Loading...
HomeMy WebLinkAboutEngineer Certification P crib JC ENGINEERING, Inc. ttAc.":"o 4 tt Civil & Environmental Engineering �4„t4, ). 2854 Cranberry Highway East Wareham, Massachusetts 02538 Ph. 508-273-0377—Fax 508-273-0367 June 13,2022 Mr. Bruce G. Murphy Health Director Town of Yarmouth Health Division 1146 Route 28 South Yarmouth, MA 02664 RE: Substantial Compliance for Newly Installed Septic System Located at 32 Almira Road, South Yarmouth, Massachusetts Dear Mr. Murphy: This letter is to certify that the new septic system located at 32 Almira Road was constructed in substantial compliance with the approved design plan entitled, Proposed Septic System Upgrade, dated May 7, 2022, prepared by our office. See attached as-built plan provided by the contractor (Robert B. Our Co., Inc.). Should you have any questions or comments,please do not hesitate to contact our office. Sincerely, ,/7 /John L. C • chill, Jr., PE, PLS President JLC/mcp cc: RBO File RECEIVED JUN 1 i3 2022 HEALTH DEPT.