Loading...
HomeMy WebLinkAboutReview Checklist TOWN OF YARMOUTH SEWAGE PLAN REVIEW CHECKLIST Location: A.M. Lot Zone of Contribution: In Out Acreage O ^- ryG f=I L Commercial: esidential: X Street: (SIA- �1'' Village: Floor Plan: e5 #Bedrooms: S Owner: Installer: Yq1,c(. --i3Wi- u,LA-- Address: Phone: Phone: �, ' ,/ Builder: Engineer:_g/i'v�i! ' Address: Phone: Phone: N/A YES NO 1.Required#of copies received �// 2. Date of soils exam and percolation test not older than 2 years 3. 4-5 ft of naturally occurring pervious material, above water table ✓ Foundation 2 ft above high point of road H.P.: Fnd: Var.: ater line 10 ft from septic components Var.: ��(/tit/I x .. Benchmark indicated and shown-NGVD if near wetlands 7. Septic tank minimum 10 ft from foundation, deck Var.: ✓,.,. 8. Leaching minimum 20 ft full, 15 ft crawl, 10 ft slab Var.: t/ 9. Leaching minimum 100 ft from wetlands Var.: / 10. Leaching minimum 150 ft from drinking well/25 ft irrigation well Var.: 11. Tank/leaching minimum 10 ft from property line Var.: 12. System meets all other setback requirements Var.: 13.Uses adjustment for maximum high groundwater Var.: 14. Leaching set 4-5 ft above adj. water or bottom of test hole Var.: 15. System not in top or subsoil(A,B horizons)or 5' removal 16. Proposed contours are suitable ./:,,, 17. System meets slope requirements-min. 1/8", `/"preferred >� 18. System meets breakout requirements PVC liner: Wall: 19. Specified tee sizes are proper, gas baffle on outlet tee 20. Sewage is under 10,000 gpd for parcel 21.No garbage disposal ✓/ 22. System adequately sized for its intended use ✓/ 23. Minimum 6"stone or compacted below tank and dbox y24.Manhole covers within 6"of grade,pump chamber cover to grade � 25. Inspection port on plastic chambers/leach field / 26. Electrical permit for pump chamber/Separate meter for duplexes ✓/ 27.Pump system-2"line,weep hole,check valve,tee in dbox,pump size 28. Septic tank/pump chamber to be factory waterproofed / 29. Vent provided if leaching below 3 feet,under driveway/parking ✓/ 30.Buoyancy calculations for tank/pump chamber 6/ 31.Engineer to inspect and certify soils: wall: commercial: Y (7 32.Engineer/Registered Sanitarian and Land Surveyor stamps/signature / �/ 33.H-20 loading is subject to vehicular traffic, groundwater �J 34.Title V Application and permit fee, installer signature / 35.Foundation footing min. 2 feet above adjusted ground water for new house ✓� 36. Deed Restriction required max. #bedrooms: max. flow: gpd t./ 37. Check area lots for groundwater/Label groundwater�in 1Asssessor's Map Plan reviewed by: )1 B�� ( 6/03/03