Loading...
HomeMy WebLinkAboutEngineer Certification Letter !� :(tb JC ENGINEERING, Inc. 1,1''`-V\ Civil & Environmental Engineering `4424,- 2854 Cranberry Highway •_ .1 East Wareham, Massachusetts 02538 Ph. 508-273-0377—Fax 508-273-0367 June 3,2022 Mr. Bruce G. Murphy Health Director Town of Yarmouth Health Division 1146 Route 28 South Yarmouth,MA 02664 RE: Substantial Compliance for Newly Installed Septic System Located at 83 Quartermaster Row, South Yarmouth, Massachusetts Dear Mr. Murphy: This letter is to certify that the new septic system located at 83 Quartermaster Row was constructed in substantial compliance with the approved design plan entitled, Proposed Septic System Upgrade,dated February 23, 2022, prepared by our office. See attached as-built plan provided by the contractor(Robert B. Our Co., Inc.). Should you have any questions or comments,please do not hesitate to contact our office. Sincer ly, RECEIVED JUN 0 2 2022 John L. Chu ,Jr., PE,PLS HEALTH DEPT. President JLC/mcp cc: RBO File