Loading...
Review Checklist VItt: TOWN OF YARMOUTH SEWAGE PLAN REVIEW CHECKLIST�/ 1- Location: A.M. Lot Zone of Contribution: In ✓� Out Acreage Street: I 4S eke K.�'�, Mirt 11 l(, ( Commercial: Residential: Village: Floor Plan: /C5 #Bedrooms: 3 Owner: Installer: Address: Phone: Phone: Builder: Engineer: S V/ ,t /✓ Address: Phone: Phone: I N/A YES NO 1.Required# of copies received 2. Date of soils exam and percolation test not older than 2 years ,/-- • 3. 4-5 ft of naturally occurring pervious material, above water table 4. Foundation 2 ft above high point of road H.P.: Fnd: Var.: 1.-.'--- 5. Water line 10 ft from septic components Var.: 6. Benchmark indicated and shown=NGVD if near wetlands 7. Septic tank minimum 10 ft from foundation, deck Var.: 8. Leaching minimum 20 ft full, 15 ft crawl, 10 ft slab Var.: 9. Leaching minimum 100 ft from wetlands Var.: t 10. Leaching minimum 150 ft from drinking well/25 ft irrigation well Var.: ,/ 11. Tank/leaching minimum 10 ft from property line Var.: ,/ 12. System meets all other setback requirements Var.: •------- 13. j13. Uses adjustment for maximum high groundwater Var.: ,/- 14. Leaching set 4-5 ft above adj. water or bottom of test hole Var.: ..----- 15. /15. System not in top or subsoil(A,B horizons) or 5' removal 16.Proposed contours are suitable 17. System meets slope requirements-min. 1/8", 1/4"preferred t.------- 18. 18. System meets breakout requirements PVC liner: Wall: g----- 19. Specified tee sizes are proper, gas baffle on outlet tee 20. Sewage is under 10,000 gpd for parcel .------ 21. No garbage disposal v I 22. System adequately sized for its intended use ✓ 23. Minimum 6"stone or compacted below tank and dbox 24. Manhole covers within 6" of grade, pump chamber cover to grade 1 .- , 25. Inspection port on plastic chambers/leach field i/--- 26. Electrical permit for pump chamber/Separate meter for duplexes ,/ 27.Pump system-2" line,weep hole,check valve, tee in dbox, pump size 28. Septic tank/pump chamber to be factory waterproofed -0X/51114y- 29. p)(/', 14 y- 29. Vent provided if leaching below 3 feet, under driveway/parking 30. Buoyancy calculations for tank/pump chamber 31. Engineer to inspect and certify soils: wall: commercial: s.--"'" 32. Engineer/Registered Sanitarian and Land Surveyor stamps/signature s 33. H-20 loading is subject to vehicular traffic, groundwater 34. Title V Application and permit fee, installer signature 35. Foundation footing min. 2 feet above adjusted ground water for new house V 36. Deed Restriction required max. 3 #bedrooms: max. flow: gpd 37. Check area lots for groundwater/Label groundwater in Assessor's Map Plan reviewed by: /1/01/t. 6/03/03