Loading...
HomeMy WebLinkAboutEngineer PlanTOP Of FOUNDATION ELEV: - f22'� � (ASSUMED) r1 20' LENGTH OF SCH. 4 PVC PIPE (AS SLEEVE) 20 FT, MINIMUM FROM FT. MINIMUM 10 CONCRETE COVERS — r 4• CAST IRON PIPE OR CRAWL SPA.,:. M 9 AR 4" SCHEDULE 4: MIN. PITCH 1 !r iPE T. ,'OR EQUAL) MINIMUM ?ITCH 1/4" PER FT. LEVELEWLE RS rTEE �- CLEAN SAND INSPECTION PORT LOAM AND SEED 2' LAYER OF 1/8` TO 1/2" WASHED STONE 77 MAX OR FILTER FABRIC 98.52 MIN. NOT REQUIRED i SOL TEST DATE OF SOIL TEST WIN§0 _%8 1910 " SOIL TEST DONE BY 5WETSER AN N ING WITNESSED BY JAS LAAN LE@._ ---- OBSERVATION HOLE 1 ELEV __98.5 FFRCOI ATION RATE ___<__d__ MIN./INCH AT _ 50___ NCHLS DEPTH HORIZ TEXTURE __ COLOR MOTT, OTHER 0-13" FILL NO 13-19" AO LOAMY SAND IOYR4/1 _ ...� 19-24" B LOAMY SAND 10`�R6/fi EXISTING CONTOUR . - l0 ... 24-126" C MEDIUM LOAM '1.5Y7/4 -_ FLOW LINE 77- NO WATER ENCOUNTERED AT 26 ELEV,= _? M N. ELEV _ _9588_ LEVEL oo° - ° ELEV. _ �7 ym a ° 10• ° ELEV._oi4!._ DESIGN CALCULATIONS a .«_ ELEV. a _$'E�_ GAS ELEV. _ _�44_J 6» �E1LEV. _l. NUMBER OF BEDROOMS 5 ° BAFFLE I]ISTF' TION_ ELEV I Ft TRATORS WITH GARBAGE DISPOSAL UNIT FLOW -i�i— ll — is 4 HIGH CAPACITY N L % TOTAL ESTIMATED STONE IN AN Z ( 110 GAL./WL/DAY X _BTL) Tp BE PLACED ON FIRM BASE) _,}�_ GAL./DAY ( TO BE TESTED T� 11" X 38' X 10" TRENCH FORMATION � µ REQUIRED SEPTIC TANK CAPACITY _ GAL �. GALLON GAL IF MORE I ..E OUTLET /y �.-/—p-.. ,n WELL NIA. ACTUAL SIZE OF SEPTIC TANK ' � LON (TO BE PLA FIRM BASE) Sy�L A®.7Vn�rTl� ZpNE �!'� SOIL CLASSIFICATION DESIGN PERCOLATION RATE •--�-- SEPTIC TANK ) 1 1/2" CLEAN SYSTEM (SAS) INDEX [ Ste_ MIN./IN. � l J I ADJUST EFFLUENT LOADING RATE GAL./DAY/S.f, Ll WASHED STONE LEACHING AREA SQ, FT. FRE OF FINES & SILT i (ttX38)+(47X2X/0/12) USGS PROBABLE A'ATER TABLE ELEV = ------ LEACHING CAPACITY (AREA X PA E1ST AL./DAY i SEWAGE DISPOSAL SYSTEM PRO OBSERVED WATER TABLE ( / / )ELEV. _ ___-_ 47433 X 070 .1l4ltt<_ GAL./DAY NOT TO SCALE BOTTOM 0: TEST HOLE ELEV. = __t1d.Q__ RESERVE LEACHING CAPACIi` LOr 216 16,733.0 _ SF.' z� CC.O 93.2 98 , t9' 99.1 INV -- NOTES: 1: ALL WORKMANSHIP AND MATERIALS SHALL CONFORM TO D.E.P. . TITLE 5 AND THE TOWN'S RULES AND REGULATIONS FOR THE SUBSURFACE DISPOSAL OF SEWAGE. 2 ALL COVERS TO SANITARY UNITS SHALL BE BROUGHT TO � WITHIN 6" OF FINISHED GRADE. 9 3. ALL COMPONENTS OF THE SANITARY SYSTEM SHALL BE CAPABLE OF WITHSTANDING H-10 LOADING UNLESS THEY ARE UNDER OR WITHIN 10 FT, OF DRIVES OR PARKING AREAS. H-20 LOADING SHALL BE REAS®® USED UNDER OR WITHIN 10 FT. OF DRIVES OR PARKING AREAS- 00 j 4. ANY MASONARY UNITS USED TO BRING COVERS TO GRADE SHALL BE MORTARED IN PLACE. j S NO DETERMINATION HAS BEEN MADE AS TO COMPLIANCE WITH DEEDED OR ZONING REGULATIONS OWNER / APPLICANT IS TO OBTAIN SUCH DETERMINATION FROM APPROPRIATE AUTHORITY. 8 6. UTILITIES SHOWN ARE APPROXIMATE ONLY, EXCAVATION CONTRACTOR IS TO CALL "DIG -SAFE" AT 1-888-344-7233 AT LEAST 72 HOURS PRIOR TO COMMENCING WORK ON SITE " 97.9 96, 7 CONTRACTOR IS TO VERIFY GRADES AND ELEVATIONS AS WELL AS 18. SITE CONDITIONS PRIOR TO COMMENCING WORK ON SITE:. ANY VARIATION 1 IS TO BE BROUGHT TO THE ATTENTION OF THE DESIGN ENGINEER IMMEDIATELY. +,6 _• A C,. I ^ .R PAPCE1 iS IN Ft ni'Ifl 7nN` ii_ Ol IS 5,:•sOtht1 UN ASSESSURS MAP `t INTERIOR PIPING 15 TO BE RE )CATER {BY A LICENSED PiUMBERI T( �• EXIT AS AS SHOWN. 3 D' TEST 96.1 FILLED OR REhAOVEU. 11, EXISTING CESSPOOLS ARE TO BE PUMPED AND BACK BOX 96 12, THE INSTALLER IS TO GIVE THE ENGINEER A MINIMUM OF. 48 HOURS r (2 WORKING DAYS) NOTICE FOR THE FINAL INSPECTION (NUMBER BELOW' 1500 GALLON SEPTIC TANK h2 99 o - NV.pR� A Yarmouth Been mp�rta It / z5 °� 'y c- 71 D3I z� 99 FEB 19 2021 i � t ��'� y 99.5 Q�CH �, �,/ Nam9 Date HEALTH l) Gvs APPROVED: BOARD OF HEALTH ,*L�1 97.8 ANG A� 8ED � A•`E AI 99.A I. \ 01.7 f—�. _ —e �___ rVI-9, 2 SOUTH YARMOUTH, MA. ; PROPOSED SEPTIC DESIGN r QR 1:D � KEN SHEYTANL4LN 9.0 98.9 q 7- 9J.6f s�N „OC 80 CURVE V fir ♦ ll�lli:J rk^ All 97SOUTH YARMOUTH, MAS I� ✓` 7 F (zww f � nt n' yr s CiA:.IIC- CAII �.�r�' Tf y1F�Il7 LA1 w'#IM I Rev, 8499.00 OI A i ION MAF L,..._ �. _ l.<e121 r G cJ LEGEND: EXISTING PDT ELEVAT:UN u-,0 EXISTING CONTOUR . - l0 ... FINAL SPOT ELEVATION FINAL CONTOUR— —` SOIL TEST LOCATION �v... UTIUT'Y POLE TOWN WATER W+`°•"W CATCH BASIN M ; GAS UNE C C/��.M��AANNpqOryUT 9J.6f s�N „OC 80 CURVE V fir ♦ ll�lli:J rk^ All 97SOUTH YARMOUTH, MAS I� ✓` 7 F (zww f � nt n' yr s CiA:.IIC- CAII �.�r�' Tf y1F�Il7 LA1 w'#IM I Rev, 8499.00 OI A i ION MAF L,..._ �. _ l.<e121