HomeMy WebLinkAboutEngineer Certification Letter JC ENGINEERING, Inc.
c A` _ 4 t Civil & Environmental Engineering
'� ,t 2854 Cranberry Highway
East Wareham, Massachusetts 02538
Ph. 508-273-0377—Fax 508-273-0367
May 27, 2022
Mr. Bruce G. Murphy
Health Director
Town of Yarmouth
Health Division
1146 Route 28
South Yarmouth, MA 02664
RE: Substantial Compliance for Newly Installed Septic System Located at
27 Crowes Purchase Road, West Yarmouth, Massachusetts
Dear Mr. Murphy:
This letter is to certify that the new septic system located at 27 Crowes Purchase Road was
constructed in substantial compliance with the approved design plan entitled, Proposed Septic
System Upgrade, dated March 12, 2022,prepared by our office. See attached as-built plan
provided by the contractor(Robert B. Our Co., Inc.).
Should you have any questions or comments, please do not hesitate to contact our office.
Sincerely,
RECEIVED
MAY 2 7 7022
John L. Churchill, Jr., PE, PLS HEALTH DEPT
President
JLC/mcp
cc: RBO
File