Loading...
HomeMy WebLinkAboutFoundation Plan-R4-STAMPED final rev 12.16.2021\ \ � � GENERAL NOTES: 0�I 1. CODES: MASSACHUSETTS STATE BUILDING CODE, NINTH EDITION (780 CMR) 7 / I 2. DESIGN LOADS: DEAD LIVE 10 psf 40 psf FIRST FLOOR \ 10 psf 30 psf BEDROOMS 10 psf 40 psf EXTERIOR DECKS ' 30'4" 6' 28'-4" \ 10 psf 20 psf ATTIC 10 psf 30 psf ROOF (GROUND SNOW) -- -- -- - 3. DO NOT SCALE FROM PLANS. IF DIMENSION IS NOT GIVEN, REFERENCE ARCHITECTURAL FLOOR PLANS PRIOR TO - - - - - V CONTACTING ENGINEER. B /FTG. B /FTG. - _ - - - - - - - - _ =7.25' 4. CONTRACTOR TO VERIFY ALL DIMENSIONS AND SITE CONDITIONS PRIOR TO CONSTRUCTION AND SHALL NOTIFY B / FTG. -B%FTG. B / FTG. B / F G. � THE ENGINEER IMMEDIATELY OF ANY DISCREPANCIES BETWEEN DOCUMENTS AND FIELD CONDITIONS. L.-16.50' EL.-15.25 E .=13.2 EL. 1.25' \ �r�j- /- � y\/ I V 7 71 SLOPED BOTTOM OF FOOTING n 7 7 �7 L7 _Z 1J (SEE DETAIL 6/ST3) / / / / / / / / / / / / u \ � K \/ u� I 5. THE CONTRACTOR IS RESPONSIBLE FOR ALL MEANS AND METHODS DURING CONSTRUCTION. THE ENGINEER IS SPECIFYING THE FINISHED CONDITION ONLY, WITHOUT ASSUMING NEITHER KNOWLEDGE NOR RESPONSIBILITY 7 7 X SLOPED BOTTOM OF FOOTING. AS REQUIRED FOR 4' FROST FOR HOW THE CONTRACTORS WILL ACHIEVE THIS RESULT. ° D / ° D COVER ALONG EAST WALL (SEE DETAIL 6/ST3) 6. DIMENSIONS FOR THE EXCAVATION PIT ARE BASED OFF THE RECOMMENDATIONS BY THE LICENCED SITE EP B TTO OFF TIN PROFESSIONAL (LSP). THIS OFFICE DOES NOT DELINEATE THE EXTENT OF THE CONTAMINATION. THIS OFFICE IS / G / � � ° z � / / p ° �)M p i� ° TO BE NOTIFIED IMMEDIATELY IF EXCAVATION BEYOND WHAT IS SHOWN ON THIS PLAN IS REQUIRED. c,z M (SE DETA 6/ST) O - � �� / o O°. / p / D +I a i- p FOUNDATION NOTES: / w O / ° ° o o ° ° ° D "'M ° \ 1. THE STRUCTURE IS TO BEAR ON NATURAL UNDISTURBED SOILS CAPABLE OF SUPPORTING 1.5 TONS PER SQUARE j)fq � ° FOOT, WITH A V LAYER OF CRUSHED STONE, OR FLOWABLE FILL. IF QUESTIONABLE BEARING IS ENCOUNTERED IT w �� D D IS TO BE REMOVED AND REPLACED WITH ADDITIONAL FLOWABLE FILL. CDD p ° o D D �I � D ° 2. ALL EXTERIOR FOOTINGS TO HAVE A MINIMUM OF 4' OF FROST COVER. / p -� ° F- � / ° 43'-101" ° ° D 8'- 3" \ ° 3. 5/8" ANCHOR BOLTS ARE TO BE INSTALLED AT 4' ON CENTER AND HAVE A MINIMUM EMBEDMENT DEPTH OF 12" J / 12" 0 SONOTUBE ° D 4D ° D ° D I D I UNLESS NOTED OTHERWISE. ADDITIONALLY ANCHOR BOLTS TO BE INSTALLED W/IN 12" OF ALL JOINTS AND m w / (SEE PLAN B/ST2) ° ° D ° ° ° ° CORNERS. / 36"x36" PAD FOOTING O. Dp � 00 N i� ° D 4. ANCHOR BOLTS AND ALL REINFORCING IS TO BE POSITIONED AND SECURED IN PLACE PRIOR TO POURING p / (SEE DETAIL 3/ST3) g D � ° ° D CONCRETE. NO WET STICKING IS ALLOWED. / B /FTG. p � o D D ° £1S EL.=16.5 ° ° D APPROXIMATE LIMIT 5. WHERE ANCHOR RODS ARE EPDXIED TO CONCRETE, USE HILTI "HIT-HY 200" EPDXY, AND INSTALL ANCHORS PER / o ° p 36"x36" PAD FOOTING D 3'-0" STRIP FOOTING MANUFACTURES SPECIFICATIONS. ADHESIVE ANCHORS SHALL ONLY BE INSTALLED IN CONCRETE WITH A 6'-2" BEARING ON FLOWABLE (SEE DETAIL 1/S 3 ch OF EST BOTTABLEOM FILL AT � ) ° p LOWEST BOTTOM OF MINIMUM AGE OF 21 DAYS AT THE TIME OF ANCHOR INSTALLATION. FILL (SEE DETAIL 8/ST3) Q � o D o FOOTING ELEVATION p 6. CONTRACTOR TO INSTALL FOUNDATION DRAINAGE PER IBC, SECTION 1805. �D w D. ° p 7. NO BACKFILLING AGAINST THE FOUNDATION IS TO BE DONE UNTIL AFTER THE HOUSE IS CONNECTED TO THE ° p c,� ° .I co ° D o o FOUNDATION. ° D12'-8" CONCRETE NOTES: N B/ FTG. N H ° I D p ° D_ D D p � p °� I EL.=11.25' ° ° ° ° b 1. ALL CONCRETE WORK SHALL CONFORM TO THE APPLICABLE VERSION OF BUILDING CODE REQUIREMENTS FOR REINFORCED CONCRETE (ACI 318) AND SPECIFICATIONS FOR STRUCTURAL CONCRETE FOR BUILDINGS (ACI 301) D ° D REFERENCED BY THE BASE CODE MENTIONED ABOVE. 2. CONCRETE SHALL BE PROPORTIONED, MIXED AND PLACED IN CONFORMANCE WITH ACI 318 TO THE FOLLOWING REQUIREMENTS; / / / / D o ° ° ° * 3/4" MAXIMUM AGGREGATE SIZE \ B / FTG. B / TG. B FTG. / F p cn ° o p * FTG.: 3,000 PSI MIN. 28 DAY COMPRESSIVE STRENGTH W/ 4" MAX. SLUMP. \ EL.=16.50' EL.=1 .25' EL. 13.25' E .=11.25' �STEP BOTTOM OF? FOOT NG DD w ' D ° p D D ° ° D 10'-2" * FND.: 3,000 PSI MIN. 28 DAY COMPRESSIVE STRENGTH W/ 4-1/2" MAX. SLUMP. ST P B TTO OFF OTING T EDGEIF FLQM/ABL FILL ° ° D D m SLAB: 4,000 PSI MIN. 28 DAY COMPRESSIVE STRENGTH W/ 3" MAX. SLUMP. \ (SEE ETAI 6/ST) ° p I ° D ° p ° D 9'-8" ° ° 4. CONCRETE SHALL BE AIR ENTRAINED. TOTAL AIR CONTENT (PERCENT BY VOLUME OF CONCRETE) SHALL NOT BE LESS THAN 5% OR MORE THAN 7%. CO \ \ o �� °�° l� ° \ 5. FLOWABLE FILL SHALL BE PROPORTIONED, MIXED AND PLACED IN CONFORMANCE WITH ACI 318 TO THE FOLLOWING REQUIREMENTS; * MINIMUM STRENGTH = 100 PSI AT 28 DAYS * MAXIMUM STRENGTH = 150 PSI AT 28 DAYS o \ I °6' �7� \ * MINIMUM WATER CONDUCTIVITY = 4.Ox10^-3 cm/sec ° II I II II I o. \ o ° D p --- D o D ° ADD �� ° 1 I 6. FLOWABLE FILL SHALL BE A LOW FLY ASH MIX THAT IS AIR ENTRAINED. TOTAL AIR CONTENT (PERCENT BY VOLUME OF o. D \ ° ° -� K > N CONCRETE) SHALL NOT BE LESS THAN 15% OR MORE THAN 30%. 3'-0" STRIP FOOTINGS (SEE DETAIL-1/ST3) D p \ \ % / I� u 5. STEEL REINFORCING BARS SHALL CONFORM TO ASTM A615, GRADE 60. WELDED WIRE FABRIC SHALL CONFORM TO ° ASTM A1064 GRADE 60, FOR DEFORMED AND PLAIN WIRE. CID 6. MINIMUM CONCRETE COVER OVER STEEL REINFORCING TO BE ACCORDING TO ACI CODE \ A PRO MAT LIMIT \ o p Do -°�° D \ * 3" IF CONCRETE IS POURED IN DIRECT CONTACT WITH THE GROUND. \ OF OWA LE FIL ° D £1S -°� _ \ * 2" IF CONCRETE IS EXPOSED TO THE EARTH OR WEATHER. AT p \ LOW ST B TTOM F ° D-� f4 o * 1-1/2" IF CONCRETE IS NOT EXPOSED TO THE EARTH OR WEATHER. p p ° D- 3'-0" STRIP \ i� \ FOOT GEL VATI \ D ° ° DETAIL 1/ST3) 7. ALL SPLICES IN THE REINFORCING STEEL ARE TO BE TIED WITH WIRE, AND LAPPED AS FOLLOWS; �� \ * #6 BARS AND SMALLER, LAP 35 BAR DIAMETERS. _- --- --- \ --- -- / \ \ * #7 BARS AND LARGER, LAP 45 BAR DIAMETERS. \ � �`! \ \ 8. AT NO TIME IS THE REINFORCING STEEL TO BE WELDED. \ - � \ X �x � w \ \ 9. WHERE REINFORCING STEEL IS BENT IT IS TO BE DONE SO THE END RESULT IS A GRADUAL ARC WITH A MINIMUM OF A co ----- -- - -- �X� _ � � \ THREE INCH RADIUS. I --- \ 7. FORMS SHALL NOT BE REMOVED UNTIL THE FOLLING HAVE BEEN ATTAINED; � \ I \ \ * BEAMS & SLABS - 500 DEGREE-DAYS HAVE PASSED OR CONCRETE HAS REACHED 30% OF THE REQUIRED STRENGTH. \ \ \ * WALLS & VERTICAL SURFACES - 200 DEGREE-DAYS HAVE PASSED OR CONCRETE HAS REACHED 30% OF THE REQUIRED STRENGTH. "DEGREE-DAY" = (TOTAL NUMBER OF DAYS)x(AVERAGE DAILY TEMPERATURE) _ ------ \ TEMPERATURES BELOW 50 DEGREES ARE NOT TO CONTRIBUTE TO DEGREE-DAYS / \ \ 8. SLAB ON GRADE TO BE 4" THICK WITH ONE (1) LAYER OF 6x6 W4.OxW4.0 WELDED WIRE FABRIC LOCATED IN THE UPPER THIRD OF THE SLAB. / \ \ \ I n 9. TOLERANCE FOR FLATNESS OF THE SLAB IS NOT TO EXCEED 1/4" DIFFERENCE ACROSS 8', & 1/2" DIFFERENCE ACROSS I� J THE ENTIRE SLAB, UNLESS NOTED OTHERWISE. 10. DETAILS NOT SHOWN ON DRAWINGS SHALL BE IN ACCORDANCE WITH THE ACI DETAILING MANUAL 315 / \ I 11. CONSTRUCTION OR CONTROL JOINTS IN THE SLAB TO BE AS SHOWN ON PLANS. WHERE NOT SHOWN, LIMIT CONTROL / A EXCAVATION / FOOTING PLAN 1 I JOINT SPACING TO NO GREATER THAN 15 FEET ON ANY SIDE FOR 5 INCH SLABS AND 12 FEET FOR 4 INCH SLABS ON / SCALE: 1/4" = V-0" \ I 0 GRADE. THE SECTIONS BOUNDED BY CONTROL OR CONSTRUCTION JOINTS SHALL BE APPROXIMATELY SQUARE, / \ I WITH THE LENGTH TO WIDTH RATIO LESS THAN 1.5. / I \ 12. CONTROL JOINTS ARE TO BE 1/4 OF THE TOTAL SLAB DEPTH AND ARE TO BE CUT USING A DRY SAW WITHIN 1 HOUR AFTER FINISHING IN HOT WEATHER AND WITHIN 4 HOURS AFTER FINISHING IN COLD WEATHER / I � / 13. CONTROL JOINTS ARE TO BE FILLED WITH A SEMIRIGID EPDXY. CONTRACTOR IS TO DELAY FILLING THE JOINTS TO THE MAXIMUM EXTENT POSSIBLE. 14. CONTRACTOR TO AVOID INTERSECTING FULL DEPTH CONSTRUCTION JOINTS WITH PARTIAL DEPTH CONTROL JOINTS. 15. CONTRACTOR TO DESIGN, ERECT, SUPPORT, BRACE, AND MAINTAIN FORMWORK TO SUPPORT VERTICAL AND LATERAL LOADS TO CONFORM WITH THE APPLICABLE EDITION OF GUIDE TO FORMWORK FOR CONCRETE (ACI 347) REFERENCED BY THE BASE CODE MENTIONED ABOVE. 16. CONTRACTOR TO PLACE CONCRETE IN COMPLIANCE WITH THE MOST CURRENT EDITION OF GUIDE FOR MEASURING, MIXING, TRANSPORTING, AND PLACING CONCRETE (ACI 304) REFERENCED BY THE BASE CODE MENTIONED ABOVE. 17. CONTRACTOR TO PROTECT CONCRETE WORK FROM PHYSICAL DAMAGE OR REDUCED STRENGTH WHICH COULD BE CAUSED BY BOTH EXCESSIVE HEAT IN COMPLIANCE WITH THE APPLICABLE EDITION OF HOT WEATHER CONCRETING (ACI 305), AS WELL AS FROST, FREEZING ACTIONS, OR LOW TEMPERATURES, IN COMPLIANCE WITH THE APPLICABLE EDITION OF COLD WEATHER CONCRETING (ACI 306) REFERENCED BY THE BASE CODE MENTIONED ABOVE. 18. PRESSURE TREATED LUMBER IS TO BE USED WHEN IN CONTACT WITH CONCRETE. V, Q Q • Q E U w � O Q Q 04 V�JMCM CO W � X Cn U) w Q =U"� SEAL - Digitally signed Scott b Scott Orlowski O I ki Date: 2022.05.27 r ows 13:40:50-04'00REWWOms- NO CHANGES TO THIS SHEET 05/27/2022 NO CHANGES TO THIS SHEET 04/21/2022 ISSUED FOR CONSTRUCTION 12/16/2021 1 ADDED ROUGH CONTOURS FOR EXCAVATION 11130/2021 p� ISSUED FOR PERMITTING 11/29/2021 MWED FOR - CONSTRUCTION BAYS. DEC. 16, 2021 SCALE. AS NOTED DRAW Y- SRO DEMGHED Y- SRO I..L LLI O LL z W Q OU 0- 0 = C) ~ ~O z `Uu� ��i'� Z) `J w Oz _>- I- - Q = 3:U) U=j W %< Q O � z W cal cn DRWHO VffLE: PLAN & NOTES DRGIMNO NUMBER. ST1 PAGE NUMBER: 1 OF 3 JOB NUMBER: 20-061 b F F L- L 1'-9"± 12'-3"± - 28'-0"± 3'-6" DOOR 12'-3"± OPENING r T / FTG. T / FTG. T / FTG. EL.=16.25' EL.=14.25' EL.=12.25' m J Lf) Q r� >� r� 6n C > N _ 11 Z J M DEP JO� �� w w O � z F —112", #5 BAR AT 24" O.C. E T. a z 0 Q EPDXY INTO EXISTING w o w FOUNDATION 4" co W zo L ocw 0w M 00 12" O SONOTUBE ON A T/SONOTUBE 36"x36" PAD FOOTING EL.=19.83' (TYP.) (SEE DETAIL 3/ST3) E1S O O H H Q0 Q0 vjw vjtv w U a U a �E0 -� ~EO JCO mU) Om-) JO mLn Q N Q O N Q Q O N fn > 1. 11. CON > N � 11. >� J J I I.>� J J T / FTG. T / FTG-�T T / FTG. T / FTG. EL.=17.50' EL.=16.25' EL.=14.25' EL.=12.: 9'-6" GARAGE 9'-6" GARAGE DOOR OPENING DOOR OPENING J -6" J 28'-0"± j J J C° L j N >� w 32" F- 9'-42"+ 7'-0"± 00 N N BASEMENT WINDOW PER ARCH. (SEE DETAIL 7/ST3) 26'-0"± 12'-0"± 7'-0" STEP IN FND. WALL (SEE DETAIL 7/ST3) TT BEAM POCKET w Q Q LO (SEE DETAIL 4/ST3) 20 3: N 3: - 11- u 00 ~w ~w w -J T / WALL F- z EL.=13.50' I +I U) o m 2x6 FRAMED WALL O N } ABOVE FOUNDATION. _D SEE ARCH. PLANS CD 20'-4' + L I T 3-1/2" O.D. SCH. 40 STEEL COLUMN (SEE DETAIL 8/ST3) L J BEAM POCKET L APPROXIMATE (SEE DETAIL 4/ST3) LAYOUT OF STAIRS 3'-10"± 36"x36" PAD FOOTING (SEE ARCHITECTURAL PLANS) JI (SEE DETAIL 8/ST3) w Ji w £ZS CONTRACTOR TO VERIFY w °J° Iw PLATE ELEVATIONS BETWEEN '- J MUDROOM AND GARAGE N Q w (D 2x6 FRAMED WALL X m U) w T /SLAB ~ z � ABOVE FOUNDATION. AND ADD A FOUNDATION O EL.=12.75' CD SEE ARCH. PLANS SHELF HERE AS REQUIRED. Cl) m 12'-8" < 3'-0" STRIP FOOTING Iv (SEE PLAN A/ST1) T / WALL BEAM POCKET EL.=21.75' (SEE DETAIL 4/ST3) 8" FOUNDATION WALL — (SEE DETAIL 1/ST3) O I I 1 +I ST3 w T / WALL 12", #5 BAR AT 24" O.C. V RT. EL.=13.50' EPDXY INTO EXISTING 10'-10"± FOUNDATION 4" 12'-42"+ I I � BEAM POCKET T / WALL (SEE DETAIL 4/ST3) EL.=21.75'I I I I I I I I o N w TOP 16" OF FND w WALL ARE TO BE w - CMU BLOCK m w SEE DETAIL 9/ST3 w Iz ElS CDw ST3 om T / WALLI - EL.=21.75'I I BEAM POCKET w I T / WALLI - (SEE DETAIL 4/ST3) EL.=21.751 ------------- 20'-6"± 6-74" 6'-10" 6-10" 10" O SONOTUBE ON 28" 0 BIGFOOT FOOTING (TYP.) 23,, 4 B FOUNDATION PLAN SCALE: 1/4" = V-0" 4'-94" 3'-24" -I00 rn zo -O O 100 BEAM POCKET (SEE DETAIL 4/ST3) J O 2'-6"± T o I I I � BSMT. WINDOW 77 O REQUIRED / +I (SEE DETAIL 7/ST3) I o -100 zo BSMT. WINDOW PER ARCHITECT (SEE DETAIL 7/ST3) 'O +I—/ o � I00 I J —IN 10'-6" 10" O SONOTUBE ON THE STRIP FOOTING SIMILAR TO DETAIL 3/ST3 STRUCTURAL STEEL NOTES: 1. STRUCTURAL STEEL SHAPES AND PLATES SHALL CONFORM TO THE APPLICABLE VERSION OF THE FOLLOWING ASTM PROVISIONS * WIDE FLANGE BEAMS "W" SECTIONS - ASTM A992 (Fy=50 KSI) * WIDE FLANGE BEAMS "M" & "S" SECTIONS - ASTM A36, Fy=36 KSI) * WIDE FLANGE BEAMS "HP" SECTIONS - ASTM A572, GRADE 50 (Fy=50 KSI) * HOLLOW STRUCTURAL SECTIONS "RECTANGULAR" - ASTM A500, GRADE C (Fy=50 KSI) * HOLLOW STRUCTURAL SECTIONS "ROUND" - ASTM A500, GRADE C (Fy=46 KSI) * PIPE SECTIONS - ASTM A53, GRADE B (Fy=35 KSI) * CHANNELS, ANGLES, AND OTHER SHAPES - ASTM A36 (Fy=36 KSI) * STUDS, PURLINS, AND OTHER FRAMING MEMBERS - ASTM A1003 (Fy=50 KSI) 2. STEEL SECTIONS ARE NOT TO BE NOTCHED, CUT, ALTERED OR HAVE ANY PORTION OF IT MISSING WITHOUT THE WRITTEN APPROVAL OF THE ENGINEER. 3. PROVIDE ASTM F3125 BOLTS FOR ALL FRAMING CONNECTIONS. F1554 BOLTS MAY BE USED FOR COLUMN ANCHOR BOLTS ONLY. EXPANSION BOLTS SHALL BE "HILTI KWIK BOLTS" OR APPROVED EQUAL. 4. ALL WELDING SHALL CONFORM TO THE APPLICABLE EDITION AWS D1.1 "STRUCTURAL WELDING CODE" WITH E70XX ELECTRODES BY THE SHIELDED METAL ARC PROCESS. ALL WELDING SHALL BE PERFORMED BY A WELDER CURRENTLY CERTIFIED BY THE AMERICAN WELDING SOCIETY. 5. NO TACK WELDS, PLUG WELDS, OR SLOT WELDS PERMITTED UNLESS NOTED OTHERWISE. 6. THE APPROVAL OF SHOP DRAWINGS WILL BE FOR SIZE AND ARRANGEMENT OF PRINCIPAL AND AUXILIARY MEMBERS AND STRENGTH OF CONNECTIONS. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL DIMENSIONS SHOWN ON THE SHOP DRAWINGS. 7. ALL NEW STEEL TO RECEIVE ONE (1) COAT OF SHOP PRIMER. ALL WELDED OR ABRADED AREAS SHALL BE TOUCHED UP IN THE FIELD WITH RED OXIDE STRUCTURAL STEEL PRIMER AND ZINC RICH PAINT IN ACCORDANCE WITH MANUFACTURER'S INSTRUCTIONS. USE PAINTING METHODS WHICH WILL RESULT IN FULL COVERAGE OF JOINTS. V, Q Q • Q U (� \ w C:)O �.I Q Q V�JMCM COX W � Cn co� a) U)LLJC q I SEAL - Digitally Digitally signed b Scott Scott Orlowski Orlowski Date: 2022.05.27 13:40:08-04'00' REMUS- 4 GARAGE FOUNDATION LAYOUT & TOP OF WALL ELEVATIONS 05/27/2022 3 MODIFIED STEEL BEAM AND TOP OF BASEMENT WALL 04/21/2022 ISSUED FOR CONSTRUCTION 12/16/2021 1 ADDED ROUGH CONTOURS FOR EXCAVATION 11/30/2021 ISSUED FOR PERMITTING 11/29/2021 RISM FOR - CONSTRUCTION RATE. DEC. 16, 2021 SCALE. AS NOTED DINAME BY- SRO DEN&HED Q'fo SRO lO LL � � Z L LJ Q OU 0- 0 = C) ~ ~O Z Uu� �i'� Z) `J w OZ _>- — Q 1:3:U) U=j w X Quo Z Lu c*14 cn DG;iQMMU MLE: PLAN & NOTES DG31�'J ma HLJ(IUIQF3; ST2 PAGE HUMBErk 2 OF 3 JOB HUMBER: 20-061 b EXISTING FRAMING NOT SHOWN FOR CLARITY \ EXISTING 2x8 SILL NEW (2) 2x8 SILL PLATES 6" TIMBERLOK SCREWS @ 12" O.C. STAGGERED IN AND OUTSIDE (2) #5 REBAR TOP & BOTTOM — ANCHOR ROD (SEE NOTES) — PROPOSED CONCRETE WALL — SEE PLAN A/ST1 FOR WIDTH FOUNDATION WALL REINFORCING (SEE SCHEDULE) ASPHALT EXPANSION JOINT 2x4 KEYWAY - DRILL OUT EXISTING SILL TO ALLOW NUT. DO NOT COUNTER SINK ANCHOR BOLT INTO THE NEW SILL PLATES. • 8" MIN. II \DO NOT BACKFILL THE FOUNDATION UNTIL THE SLAB IS /\ \ CURED AND HOUSE IS ATTACHED. 4 4' (MINIMUM) FROST COVER TO BOTTOM OF FOOTING OR FLOWABLE FILL 8" WALL REINFORCING SCHEDULE H U REINFORCING Q 9' <7' NONE REQUIRED - 9' <9' #5 BAR @ 24" O.C. 10' <7' NONE REQUIRED 10' <9' #5 BAR @ 16" O.C. a 10' 10' * #5 BAR @ 12" O.C. * USE THIS REINFORCING FOR THE GARAGE / MUDROOM & \ STAIR WALL. a \/\\� \/ \ (3) #5 REBAR TOP, ONLY • • \\\\\\\ REQUIRED WHERE "H"<4'-0". \ \ \ ALSO SEE DETAIL 2/ST3 ° a \\ STRIP FOOTING ° a �\ FLOWABLE FILL a \\\\\\\\\ SEE NOTES /\/� SEE PLAN \ \\\ \\\\\\\\ \\ FOOTING TO BEAR ON FLOWABLE \\ D D FILL OR UNDISTURBED SOIL (3) #5 REBAR BOTTOM OF FOOTING 1 FOUNDATION WALL DETAIL ST1 SCALE: N.T.S. REMOVE FLOWABLE FILL AT A 1:1 SLOPE TO PERMIT STRIP FOOTING PITCH SLAB 1/8" PER FOOT PROP. SLAB (SEE NOTES) FINAL GRADE ° f-----�--- U 6"± BELOW T.O.S. z \i/\\/\\/ p � • \ (2) #5 REBAR TOP & BOTTOM Q #4 DOWELS @ 24" O.C. 24 FIELD BEND DOWELS \ FND. WALL SEE 7 AFTER WALL IS CURED 24 PLAN B/ST2 �D° SEE DETAIL 1/ST3 FOR ADDITIONAL WALL REINFORCING SEE PLAN 2 GARAGE SLAB DETAIL ST1 SCALE: N.T.S. ° 1D ° D PREVIOUSLY PLACED p ° p 35d TYPICAL p / ° ° / FLOWABLE FILL BEYOND D ° p FOOTING TO REMAIN °p D — —p— — — — ° r — — ° Q 4 ° O O \\\\ ° / a �. /\\\ / ° PREVIOUSLY PLACED a ° ° ILL \/�\ ° p p Dp ° FLOWABLE FILL a ° / a UNDER FOOTING g REINFORCING TO a a a. op ° D / p a TO REMAIN °tea z MATCH HORIZONTAL WALL FOOTING °� a a ° a p Q as 4 o ° g a a D ° ° 5 BEARING TRANSITION DETAIL UNDISTURBED SOIL 1D MIN. SCALE: N.T.S. � p OPENING IN WALL p p \ p o AS REQUIRED o p (] D \\ D �----- ° p \ n c p p p ° ° V D v p D / \ 2'-0" 2 ° p D p ° / ,� ° 0 ° p p D FOUNDATION OPENING REINFORCEMENT DETAIL SCALE: 1" = V-0" (2) #5 BARS ABOVE OPENING 2x4 KEYWAY (3) #5 REBAR TOP, AT ALL GARAGE DOORS (3) #5 REBAR BOTTOM Q 0 N ° ° 3-1/2" LALLY COLUMN TO BEAR ON HAUNCHED SLAB TOP OF SLAB ELEV=VARIES BOTT. OF FTG. ELEV=16.50' ° D pD p ° ° ° p D p ° ° D. p ° p ° p ° D p p 11 1 D MIN. MULTIPLE 2x8 TOP NAILERS (AS RECUIRED) ATTACHED W/ HEADLOK SCREWS @ 16" O.C. (STAGGERED) THAT EXTEND INTO JOISTS 2" MIN. 5"x10"x3/4" or 6"x10"x3/4" STEEL TOP PLATE 3-1/2" O.D. SCHEDULE 40 STEEL COLUMN 5"x10"x3/4" STEEL BASE PLATE W/ (2) 1/2" 0 EXP. BOLTS TO SLAB 4" CONCRETE SLAB (SEE NOTES) \ PROPOSED STEEL BEAM * SEE PLAN B/ST2 J , 4" CONCRETE SLAB (SEE NOTES) (3) #5 REBAR BOTTOM OF FOOTING EACH WAY 3 PAD FOOTING DETAIL GARAGE ST1 SCALE: N.T.S. EXISTING FRAMING NOT SHOWN FOR CLARITY EXISTING 2x8 SILL NEW (2) 2x8 SILL PLATES NOTCHED TO PERMIT BEAM • D 4" ° D FND. WALL SEE PLAN B/ST2 p ° PROPOSED STEEL BEAM �� SEE PLAN A/ST1 3-1/2"x7"x1/2" STEEL BEARING PLATE ON A BED OF GROUT 4', #5 REBAR AT TOP OF STEM & BELOW POCKET CENTERED ON BEAM. NOT REQUIRED FOR BEAM POCKETS AT THE END OF A WALL. SEE DETAIL 1/ST3 FOR ADDITIONAL WALL REINFORCING 4 BEAM POCKET DETAIL ST2 SCALE: 1" = 1'-0" p p p v 35d TYPICAL ° 1> / / 4'-0" MINIMUM D p o p° / p p ° BOTTOM OF STRIP FOOTING p j// p 2 1 (WALL ABOVE NOT SHOWN FOR CLARITY) / ° ° Q � 1 D MIN. d=BAR DIAMETER ° ° p / p 2D MINIMUM D=DEPTH OF FOOTING D / 2 REINFORCING TO MATCH HORIZONTAL WALL FOOTING 6 FOOTING STEP DETAIL ST1 SCALE: N.T.S. JOISTS ABOVE NOT SHOWN FOR CLARITY HEADLOK SCREW W/ OVERSIZED WASHER @ 16" O.C. ALTERNATE SIDES OF THE BEAM. INSTALL SCREWS IN A MANNER TO HOOK THE TOP FLANGE OF THE STEEL BEAM. 2" MINIMUM THREAD EMBEDMENT INTO EXISTING JOIST PROPOSED STEEL BEAM * .. * PROPOSED W10x30 STEEL BEAM MAY BE ONE CONTINUOUS PIECE APROXIMATELY 48' LONG LV-1 FRAMING ABOVE NOT SECTION SHOWN FOR CLARITY SEE DETAIL 1/ST3 FOR SILL INFO D� D ° D ° (2) #5 BARS a aEACH DIAGONAL BARS MINI UCLEAN CORNER2" SAND ORCRUSHED STONE.(2) #5 BARS PLAN PUNDER y OPENINGSEE DFOOTING TO BEAR ON FLOWABLE5 REBAR FILL OR UNDISTURBED SOILTOM OF TING EACH WAY 8 PAD FOOTING DETAIL BASEMENT ST1 SCALE: N.T.S. FND. WALL PLAN B/ST SEE DETAIL 1/S FOR ADDITIONAL WP REINFORCII.. NEW 8"x16" CMU BLOCK TO INFILL THE TOP OF THE FOUNDATION WALL WHERE THE TEMPORARY BEAMS INTEREFERE WITH THE CONCRETE WALL 1/2" O, 14" HEADED ANCHOR BOLT @ 4' O.C. MAX FASTEN TO SILL PRIOR TO FILLING CORES W/ CONC. (2) #5 REBAR TOP & BOTTOM 16", #5 VERTICAL REBAR @ 48" O.C. EMBEDED 12" INTO CONCRETE �CMUTOP OF WALL DETAIL OF WALL DETAIL ST2 SCALE: N.T.S. V, Q Q • Q E U (� \ w � O �.I Q Q L �U �WZ(� — :E04 V� _j � W X Cn U)uj3 Q=� (� REAL - Digitally signed Scott b Scott Orlowski Orlowski Date: 2022.05.27 13:39:38-04'00' REWWOms- \STEEL 4 BEAM TOP NAILER CONNECTION 05/27/2022 3 MODIFIED STEEL BEAM AND ADDED DETAIL 9 04/21/2022 \ ISSUED FOR CONSTRUCTION 12/16/2021 \ NO CHANGES TO THIS SHEET 11130/2021 \ ISSUED FOR PERMITTING 11/29/2021 MWED FOR - CONSTRUCTION BAYS. DEC. 16, 2021 SCALE. AS NOTED DRaMN Y- SRO DEMGHED Y- SRO I..L LLI O LL z LIJ Q OU 0- 0 = C) ~ ~O z `Uu� ��i'� Z) `J w Oz _>- I— — Q = 3:U) U=j W %� Q O � z Lu c*14 cn BRAMONG VffLE: DETAILS Dumma NUMBER: ST3 PAGE NUMBER: 3 OF 3 JOB NUMBER: 20-061 b