HomeMy WebLinkAboutReview Checklist TOWN OF YARMOUTH
SEWAGE PLAN REVIEW CHECKLIST
} Location: A.M. 69 Lot 3e...) Zone of Contribution: Ink Out_ Acreage /5-G7 9 a--
Commercial:
Commercial: Residential: X
Street: q t it-s-5 7) -4
Village: at i r>& 4,1.r,,...c Floor Plan: ✓ #Bedrooms: 3
Owner: 1.4i /1-5 'r' Installer: GZ u r N u
Address: Phone:
Phone:
Builder: Engineer: P(C
Address: Phone:
Phone:
N/A YES NO
1. Required#of copies received ✓
2. Date of soils exam and percolation test not older than 2 years v/
3. 4-5 ft of naturally occurring pervious material, above water table ✓
4. Foundation 2 ft above high point of road H.P.: Fnd: Var.: ✓
5. Water line 10 ft from septic components Var.: t/
6. Benchmark indicated and shown-NGVD if near wetlands ✓
7. Septic tank minimum 10 ft from foundation, deck Var.: �r r ST ✓
8. Leaching minimum 20 ft full, 15 ft crawl, 10 ft slab Var.:
9. Leaching minimum 100 ft from wetlands Var.: ✓
10. Leaching minimum 150 ft from drinking well/25 ft irrigation well Var.:
11. Tank/leaching minimum 10 ft from property line Var.:
12. System meets all other setback requirements Var.:
13. Uses adjustment for maximum high groundwater Var.:
14. Leaching set 4-5 ft above adj. water or bottom of test hole Var.:
15. System not in top or subsoil (A,B horizons) or 5' removal f
16. Proposed contours are suitable V'
17. System meets slope requirements-min. 1/8", '/"preferred
18. System meets breakout requirements PVC liner: Wall:
19. Specified tee sizes are proper, gas baffle on outlet tee V/
20. Sewage is under 10,000 gpd for parcel
21.No garbage disposal ,✓
22. System adequately sized for its intended use
23. Minimum 6"stone or compacted below tank and dbox ✓
24. Manhole covers within 6" of grade,pump chamber cover to grade
25. Inspection port on plastic chambers/leach field 1/
26. Electrical permit for pump chamber/Separate meter for duplexes ✓
27. Pump system-2"line,weep hole,check valve,tee in dbox,pump size
28. Septic tank/pump chamber to be factory waterproofed ,/
29. Vent provided if leaching below 3 feet,under driveway/parking
30.Buoyancy calculations for tank/pump chamber V
31. Engineer to inspect and certify soils: wall: commercial: ✓
32. Engineer/Registered Sanitarian and Land Surveyor stamps/signature
33. H-20 loading is subject to vehicular traffic, groundwater ✓
34. Title V Application and permit fee, installer signature
35. Foundation footing min. 2 feet above adjusted ground water for new house ✓
36. Deed Restriction required max. #bedrooms: max. flow: gpd t/ /
37. Check area lots for groundwater/Label groundwater in Assessor's Map ✓
Plan reviewed by: c.57---6622i- -,i0 /41,4verS 6 03 03