HomeMy WebLinkAboutEngineer Certification Letter !� :(tb JC ENGINEERING, Inc.
1,1''`-V\ Civil & Environmental Engineering
`4424,- 2854 Cranberry Highway
•_ .1 East Wareham, Massachusetts 02538
Ph. 508-273-0377—Fax 508-273-0367
June 3,2022
Mr. Bruce G. Murphy
Health Director
Town of Yarmouth
Health Division
1146 Route 28
South Yarmouth,MA 02664
RE: Substantial Compliance for Newly Installed Septic System Located at
83 Quartermaster Row, South Yarmouth, Massachusetts
Dear Mr. Murphy:
This letter is to certify that the new septic system located at 83 Quartermaster Row was
constructed in substantial compliance with the approved design plan entitled, Proposed Septic
System Upgrade,dated February 23, 2022, prepared by our office. See attached as-built plan
provided by the contractor(Robert B. Our Co., Inc.).
Should you have any questions or comments,please do not hesitate to contact our office.
Sincer ly,
RECEIVED
JUN 0 2 2022
John L. Chu ,Jr., PE,PLS HEALTH DEPT.
President
JLC/mcp
cc: RBO
File