Loading...
HomeMy WebLinkAboutReview Checklist TOWN OF YARMOUTH SEWAGE PLAN REVIEW CHECKLIST } Location: A.M. 69 Lot 3e...) Zone of Contribution: Ink Out_ Acreage /5-G7 9 a-- Commercial: Commercial: Residential: X Street: q t it-s-5 7) -4 Village: at i r>& 4,1.r,,...c Floor Plan: ✓ #Bedrooms: 3 Owner: 1.4i /1-5 'r' Installer: GZ u r N u Address: Phone: Phone: Builder: Engineer: P(C Address: Phone: Phone: N/A YES NO 1. Required#of copies received ✓ 2. Date of soils exam and percolation test not older than 2 years v/ 3. 4-5 ft of naturally occurring pervious material, above water table ✓ 4. Foundation 2 ft above high point of road H.P.: Fnd: Var.: ✓ 5. Water line 10 ft from septic components Var.: t/ 6. Benchmark indicated and shown-NGVD if near wetlands ✓ 7. Septic tank minimum 10 ft from foundation, deck Var.: �r r ST ✓ 8. Leaching minimum 20 ft full, 15 ft crawl, 10 ft slab Var.: 9. Leaching minimum 100 ft from wetlands Var.: ✓ 10. Leaching minimum 150 ft from drinking well/25 ft irrigation well Var.: 11. Tank/leaching minimum 10 ft from property line Var.: 12. System meets all other setback requirements Var.: 13. Uses adjustment for maximum high groundwater Var.: 14. Leaching set 4-5 ft above adj. water or bottom of test hole Var.: 15. System not in top or subsoil (A,B horizons) or 5' removal f 16. Proposed contours are suitable V' 17. System meets slope requirements-min. 1/8", '/"preferred 18. System meets breakout requirements PVC liner: Wall: 19. Specified tee sizes are proper, gas baffle on outlet tee V/ 20. Sewage is under 10,000 gpd for parcel 21.No garbage disposal ,✓ 22. System adequately sized for its intended use 23. Minimum 6"stone or compacted below tank and dbox ✓ 24. Manhole covers within 6" of grade,pump chamber cover to grade 25. Inspection port on plastic chambers/leach field 1/ 26. Electrical permit for pump chamber/Separate meter for duplexes ✓ 27. Pump system-2"line,weep hole,check valve,tee in dbox,pump size 28. Septic tank/pump chamber to be factory waterproofed ,/ 29. Vent provided if leaching below 3 feet,under driveway/parking 30.Buoyancy calculations for tank/pump chamber V 31. Engineer to inspect and certify soils: wall: commercial: ✓ 32. Engineer/Registered Sanitarian and Land Surveyor stamps/signature 33. H-20 loading is subject to vehicular traffic, groundwater ✓ 34. Title V Application and permit fee, installer signature 35. Foundation footing min. 2 feet above adjusted ground water for new house ✓ 36. Deed Restriction required max. #bedrooms: max. flow: gpd t/ / 37. Check area lots for groundwater/Label groundwater in Assessor's Map ✓ Plan reviewed by: c.57---6622i- -,i0 /41,4verS 6 03 03