Loading...
HomeMy WebLinkAboutReview Checklist TOWN OF YARMOUTH .. SEWAGE PLAN REVIEW CHECKLIST x Location: A.M. Lot Zone of Contribution: In Out )(Acreage Commercial: Residential: -)(- Street: 2 g a ru,f 4t- l••1 Village: Floor Plan: irc #Bedrooms: 2, / Owner: Installer: ill I • t- 13° F1 i Address: Phone: Phone: -J2wc CNe Builder: Engineer: Address: Phone: Phone: N/A YES NO 1. Required#of copies received 2. Date of soils exam and percolation test not older than 2 years 3. 4-5 ft of naturally occurring pervious material, above water table v 4. Foundation 2 ft above high point of road H.P.: Fnd: Var.: V' 5. Water line 10 ft from septic components Var.: 6. Benchmark indicated and shown-NGVD if near wetlands v 7. Septic tank minimum 10 ft from foundation, deck Var.: ✓ 8. Leaching minimum 20 ft full, 15 ft crawl, 10 ft slab Var.: r/ 9. Leaching minimum 100 ft from wetlands Var.: r/ 10. Leaching minimum 150 ft from drinking well/25 ft irrigation well Var.: 1/- 11.Tank/leaching minimum 10 ft from property line Var.: v/ 12. System meets all other setback requirements Var.: ` Uses adjustment for maximum high groundwater Var.: .'j nd/J wriki4,14- 1/- .. . Leaching set 4-5 ft above adj. water or bottom of test hole Var.: 1' 1/4,1444im t z X.. 15. System not in top or subsoil(A,B horizons)or 5' removal 0 16. Proposed contours are suitable 17. System meets slope requirements-min. 1/8", 1/4"preferred / ✓ 18. System meets breakout requirements PVC liner: ✓ Wall: 19. Specified tee sizes are proper, gas baffle on outlet tee t . 20. Sewage is under 10,000 gpd for parcel t/ 21.No garbage disposal ✓ 22. System adequately sized for its intended use x/ 23. Minimum 6"stone or compacted below tank and dbox 24. Manhole covers within 6"of grade,pump chamber cover to grade VInspection port on plastic chambers/leach field Electrical permit for pump chamber/Separate meter for duplexes )( 27. Pump system-2"line,weep hole,check valve,tee in dbox,pump size I/ 28. Septic tank/pump chamber to be factory waterproofed 29. Vent provided if leaching below 3 feet,under driveway/parking 30. Buoyancy calculations for tank/pump chamber ✓ 31. Engineer to inspect and certify soils: wall: commercial: 1(. - 32. Engineer/Registered Sanitarian and Land Surveyor stamps/signature 33. H-20 loading is subject to vehicular traffic, groundwater 34. Title V Application and permit fee, installer signature v/ 35. Foundation footing min. 2 feet above adjusted ground water for new house ✓ / 36. Deed Restriction required max. #bedrooms: 2-max. flow: ZZp gpd ✓ Check area lots for groundwater/Label groundwater in Assessor's Map ✓ Plan reviewed by: 6/03/03