HomeMy WebLinkAboutReview Checklist TOWN OF YARMOUTH
SEWAGE PLAN REVIEW CHECKLIST _
Location: A.M. 1 '4 Lot I'!• q Z Zone of Contribution: In Out Acreage
// ,e Commercial: Residential: x
Street: DI q *tams ftet
Village: l'isf.M4014i1 Floor Plan: y $ #Bedrooms: X 5-/
Owner: ThON2 S� #6144.0 Installer: de 5 .& -J
Address: /(,81SOH- It ff s. )4241101441 Phone: _
Phone: 11-0/ 2'21- t jD7Q
Builder: �Dh `lCtv � Pe
Engineer: l ' &hot Mield4y Ls S .
Address: Phone: (0
7/7-.as/77
Phone:
.1-t,ti /�,t nath 1 pomp 4 6-ff rotiJ i J1ôv v /GU2S I �� G'/O55 Se
I N/A YES NO
1.Required#of copies received ✓
2. Date of soils exam and percolation test not older than 2 years t.-----
3.4-5
3.4-5 ft of naturally occurring pervious material, above water table ✓
4.Foundation 2 ft above high point of road H.P.: Fnd: Var.:
5. Water line 10 ft from septic components Var.: L '
6. Benchmark indicated and shown-NGVD if near wetlands
7. Septic tank minimum 10 ft from foundation, deck Var.:
8.Leaching minimum 20 ft full, 15 ft crawl, 10 ft slab Var.:
9. Leaching minimum 100 ft from wetlands Var.:
10. Leaching minimum 150 ft from drinking well/25 ft irrigation well Var.: V
11. Tank/leaching minimum 10 ft from property line Var.:
12. System meets all other setback requirements Var.: ✓
13. Uses adjustment for maximum high groundwater Var.:
14.Leaching set 4-5 ft above adj. water or bottom of test hole Var.: ✓
15. System not in top or subsoil(A,B horizons) or 5'removal
16.Proposed contours are suitable
17. System meets slope requirements-min. 1/8", 'A"preferred ✓
18. System meets breakout requirements PVC liner: Wall:
19. Specified tee sizes are proper, gas baffle on outlet tee
20. Sewage is under 10,000 gpd for parcel ✓
21.No garbage disposal t
22. System adequately sized for its intended use
23.Minimum 6"stone or compacted below tank and dbox
24.Manhole covers within 6"of grade,pump chamber cover to grade
25. Inspection port on plastic chambers/leach field ✓ I726. Electrical permit for pump chamber/Separate meter for duplexes
27.Pump system-2" line,weep hole,check valve,tee in dbox,pump size ✓
28. Septic tank/pump chamber to be factory waterproofed
29. Vent provided if leaching below 3 feet, under driveway/parking tr-
30.Buoyancy calculations for tank/pump chamber
31. Engineer to inspect and certify soils: wall: commercial:
32.Engineer/Registered Sanitarian and Land Surveyor stamps/signature v"-----
33.
33. H-20 loading is subject to vehicular traffic, groundwater ✓
34. Title V Application and permit fee, installer signature Mad IRS-,(ter it ki Itik r4. t/-
35.
35.Foundation footing min. 2 feet above adjusted ground water for new house
36.Deed Restriction required max. 3 i#bedrooms: max. flow: gpd
37. Check area lots for groundwater/Label groundwater°� ' in Assessor's Map
Plan reviewed by: . VA, LW 6/03/03