Loading...
HomeMy WebLinkAboutWave Building Q15316 RF Truss DESIGN DRAWINGS 04042022312 =4x4 =1.5x4 =3x4 =3x6 =5x5 =4x6 7 6 1 2 3 11 4 5 T2 T1 W3 B1 W1 W2 1-4-8 15-10-8 7-1-15 14-6-0 7-4-1 7-4-1 0-1-8 14-6-0 7-0-7 14-4-8 7-4-1 7-4-1 0-5-11 4-1-34-5-5Scale = 1:38.5 Plate Offsets (X, Y): [4:0-3-0,0-1-12], [6:0-2-8,0-2-12] Loading (psf)Spacing 2-0-0 CSI DEFL in (loc)l/defl L/d PLATES GRIP TCLL (roof)30.0 Plate Grip DOL 1.15 TC 0.74 Vert(LL)-0.11 7-10 >999 360 MT20 197/144 Snow (Pf)30.0 Lumber DOL 1.15 BC 0.78 Vert(CT)-0.22 7-10 >799 240 TCDL 10.0 Rep Stress Incr YES WB 0.49 Horz(CT)0.04 6 n/a n/a BCLL 10.0*Code IBC2015/TPI2014 Matrix-MSH BCDL 15.0 Weight: 49 lb FT = 20% LUMBER TOP CHORD 2x4 SPF No.2 BOT CHORD 2x4 SPF No.2 WEBS 2x4 SPF No.2 BRACINGTOP CHORD Structural wood sheathing directly applied or 3-6-9 oc purlins, except end verticals. BOT CHORD Rigid ceiling directly applied or 6-2-15 oc bracing. WEBS 1 Row at midpt 2-6 MiTek recommends that Stabilizers and required cross bracing be installed during truss erection, in accordance with Stabilizer Installation guide. REACTIONS (lb/size)1=783/0-7-4, (min. 0-1-8), 6=918/0-5-12, (min. 0-1-12) Max Horiz 1=508 (LC 19) Max Uplift 1=-198 (LC 19), 6=-425 (LC 19) Max Grav 1=857 (LC 28), 6=1110 (LC 28) FORCES (lb) -Max. Comp./Max. Ten. -All forces 250 (lb) or less except when shown. TOP CHORD 1-2=-1849/617, 2-3=-270/148, 3-11=-267/148, 4-11=-258/166, 4-6=-489/291 BOT CHORD 1-7=-840/2027, 6-7=-840/2027 WEBS 2-7=0/393, 2-6=-1950/658 NOTES 1)Wind: ASCE 7-10; Vult=142mph (3-second gust) Vasd=112mph; TCDL=6.0psf; BCDL=6.0psf; h=16ft; B=26ft; L=26ft; eave=4ft; Cat. II; Exp C; Open; MWFRS (directional) and C-C Corner (3) 0-0-0 to 3-0-0, Exterior (2) 3-0-0 to 15-10-8 zone; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 2)TCLL: ASCE 7-10; Pr=30.0 psf (roof live load: Lumber DOL=1.15 Plate DOL=1.15); Pf=30.0 psf (flat roof snow: Lumber DOL=1.15 Plate DOL=1.15); Category II; Exp C; Partially Exp.; Ct=1.20 3)Unbalanced snow loads have been considered for this design. 4)This truss has been designed for greater of min roof live load of 12.0 psf or 2.00 times flat roof load of 30.0 psf on overhangs non-concurrent with other live loads. 5)This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 6)* This truss has been designed for a live load of 20.0psf on the bottom chord in all areas where a rectangle 3-06-00 tall by 2-00-00 wide will fit between the bottom chord and any other members, with BCDL = 15.0psf. 7)Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 198 lb uplift at joint 1 and 425 lb uplift at joint 6. 8)This truss is designed in accordance with the 2015 International Building Code section 2306.1 and referenced standard ANSI/TPI 1. LOAD CASE(S)Standard Job Truss Truss Type Qty Ply Cape Cod Inflatable Park -Wave Bldg Q15316 M01 130Monopitch Job Reference (optional) Stark Truss Company, Inc., North Kingstown, RI 02852 Run: 8.53 S Jan 25 2022 Print: 8.530 S Jan 25 2022 MiTek Industries, Inc. Mon Apr 04 16:30:33 Page: 1 ID:m?VCb2hWVIFvXPkUeBBvqszU3Gk-WFPwhcUjxaocD6aU8Td9mHhbtGTASlKHwY1EtTzU2yK 312 =3x4 =3x6 =3x3 =2x4171615141312 11 1 2 3 4 5 21 6 7 8 9 10 T2 T1 W1 B1 ST3 ST2 ST1 ST4 ST5 ST6 1-4-8 15-10-8 14-6-0 14-6-0 14-6-0 0-5-11 4-1-34-5-5Scale = 1:34.3 Loading (psf)Spacing 2-0-0 CSI DEFL in (loc)l/defl L/d PLATES GRIP TCLL (roof)30.0 Plate Grip DOL 1.15 TC 0.29 Vert(LL)n/a -n/a 999 MT20 197/144 Snow (Pf)30.0 Lumber DOL 1.15 BC 0.13 Vert(CT)n/a -n/a 999 TCDL 10.0 Rep Stress Incr YES WB 0.04 Horz(CT)0.00 11 n/a n/a BCLL 10.0*Code IBC2015/TPI2014 Matrix-MSH BCDL 15.0 Weight: 53 lb FT = 20% LUMBER TOP CHORD 2x4 SPF No.2 BOT CHORD 2x4 SPF No.2 WEBS 2x4 SPF No.2 OTHERS 2x4 SPF No.2 BRACING TOP CHORD Structural wood sheathing directly applied or 6-0-0 oc purlins, except end verticals. BOT CHORD Rigid ceiling directly applied or 6-0-0 oc bracing. MiTek recommends that Stabilizers and required cross bracing be installed during truss erection, in accordance with Stabilizer Installation guide. REACTIONS All bearings 14-4-8. (lb) -Max Horiz 1=508 (LC 19), 18=508 (LC 19) Max Uplift All uplift 100 (lb) or less at joint(s) 1, 12, 13, 14, 15, 16, 18 except 11=-183 (LC 19), 17=-180 (LC 19) Max Grav All reactions 250 (lb) or less at joint(s) 1, 12, 14, 16, 18 except 11=358 (LC 8), 13=288 (LC 9), 15=278 (LC 28), 17=453 (LC 28) FORCES (lb) -Max. Comp./Max. Ten. -All forces 250 (lb) or less except when shown. TOP CHORD 1-2=-437/302, 2-3=-388/263, 3-4=-362/248, 4-5=-328/219, 5-21=-325/221, 6-21=-323/224, 6-7=-296/203, 7-8=-264/180, 9-11=-354/178 BOT CHORD 1-17=-307/226 WEBS 2-17=-308/173 NOTES 1)Wind: ASCE 7-10; Vult=142mph (3-second gust) Vasd=112mph; TCDL=6.0psf; BCDL=6.0psf; h=16ft; B=26ft; L=26ft; eave=2ft; Cat. II; Exp C; Open; MWFRS (directional) and C-C Corner (3) zone; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 2)Truss designed for wind loads in the plane of the truss only. For studs exposed to wind (normal to the face), see Standard Industry Gable End Details as applicable, or consult qualified building designer as per ANSI/TPI 1. 3)TCLL: ASCE 7-10; Pr=30.0 psf (roof live load: Lumber DOL=1.15 Plate DOL=1.15); Pf=30.0 psf (flat roof snow: Lumber DOL=1.15 Plate DOL=1.15); Category II; Exp C; Partially Exp.; Ct=1.204)Unbalanced snow loads have been considered for this design. 5)This truss has been designed for greater of min roof live load of 12.0 psf or 2.00 times flat roof load of 30.0 psf on overhangs non-concurrent with other live loads. 6)All plates are 1.5x4 MT20 unless otherwise indicated. 7)Gable studs spaced at 2-0-0 oc. 8)This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 9)* This truss has been designed for a live load of 20.0psf on the bottom chord in all areas where a rectangle 3-06-00 tall by 2-00-00 wide will fit between the bottom chord and any other members, with BCDL = 15.0psf. 10)Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint (s) 1, 15, 16, 14, 13, 12, 1 except (jt=lb) 11=182, 17=180. 11)Non Standard bearing condition. Review required. 12)This truss is designed in accordance with the 2015 International Building Code section 2306.1 and referenced standard ANSI/TPI 1. LOAD CASE(S)Standard Job Truss Truss Type Qty Ply Cape Cod Inflatable Park -Wave Bldg Q15316 M01GE 12Monopitch Supported Gable Job Reference (optional) Stark Truss Company, Inc., North Kingstown, RI 02852 Run: 8.53 S Jan 25 2022 Print: 8.530 S Jan 25 2022 MiTek Industries, Inc. Mon Apr 04 16:30:33 Page: 1 ID:r27HHgWExiHU9cnV_OPJSizU3EN-WFPwhcUjxaocD6aU8Td9mHhizGePSsHHwY1EtTzU2yK