Loading...
HomeMy WebLinkAboutBLD-22-6506 RECEIVED V ENGINEERING JUL 2 9 2022 4,6N Nttraf6 LF ENT 1825 Dahlia Drive Cumming GA 30040 276-220-0064 7/19/2022 SUN RUN RE: Installation Approval letter for Harrison Aguiar -Structural only Permit BLD-22-006506(52 Early Red Berry Ln,Yarmouth, MA, 02675) To Whom It May Concern: On the above referenced project, the roof structural framing has been reviewed for additional loading due to the installation of the solar PV addition to the roof.The structural review, including the plans and calculations only apply to the section of roof that is directly supporting the solar PV system and its supporting elements. EV Engineering has observed the PV installation that was specified for this project. The review was performed to verify that the installation was performed in general conformance with the plans and specifications and that any modifications were acceptable. Calculations were stamped & signed with my professional engineer's seal. After engineer's observation, it is our opinion that the work has been completed in general conformance of the provisions of the approved permits of the applicable code. Please contact me with any questions or concerns regarding this project. STRUCT Ct Sincerely, ONL ���jHOFMAss4ti , Vincent Mwumvaneza, PE z•4' VINCENT LP • O MWUMVANEZA EV Engineering, LLC C.) CIVIL NI%` "."E9, VA4.�`C • ONAleNC" . — TOWN OF YARMOUTH BUILDING DEPARTMENT 1146 Route 28, South Yallnouth, MA 02664 508-398-2231 ext. 1261 Fax 508-398-0836 FINAL AFFIDAVIT FOR SOLAR INSTALLATION I, _Sic/04o /1./teel Lic # c5-0Y062.z i 52 E4 *etc/ Bcee 14, Property Addkss RLIN- 22. co C5e6 Building Permit# 1, BLbE-22. boes-.02.. 7/13/201Z (4.3.41) Electrical Permit # Date E ectrical Permit Finalized Have installed the permitted solar system according to the manufactures specifications and the Mass. State Building Code. I do certify under pains and penalties of perjury that the information provided is true and correct. Perin' older sign he • /