Loading...
HomeMy WebLinkAboutReview Checklist 22- TOWN OF YARMOUTH /E m SEWAGE PLAN REVIEW CHECKLIST //,/r' , `1 w Location: A.M. f,Lot 2- / Zone of Contribution: In . Out_ Acr ge % �i 4-7-3 C�.L Cbmmercial: Residential: �o Street: Village: %2 G C I/ Floor Plan: #Bedrooms: Owner: ‘F- 7/xx-2,74- Installer: Address: Phone: ni7;e7( )- 1 0 Phone: Builder: Engineer: Address: Phone: 47'7 / 5 Phone: N/A YES NO 1. Required# of copies received _ 2. Date of soils exam and percolation test not older than 2 years 3. 4-5 ft of naturally occurring pervious material, above water table _ 4. Foundation 2 ft above high point of road H.P.:• Fnd: Var.: 5. Water line 10 ft from septic components Var.: 6. Benchmark indicated and shown-NGVD if near wetlands 7. Septic tank minimum 10 ft from foundation, deck Var.: 8. Leaching minimum 20 ft full, 15 ft crawl, 10 ft slab Var.: 9. Leaching minimum 100 ft from wetlands Var.: 10. Leaching minimum 150 ft from drinking well/25 ft irrigation well Var.: 11. Tank/leaching minimum 10 ft from property line Var.: 12. System meets all other setback requirements Var.: 13. Uses adjustment for maximum high groundwater Var.: 14. Leaching set 4-5 ft above adj. water or bottom of test hole Var.: 15. System not in top or subsoil(A,B horizons)or 5' removal 16.Proposedcontours are suitable 17. System meets slope requirements-min. 1/8", 1/4"preferred 18. System meets breakout requirements PVC liner: Wall: 1'9. Specified tee sizes are proper, gas baffle on outlet tee 20. Sewage is under 10,000 gpd for parcel 1.No garbage disposal 22. System adequately sized for its intended use _23. Minimum 6"stone or compacted below tank and dbox 24. Manhole covers within 6"of grade, pump chamber cover to grade 25. Inspection port on plastic chambers/leach field 26. Electrical permit for pump chamber/Separate meter for duplexes _27.Pump system-2" line,weep hole,check valve,tee in dbox, pump size • 28. Septic tank/pump chamber to be factory waterproofed 29. Vent provided if leaching below 3 feet, under driveway/parking 30. Buoyancy calculations for tank/pum, chamber 31. Engineer to inspect and certify soils: wall: commercial: ^32. Engineer/Registered Sanitarian and Land Surveyor stamps/signature 33. H-20 loading is subject to vehicular traffic, groundwater 34. Title V Application and permit fee, installer signature 35. Foundation footing min. 2 feet above adjusted ground water for new house 36. Deed Restriction required max. #bedrooms: max. flow: gpd 37. Check area lots for groundwater/Label groundwater in Assessor's Map Plan reviewed by: 6/03/03