TOWN OF YARMOUTH /E m
SEWAGE PLAN REVIEW CHECKLIST //,/r' , `1 w
Location: A.M. f,Lot 2- / Zone of Contribution: In . Out_ Acr ge % �i 4-7-3 C�.L
Cbmmercial: Residential: �o
Street:
Village: %2 G C I/ Floor Plan: #Bedrooms:
Owner: ‘F- 7/xx-2,74- Installer:
Address: Phone: ni7;e7(
)- 1 0
Phone:
Builder: Engineer:
Address: Phone: 47'7 / 5
Phone:
N/A YES NO
1. Required# of copies received
_ 2. Date of soils exam and percolation test not older than 2 years
3. 4-5 ft of naturally occurring pervious material, above water table
_ 4. Foundation 2 ft above high point of road H.P.:• Fnd: Var.:
5. Water line 10 ft from septic components Var.:
6. Benchmark indicated and shown-NGVD if near wetlands
7. Septic tank minimum 10 ft from foundation, deck Var.:
8. Leaching minimum 20 ft full, 15 ft crawl, 10 ft slab Var.:
9. Leaching minimum 100 ft from wetlands Var.:
10. Leaching minimum 150 ft from drinking well/25 ft irrigation well Var.:
11. Tank/leaching minimum 10 ft from property line Var.:
12. System meets all other setback requirements Var.:
13. Uses adjustment for maximum high groundwater Var.:
14. Leaching set 4-5 ft above adj. water or bottom of test hole Var.:
15. System not in top or subsoil(A,B horizons)or 5' removal
16.Proposedcontours are suitable
17. System meets slope requirements-min. 1/8", 1/4"preferred
18. System meets breakout requirements PVC liner: Wall:
1'9. Specified tee sizes are proper, gas baffle on outlet tee
20. Sewage is under 10,000 gpd for parcel
1.No garbage disposal
22. System adequately sized for its intended use
_23. Minimum 6"stone or compacted below tank and dbox
24. Manhole covers within 6"of grade, pump chamber cover to grade
25. Inspection port on plastic chambers/leach field
26. Electrical permit for pump chamber/Separate meter for duplexes
_27.Pump system-2" line,weep hole,check valve,tee in dbox, pump size •
28. Septic tank/pump chamber to be factory waterproofed
29. Vent provided if leaching below 3 feet, under driveway/parking
30. Buoyancy calculations for tank/pum, chamber
31. Engineer to inspect and certify soils: wall: commercial:
^32. Engineer/Registered Sanitarian and Land Surveyor stamps/signature
33. H-20 loading is subject to vehicular traffic, groundwater
34. Title V Application and permit fee, installer signature
35. Foundation footing min. 2 feet above adjusted ground water for new house
36. Deed Restriction required max. #bedrooms: max. flow: gpd
37. Check area lots for groundwater/Label groundwater in Assessor's Map
Plan reviewed by: 6/03/03