HomeMy WebLinkAboutReview Checklist TOWN OF YARMOUTH
SEWAGE PLAN REVIEW CHECKLIST
Location: A.M. Lot Zone of Contribution: In Out Acreage
O ^- ryG f=I L Commercial: esidential: X
Street: (SIA- �1''
Village: Floor Plan: e5 #Bedrooms: S
Owner: Installer: Yq1,c(. --i3Wi- u,LA--
Address: Phone:
Phone: �, ' ,/
Builder: Engineer:_g/i'v�i! '
Address: Phone:
Phone:
N/A YES NO
1.Required#of copies received �//
2. Date of soils exam and percolation test not older than 2 years
3. 4-5 ft of naturally occurring pervious material, above water table ✓
Foundation 2 ft above high point of road H.P.: Fnd: Var.:
ater line 10 ft from septic components Var.: ��(/tit/I x
.. Benchmark indicated and shown-NGVD if near wetlands
7. Septic tank minimum 10 ft from foundation, deck Var.: ✓,.,.
8. Leaching minimum 20 ft full, 15 ft crawl, 10 ft slab Var.: t/
9. Leaching minimum 100 ft from wetlands Var.: /
10. Leaching minimum 150 ft from drinking well/25 ft irrigation well Var.:
11. Tank/leaching minimum 10 ft from property line Var.:
12. System meets all other setback requirements Var.:
13.Uses adjustment for maximum high groundwater Var.:
14. Leaching set 4-5 ft above adj. water or bottom of test hole Var.:
15. System not in top or subsoil(A,B horizons)or 5' removal
16. Proposed contours are suitable ./:,,,
17. System meets slope requirements-min. 1/8", `/"preferred >�
18. System meets breakout requirements PVC liner: Wall:
19. Specified tee sizes are proper, gas baffle on outlet tee
20. Sewage is under 10,000 gpd for parcel
21.No garbage disposal ✓/
22. System adequately sized for its intended use ✓/
23. Minimum 6"stone or compacted below tank and dbox
y24.Manhole covers within 6"of grade,pump chamber cover to grade �
25. Inspection port on plastic chambers/leach field /
26. Electrical permit for pump chamber/Separate meter for duplexes ✓/
27.Pump system-2"line,weep hole,check valve,tee in dbox,pump size
28. Septic tank/pump chamber to be factory waterproofed /
29. Vent provided if leaching below 3 feet,under driveway/parking ✓/
30.Buoyancy calculations for tank/pump chamber 6/
31.Engineer to inspect and certify soils: wall: commercial: Y (7
32.Engineer/Registered Sanitarian and Land Surveyor stamps/signature / �/
33.H-20 loading is subject to vehicular traffic, groundwater �J
34.Title V Application and permit fee, installer signature /
35.Foundation footing min. 2 feet above adjusted ground water for new house ✓�
36. Deed Restriction required max. #bedrooms: max. flow: gpd t./
37. Check area lots for groundwater/Label groundwater�in 1Asssessor's Map
Plan reviewed by: )1 B�� ( 6/03/03