28 day break 12/20/2021
Set 1 = 2,310 psi
56 day break 01/17/2022
Set 1 = 2,370 psi
90 day break 02/20/2022
Set 1 = 2,390 psi
30 12/27/2021 Level 2, L-K.8/b21-b22 Eric Pitman Grout, low break: Design Strength (psi): 2,500 @28 days: Lab Log No.: 17890 (4010)N PMA
EOR to Advise
32 day break 01/28/2022
Set 1 = 1,190 psi
56 day break 02/27/2022
Set 1 = 1,270 psi
90 day break 03/27/2022
Set 1 = 1,840 psi
118 day break 04/24/2022
Set 1 = 1,610 psi
31 2/9/2022 Grade on Level 1 at Line M.5-
Q, Row a18-Pass a30 Enea Mushi
Floor Levelness measurement did not meet project spec requirements.
3.9 FINISHING FLOORS AND SLABS
Specified overall values of flatness, F(F) 35; and of levelness, F(L) 25; with minimum local values of flatness, F(F)
24; and of levelness, F(L) 17; for slabs-on grade
N PMA EOR to Advise
32 1/12/2022 P.2-B.30 -B-32 Bernard
Connaughton Mortar low break: Design Strength (psi): 1,800 psi @ 28 days: Lab Log No.: 17776 N PMA
EOR to Advise
7 day break 01/19/2022
Set 1 = 1,060 psi
Set 1 = 1,190 psi
Set 1 = 1,250 psi
28 day break 02/09/2021
Set 1 =1,400 psi
56 day break 03/09/2022
Set 1 = 1,580 psi
90 day break 04/12/2022
Set 1 = 2,110 psi
33 1/11/2022 Gymnasium - East Elevation
at Line P.2-M.3-b33
Bernard
Connaughton Mortar low break: Design Strength (psi): 1,800 psi @ 28 days: Lab Log No.: 17775 N PMA
EOR to Advise
7 day break 01/18/2022
Set 1 = 630 psi
Set 1 = 740 psi
Set 1 = 770 psi
28 day break 02/08/2021
Set 1 = 840 psi
56 day break 03/08/2022
Set 1 = 890 psi
90 day break 04/11/2022
Set 1 = 1,010 psi
J5951 - Dennis Yarmouth Middle School - Exception Log Pages 5 of 5
34 1/24/2022 Gymnasium - at Line K/B33 Arsene Ntwali Mortar low break: Design Strength (psi): 1,800 psi @ 28 days: Lab Log No.: 17921 N PMA
EOR to Advise
7 day break 01/31/2022
Set 1 = 1,390 psi
Set 1 = 1,490 psi
Set 1 = 1,610 psi
28 day break 02/21/2021
Set 1 = 1,630 psi
56 day break 03/21/2022
Set 1 = 1,960 psi
Set 1 = 2,100 psi
35 1/21/2022 Gymnasium, Line J.7-b30-
b31, J.7-b25-b29 Arsene Ntwali Mortar low break: Design Strength (psi): 1,800 psi @ 28 days: Lab Log No.: 17913 N PMA
EOR to Advise
7 day break 01/28/2022
Set 1 = 1,270 psi
Set 1 = 1,300 psi
Set 1 = 1,400 psi
28 day break 02/18/2021
Set 1 = 1,630 psi
56 day break 03/18/2022
Set 1 = 2,050 psi
36 3/1/2022 Bldg B section 5 and section
11 Roney Nakhoul
Missing Bands:
Banding missing in several locations at the exterior face; sheathing needs to be removed to fix in the 11
section. Some of the inside bands also missing. This inspector observed that some studs were screwed into the
top track which they should not, as this is a deflection track. Studs at some of the curved walls need securing at
the bottom on both sides; these areas appear in progress
Y PMA 3/9/2022 Observed hex screws being installed for
the bracing in bldg B
37 2/24/2022 P.1/b26-30 Arsene Ntwali Mortar low break: Design Strength (psi): 1,800 psi @ 28 days: Lab Log No.: 18046 (4052)N PMA
EOR to Advise
7 day break 02/11/2022
Set 1 = 1,050 psi
Set 1 = 1,120 psi
Set 1 = 1,220 psi
28 day break 02/18/2021
Set 1 = 1,450 psi
Set 1 = 1,660 psi
Set 1 = 1,810 psi
38 3/30/2022 Building B Roney Nakhoul Work in Progress - Building B cold form metal framing N PMA Reinspection is required
39 4/12/2022 Level 1 Auditorium Seating
Rows 1, 3, 5
Bernard
Connaughton
Concrete in truck exceeded the 90 minutes batch to placement time by 35 minutes. Temperature was checked
after 100 minutes and at 115 minutes in the truck and remained at 70F. Truck fully discharged all concrete at 125
minutes.
N PMA
EOR to Advise
7 day break 4/19/22
Set 1 = 4,460 psi
28 day break 5/10/22
Set 1 = 5,950 psi
40 4/15/2022 Building C, Level 2 Roney Nakhoul Work in Progress - HVAC Duct near the C-D connector, east side, needs to be firestopped.N PMA Reinspection is required
Status: Work-in-Progress
Legend:
Status: Closed
Status: Open
TESTING
INSPECTION
ENGINEERINGNatick Lab: 12 Tech Circle, Natick, MA 01760
Field Number: 6 Masonry Mortar Compression Test
Project Name: Dennis Yarmouth Middle School Permit # : BLD-21-006153
Project No.:5951 Sampled by: James Descoteaux Report Date: 05/16/2022
Client: PMA Consultants, LLC
Date of Sampling: 05/09/2022 Lab Log No.: 19605 (4575)
Reviewed by: Edmychael Colon, Lab
Manager
05/16/2022
Date
ASTM Standards Used: Unless noted, material was sampled and tested in accordance with ASTM C172, C1019, C31, C143, C231, C470, C511, C1077,
C1231,C1064, C138 and E4. Compressive strength tests per ASTM C39.
Testing was performed by qualifed personnel in accordance with generally accepted industry practice, material testing consultants procedures and the above reference standards. This report is
applicable only to the items listed herein. The test performed and in this report are not intended to be considered as any guarantee or warranty of suitability for service or fitness of use of itemstested and it should not be relied on as such. The report has been prepared for the exclusive use of the client and any partial or whole reproduction without the consent of the client is prohibited.Pg. 1 of 1
Information provided by Field Technician
Mix #:Supplier:Contractor:
Set: 1 of 1 Truck #:Design Strength (psi): 1,800 @28
days Ticket#:
Sample Material/Shape: ASTM C780 A7.6 Compressive Testing of Masonry
Mortar (Cubes)Type of Structure: wall
Location: Onsite
Location for overall pour:
Location when sampled: Locker Room Wall B27.2/W
Concrete Quality Actual Req'ment Actual Req'ment Actual Req'ment
Mix Temperature (ºF):54 50-90 Slump (in.):N/A N/A Unit Wt (#cu ft):N/A
Air Temperature (ºF):50 >40 Air Content (%):N/A Time Sampled:11:00 AM
Aggregate Size (in):N/A Batch Time:10:45 AM Time in Truck:15
minutes <90 Mins
Information supplied by Laboratory Technician
Date Received: 05/18/2022 Technician that received: MN
Test #Age of
Test (Days)Date Technician Dimensions (inch)X-section Total Load
(lbs)Strength (psi)Width Width Height Area (in²)
A 7 05/16/2022 Roshan Yadav 1.98 1.94 1.98 3.84 5,364 1,400 psi
B 7 05/16/2022 Roshan Yadav 1.98 1.98 1.99 3.92 6,433 1,640 psi
C 7 05/16/2022 Roshan Yadav 1.97 1.98 1.99 3.90 5,990 1,540 psi
D 28 06/06/2022
E 28 06/06/2022
F 28 06/06/2022
7 Day Avg.:1530
Remarks: Received Sample Condition: Acceptable and/or Satisfactory
TESTING
INSPECTION
ENGINEERINGNatick Lab: 12 Tech Circle, Natick, MA 01760
Field Number: 5 Laboratory Compression Test (4x8)
Project Name: Dennis Yarmouth Middle School Permit # : BLD-21-006153
Project No.:5951 Sampled by: Eric Pittman Report Date: 05/19/2022
Client: PMA Consultants, LLC
Date of Sampling: 04/21/2022 Lab Log No.: 19206
Reviewed by: Edmychael Colon, Lab
Manager
05/19/2022
Date
ASTM Standards Used: Unless noted, material was sampled and tested in accordance with ASTM C172, C31, C143, C231, C470, C511, C1077,
C1231,C1064, C138 and E4. Compressive strength tests per ASTM C39.
Testing was performed by qualifed personnel in accordance with generally accepted industry practice, material testing consultants procedures and the above reference standards. This report is
applicable only to the items listed herein. The test performed and in this report are not intended to be considered as any guarantee or warranty of suitability for service or fitness of use of itemstested and it should not be relied on as such. The report has been prepared for the exclusive use of the client and any partial or whole reproduction without the consent of the client is prohibited.Pg. 1 of 1
Information provided by Field Technician
Mix #: 4000 D 3/4 Supplier: Cape Cod Ready Mix Contractor: Marguerite
Set: 1 of 1 Truck #: 74 Design Strength (psi): 4,000 @28
days Ticket#: 34568
Sample Material/Shape: ASTM C39 Compressive Strength of Cylindrical
Concrete Specimens (4x8)Type of Structure: Slab on Grade
Location: Onsite
Location for overall pour: ext. sitework Slab on Grade at slab #1 for field sports storage shed
Location when sampled: Pad #1
Concrete Quality Actual Req'ment Actual Req'ment Actual Req'ment
Mix Temperature (ºF):63 50-90 Slump or Spread (in.):5.25 4-7 Unit Wt (#cu ft):N/A
Air Temperature (ºF):53 >40 Air Content (%):7.5 4.5-7.5 Time Sampled:1:10 PM
Aggregate Size (in):3/4 3/4 Batch Time:12:20 PM Time in Truck:50 minutes <90 Mins
Information supplied by Laboratory Technician
Date Received: 04/25/2022 Technician that received: MN
Test #
Age of
Test
(Days)
Date Technician Diameter Length Area (in²)Cure Loc Ultimate Load
(lbs)
Compressive
Strength (psi)
Type of
Fracture
A 7 04/28/2022 Roshan Yadav 4.00 8.00 12.57 Lab 56,055 4,460 psi Type 2
B 28 05/19/2022 Roshan Yadav 4.00 8.00 12.57 Lab 75,095 5,970 psi Type 2
C 28 05/19/2022 Roshan Yadav 4.00 8.00 12.57 Lab 72,668 5,780 psi Type 2
D 28 05/19/2022 Roshan Yadav 4.00 8.00 12.57 Lab 68,970 5,490 psi Type 2
E H H 4.00 8.00 12.57 Lab
MEETS DESIGN STRENGTH
28 Day Avg.:5,750 psi
Remarks: Received Sample Condition: Acceptable and/or Satisfactory
TESTING
INSPECTION
ENGINEERINGNatick Lab: 12 Tech Circle, Natick, MA 01760
Field Number: 5 Laboratory Compression Test (4x8)
Project Name: Dennis Yarmouth Middle School Permit # : BLD-21-006153
Project No.:5951 Sampled by: Eric Pittman Report Date: 05/19/2022
Client: PMA Consultants, LLC
Date of Sampling: 04/21/2022 Lab Log No.: 19207
Reviewed by: Edmychael Colon, Lab
Manager
05/19/2022
Date
ASTM Standards Used: Unless noted, material was sampled and tested in accordance with ASTM C172, C31, C143, C231, C470, C511, C1077,
C1231,C1064, C138 and E4. Compressive strength tests per ASTM C39.
Testing was performed by qualifed personnel in accordance with generally accepted industry practice, material testing consultants procedures and the above reference standards. This report is
applicable only to the items listed herein. The test performed and in this report are not intended to be considered as any guarantee or warranty of suitability for service or fitness of use of itemstested and it should not be relied on as such. The report has been prepared for the exclusive use of the client and any partial or whole reproduction without the consent of the client is prohibited.Pg. 1 of 1
Information provided by Field Technician
Mix #: 4000 DGRNA Supplier: Cape Cod Ready Mix Contractor: Gorilla
Set: 1 of 1 Truck #: 67 Design Strength (psi): 4,000 @28
days Ticket#: 34559
Sample Material/Shape: ASTM C39 Compressive Strength of Cylindrical
Concrete Specimens (4x8)Type of Structure: Slab on Metal Deck
Location: Onsite
Location for overall pour: level 1 Slab on Metal Deck at T-P/a7, auditorium seating upper two tiers
Location when sampled: S/a7
Concrete Quality Actual Req'ment Actual Req'ment Actual Req'ment
Mix Temperature (ºF):61 50-90 Slump or Spread (in.):6 6-8 Unit Wt (#cu ft):N/A
Air Temperature (ºF):52 >40 Air Content (%):3 0-3 Time Sampled:8:35 AM
Aggregate Size (in):3/8 3/8 Batch Time:7:47 AM Time in Truck:48 minutes <90 Mins
Information supplied by Laboratory Technician
Date Received: 04/25/2022 Technician that received: MN
Test #
Age of
Test
(Days)
Date Technician Diameter Length Area (in²)Cure Loc Ultimate Load
(lbs)
Compressive
Strength (psi)
Type of
Fracture
A 7 04/28/2022 Roshan Yadav 4.00 8.00 12.57 Lab 41,734 3,320 psi Type 5
B 28 05/19/2022 Roshan Yadav 4.00 8.00 12.57 Lab 54,136 4,310 psi Type 2
C 28 05/19/2022 Roshan Yadav 4.00 8.00 12.57 Lab 59,598 4,740 psi Type 2
D 28 05/19/2022 Roshan Yadav 4.00 8.00 12.57 Lab 55,240 4,390 psi Type 2
E H H 4.00 8.00 12.57 Lab
MEETS DESIGN STRENGTH
28 Day Avg.:4,480 psi