HomeMy WebLinkAboutReview Checklist TOWN OF YARMOUTH
SEWAGE PLAN REVIEW CHECKLIST
Location: A.M. Lofe9.013 Zone of Contribution: In Out Acreage
Commercial: Residential:
Street: 1/1/4..irle p eit,ci'N c .e.
Village: Floor Plan: #Bedrooms:
Owner: R`//,� f/v a c{ Installer: D /• 7 Co sir& c!i'(}c�
Address: Phone:
Phone:
Builder: Engineer: & - , li a 4 .,'-
Address: Phone:
Phone:
N/A YES NO
1.Required#of copies received /
2.Date of soils exam and percolation test not older than 2 years
3.4-5 ft of naturally occurring pervious material,above water table ti✓
4.Foundation 2 ft above high point of road H.P.: Fnd: Var.: ✓
5. Water line 10 ft from septic components Var.: 14,-
6.Benchmark indicated and shown-NGVD if near wetlands
7. Septic tank minimum 10 ft from foundation, deck Var.: ✓
8.Leaching minimum 20 ft full, 15 ft crawl, 10 ft slab Var.: .10 #-Ila f• ;0 u' V.--
•
9. Leaching minimum 100 ft from wetlands Var.:
10.Leaching minimum 150 ft from drinking well/25 ft irrigation well Var.: f
11.Tank/leaching minimum 10 ft from property line Var.: l -
12. System meets all other setback requirements Var.:
13.Uses adjustment for maximum high groundwater Var.:
14.Leaching set 4-5 ft above adj. water or bottom of test hole Var.`. --,-�
15. System not in top or subsoil(A,B horizons)or 5' removal /
16.Proposed contours are suitable �--�
17. System meets slope requirements-min. 1/8", '4"preferred
18. System meets breakout requirements PVC liner: Wall:
19. Specified tee sizes are proper,gas baffle on outlet tee
20. Sewage is under 10,000 gpd for parcel %./y-
21.No garbage disposal
22. System adequately sized for its intended use
23.Minimum 6"stone or compacted below tank and dbox ‘✓
24.Manhole covers within 6"of grade,pump chamber cover to grade
25. Inspection port on plastic chambers/leach field
26. Electrical permit for pump chamber/Separate meter for duplexes l
27.Pump system-2"line,weep hole,check valve,tee in dbox,pump size
28. Septic tank/pump chamber to be factory waterproofed
29. Vent provided if leaching below 3 feet,under driveway/parking
30.Buoyancy calculations for tank/pump chamber v.'
31. Engineer to inspect and certify soils: wall: commercial:
32. Engineer/Registered Sanitarian and Land Surveyor stamps/signature f
33.H-20 loading is subject to vehicular traffic,groundwater ,/"
34.Title V Application and permit fee,installer signature r�
35. Foundation footing min. 2 feet above adjusted ground water for new house L7../
36.Deed Restriction required max. #bedrooms: max. flow: gpd [7-
37. Check area lots for groundwater/Label groundwater in Assessor's Map
N PIan reviewed by:_ � 6 03 01