HomeMy WebLinkAboutRevision of Approval MassDEP Commonwealth of Massachusetts
Executive Office of Energy &Environmental Affairs
Department of Environmental Protection
One Winter Street Boston, MA 02108.617-292-5500
DEVAL L PATRICK RICHARD K.SULLIVAN JR.
Governor Secretary
TIMOTHY P.MURRAY KENNETH L.KIMMELL
Lieutenant Governor Commissioner
REVISION OF APPROVAL FOR REMEDIAL USE
Pursuant to Title 5, 310 CMR 15.00 Gamu ViJ
Name and Address of Applicant: SEP 2 1 2021
Bio-Microbics, Inc. HEALTH DEPT.
8450 Cole Parkway
Shawnee,KS 66227
Trade name of technology and models: MicroFAST®Treatment System Models MicroFAST®
0.5, 0.75, 0.9, 1.5, 3.0, 4.5 and 9.0; HighStrengthFAST® Treatment System Models
HighStrength FAST® 1.0, 1.5, 3.0, 4.5 and 9.0 and NitriFASTti Treatment System Models
NitriFAST® 0.5, 0.75, 1.0, 1.5, 3.0, 4.5 and 9.0(hereinafter called the"System"). Schematic
Drawings illustrating each System, a design and installation manual, an owner's manual,an
operation and maintenance manual, and an inspection checklist are part of this Approval.
Transmittal Number: W 072367
Date of Issuance: June 16, 2006(modified January 23, 2008)
Revision date: November 05, 2012
Authority for Issuance
Pursuant to Title 5 of the State Environmental Code, 310 CMR 15.000, the Department of
Environmental, Protection hereby issues this Approval for Remedial Use to: Bio-Microbics,
Inc.,8450 Cole Parkway, Shawnee, KS 66227, (hereinafter "the Company"), approving the
System described herein for Remedial Use in the Commonwealth of Massachusetts. The sale,
design, installation, and use of the System are conditioned on compliance by the Company, the
Designer, the Installer, the Service Contractor, and the System Owner with the terms and
conditions set forth below. Any noncompliance with the terms or conditions of this Approval
constitutes a violation of 310 CMR 15.000.
November 05, 2012
David Ferris, Director Date
Wastewater Management Program,
Bureau of Resource Protection
This information is available in alternate format.Call Michelle Waters-Ekanem,Diversity Director,at 617-292-5751.TDD#1-866-539-7622 or 1.617-574-6868
MassDEP Website:www.mass.govldep
Printed on Recycled Paper
biomicro.doc
ti Bio-Microbics,Inc.-MicroFAST®,HighStrengthFAST®,NitriFAST®
Revision of Approval for Remedial Use
Revision Date:November 05,2012
Page 2 of 3
Technology Description
The System is a Secondary Treatment Unit(STU). The Systems,MicroFAST®0.5, 0.75, 0.9,
1.5, 3.0, 4.5 and 9.0, and HighStrengthFAST® 1.0, 1.5, 3.0, 4.5 and 9.0, and,NitriFAST®0.5,
0.75, 0.9, 1.5, 3.0, 4.5 and 9.0 units are installed in a tank or tanks having a primary settling zone
and an aerobic biological zone. Solids settle in the primary settling zone that is quiescent. In the
aerobic zone,the sewage is continually agitated and aerated. Bacteria in the sewage attach to the
surface of a submerged plastic media; they reproduce by consuming the organic material in the
sewage.
Conditions of Approval
The term"System"refers to the STU in combination with the other components of an on-site
treatment and disposal system that may be required to serve a facility in accordance with 310
CMR 15.000.
The term"Approval"refers to the technology-specific Special Conditions,the conditions
applicable to all STU's with Remedial Use Approval,the General Conditions of 310 CMR
15.287, and any Attachments.
For Secondary Treatment Units that have been issued Remedial Use Approval for the
upgrade or replacement of an existing failed or nonconforming system., the Department
authorizes reductions in the effective leaching area(310 CMR 15.242), the depth to groundwater
(310 CMR 15.212), and/or the depth of naturally occurring pervious material(310 CMR
15.240(1)) subject to the conditions that apply to all Secondary Treatment Units Approved for
Remedial Use and subject to the Special Conditions applicable to the Technology.
Special Conditions
1. The System is Secondary Treatment Unit Approved for Remedial Use. In addition to the
Special Conditions contained in this Approval, the System shall comply with all the
"Standard Conditions for Secondary Treatment Units Approved for Remedial Use", except
where stated otherwise in these Special Conditions.
2. The System is approved for facilities where the local approving authority finds that:
a) there is no increase in the actual or proposed design flow;
b) the System is for the upgrade of a failed, failing or nonconforming system; and
c) a conventional system with a reserve area, designed in accordance with the standards of
310 CMR 15.100 through 15.255, cannot feasibly be built on-site.
biomicro.doc
Bio-Microbics,Inc.-MicroFAST®,HighStrengthFAST®,NitriFAST®
Revision of Approval for Remedial Use
Revision Date:November 05,2012
Page 3 of 3
3. The MicroFAST®0.5, 0.75 and 0.9, HighStrengthFAST® 1.0 and NitriFAST® 0.5, 0.75 and
0.9 are installed in the second compartment of a two-compartment tank with a total liquid
capacity of at least 1,500 gallons constructed in accordance with 310 CMR 15.226.
4. The MicroFAST®, HighStrengthFAST® and NitriFAST® 1.5 are installed in the second
compartment of a two compartment 3,000-gallon tank constructed in accordance with 310 CMR
15.226.
5. The MicroFAST®,HighStrengthFAST® and NitriFAST® 3.0,4.5, and 9.0 units are installed in
a separate tank constructed in accordance with 310 CMR 15.226. The units are located between
a standard Title 5 septic tank, designed in accordance with 310 CMR 15.223 and 15.224, and
the soil adsorption system(SAS).
6. Access shall be provided to all tanks in the primary settling and aerobic biological zones in
accordance with 310 CMR 15.228 (2). The primary settling tank shall have at least three
manholes with readily removable impermeable covers of durable material provided at grade.
Two manholes, over the inlet and outlet of the primary settling tank, shall have a minimum
opening of 20 inches. All access ports and manhole covers shall be installed and maintained at
grade to allow for maintenance of the System.
biomicro.doc