Loading...
HomeMy WebLinkAboutReview Checklist TOWN OF YARMOUTH SEWAGE PLAN REVIEW CHECKLIST Location: A.M. - i Lot WI Zone of Contribution: In Out Ci Acreage ,, Commercial: Residential: - Street: iq VVtt� kQ Village: Floor Plan: ties # Bedrooms: l Owner: A d/till bed/1 l04LO-- Installer: $ E c4 Vitfi: ,14 Address: Phone: Phone: Builder: Engineer: WI VC '1,4,111.441 Address: Phone: Phone: 77/f N/A YES , NO 1.Required# of copies received V 2. Date of soils exam and percolation test not older than 2 years V 3. 4-5 ft of naturally occurring pervious material, above water table 4.Foundation 2 ft above high point of road H.P.: Fnd: Var.: 7- 5. Water line 10 ft from septic components Var.: V' - 6. Benchmark indicated and shown-NGVD if near wetlands 7. Septic tank minimum 10 ft from foundation, deck Var.: ✓ 8. Leaching minimum 20 ft full, 15 ft crawl, 10 ft slab Var.: 9.Leaching minimum 100 ft from wetlands Var.: ✓ 10. Leaching minimum 150 ft from drinking well/25 ft irrigation well Var.: t/ 11. Tank/leaching minimum 10 ft from property line Var.: 12. System meets all other setback requirements Var.: 13. Uses adjustment for maximum high groundwater Var.: 14. Leaching set 4-5 ft above adj. water or bottom of test hole Var.: 15. System not in top or subsoil(A,B horizons) or 5' removal i<:, 16.Proposed contours are suitable !/ 17. System meets slope requirements-min. 1/8", '/"preferred 18. System meets breakout requirements PVC liner: Wall: i/ 19. Specified tee sizes are proper, gas baffle on outlet tee ✓ :. 20. Sewage is under 10,000 gpd for parcel 21.No garbage disposal f 22. System adequately sized for its intended use 1 23.Minimum 6"stone or compacted below tank and dbox 24.Manhole covers within 6" of grade,pump chamber cover to grade l,/' 25. Inspection port on plastic chambers/leach field V 26. Electrical permit for pump chamber/Separate meter for duplexes 27.Pump system-2" line,weep hole,check valve, tee in dbox, pump size V 28. Septic tank/pump chamber to be factory waterproofed 7 29. Vent provided if leaching below 3 feet, under driveway/parking ,ai :uoyancy calculations for tank/ ump chamber b< ngineer to inspect and certify (i it It soils: wall: commercial: ,/ a, ngineer/Registered Sanitarian and Land Surveyor stamps/signature Ih tSS rlj L� YID/i f. f?/ay X 3. H-20 loading is subject to vehicular traffic, groundwater . 34. Title V Application and permit fee, installer signature i 35. Foundation footing min. 2 feet above adjusted ground water for new house 36. Deed Restriction required max. #bedrooms: max. flow: gpd 37. Check area lots for groundwater/Label groundwater in AsseiA......ssor's Map ✓ Plan reviewed by: �, &03/o3