HomeMy WebLinkAbout2022 Jun 13 Brown & Caldwell - May Quarterly Report 1 Tech Drive,Suite 310
Andover, MA 01810
T:978.794.0336
June 13, 2022
Brown AND .
Caldwell I Mr. Mark Dakers, Section Chief
Solid Waste Management Section
Department of Environmental Protection
Southeast Regional Office
20 Riverside Drive
Lakeville, Massachusetts 02347
Subject: Quarterly Third-Party Inspection Reports
Yarmouth-Barnstable Regional Transfer Station
Dear Mr. Dakers:
On behalf of Covanta as it relates to the Yarmouth-Barnstable Regional Transfer Station,
South Yarmouth, MA, enclosed is the Third-Party Operation and Maintenance Inspection
Report for May 2022.
If there are any questions please contact me at (508) 819-1437 or via email atjko-
towski@brwncald.com.
Very truly yours,
Brown and Caldwell
jtait, oliatetathi
Julie Kotowski
Senior Associate
cc: Yarmouth Board of Health
Roby Whitehouse, Town of Yarmouth/Barnstable via email
Thomas Stanwood, Covanta via email
Daniel Peters, Covanta via email
Attachments (1) R70 FE niED
1. Operation and Maintenance Inspection Report
' I
. 'i
HEALTH DEPT.
MassOEP Massachusetts Department of Environmental Protection Important:When completing
Bureau of Waste Prevention / Solid Waste Management this form on a computer,use
only the Tab key to move your
cursor-not the Return key.
Third-Party Inspection Report— 310 CMR 19.018(8)
Operation & Maintenance j®) Fr�
a I
Instructions
Use this form to record and report the results of a Third-Party Operation and Maintenance MassDEP Use Only
Inspection conducted pursuant to 310 CMR 19.018. Be sure to obtain the most recent version Rec'd Date:
of this form. All applicable sections of the submitted form must be completed to be accepted by
MassDEP.
Pursuant to 310 CMR 19.018(8)(a), the third-party inspector and facility owner/operator must sign FMF#:
this Third-Party Inspection Report form and submit the completed report to the appropriate RO#:
MassDEP regional office and one copy of each completed report to the board of health of the
municipality in which the facility is located. Reviewer:
In the event that this inspection report contains a recommendation for corrective action(s),the Comments:
owner/operator shall also submit the information required by 310 CMR 19.018(8)(c)2.
Forms and instructions are available online:
http:/lwww.mass.govieea/aciencieslmassdepirecycle/approvals/solid-waste-applications-and-forms.html#8
Note: This form does not identify all of the requirements applicable to each solid waste
management facility;other requirements and/or policies may apply to the operation, maintenance
and monitoring for each facility.
I. Facility Information
Facility Type (check one):
®Transfer Station/Handling Facility ❑ C&D Waste Processor or C&D Waste Transfer Station ❑ Municipal Waste Combustor
❑Active Landfill ❑ Closed Landfill ❑ Other:
Specify
Facility:
Yarmouth-Barnstable Regional Transfer Station
Facility Name
South Yarmouth MA 02664
City/Town State ZIP Code
508-394-1501 329275 329274
Telephone Number Regulated Object Account Number FMF Number
Operator:
Covanta Company of SEMASS, L.P.
Operator Name(Doing Business As/Company Name)
781-843-6209 tstanwood@covanta.com
Telephone Number Email Address
141 Cranberry Highway
Mailing Address
West Wareham MA 02576
City/Town State ZIP Code
Permittee:
Town of Yarmouth— Department of Public Works
Permittee Name(Entity Identified on Facility Permit)
50 Workshop Road
Mailing Address
South Yarmouth MA 02664
City/Town State ZIP Code
Responsible Official for the Facility:
Thomas Stanwood tstanwood@covanta.com
Responsible Official Name(Individual) Responsible Official Email Address
Covanta 781-843-6209
Responsible Official Company Name Responsible Official Telephone Number
Third-Party Inspection Report(O&M)-Rev.12/4/14 Page 1 of 13
MassDEP Massachusetts Department of Environmental Protection
LBureau of Waste Prevention / Solid Waste Management
Third-Party Inspection Report—310 CMR 19.018(8)
Operation & Maintenance
II. Third-Party Inspector
Andrew Bushman Brown and Caldwell
Third-Party Inspector Name Company Name
SW48-0000140 07/09/2023
MassDEP Third-Party Inspector Identification Number MassDEP Third-Party Inspector Expiration Date(MM/DD/YYYY)
508-819-1437 abushman@brwncald.com
Telephone Number Email Address
1 Tech Drive, Suite 310
Mailing Address
Andover MA 01810
City/Town State ZIP Code
Construction and Demolition Waste (C&D Waste) Processing Facility or C&D Waste Transfer Station Only:
Identify the qualified individual that conducted the observation of incoming waste loads and collection of samples of suspect asbestos-
containing materials during the inspection [pursuant to 310 CMR 19.018(6)(f)]. If the entire inspection was conducted by the third-party
inspector listed above,then check the box and enter only the Asbestos Inspector Certification Number.
❑ Same as above. Provide Asbestos Certification Number ► MA Dept.of Labor Standards Asbestos Inspector Certification Number
Asbestos Inspector Name Company Name
Telephone Number Email Address
Mailing Address
City/Town State ZIP Code
Ill. Inspection Details
A. FREQUENCY
Indicate the scheduled inspection frequency for this facility as required by 310 CMR 19.018(6)(b), or a more frequent schedule set forth
in the Facility Permit/Other Approval:
❑ Bi-Monthly ® Quarterly ❑ Semi-Annual ❑ Annual ❑ Biennial
❑ Other(include permit/approval type and date of issuance):
B. DATE,TIME&PERSONNEL
Inspection Date (MM/DD/YYYY): 05/16/2022
Inspection Start Time: 10:00 ® AM ❑ PM
Facility Representatives in Attendance During Inspection: Janet Baierlein, Scale Operator for Lawrence Waste Services
C. CONDITIONS
Air Temperature: Approximately 65 degrees F. Wind Direction (direction from which the wind is blowing):
Weather: ® Clear ❑ Partly Cloudy ❑ Cloudy ® NW ❑ N ❑ NE
® Dry ❑ Rain ❑ Snow
❑w Wind ❑ E
Wind Speed: ❑ Calm ® Breeze ❑ Moderate ❑ Strong ❑sw ❑s ❑SE
Third-Party Inspection Report(O&M) Page 2 of 13
MassOEP Massachusetts Department of Environmental Protection
Bureau of Waste Prevention / Solid Waste Management
Third Party Inspection Report 310 CMR 19.018(8)
Operation & Maintenance
IV. Pre-Inspection Preparation
A. FACILITY-SPECIFIC O&M REQUIREMENTS
During each third-party inspection, the third-party inspector shall examine and evaluate the facility's solid waste activities, equipment,
operations, practices, procedures, and records relevant to the type of third-party inspection being conducted in order to determine the
facility's compliance with all applicable requirements as set forth in 310 CMR 19.018(6)(a)1.
Therefore, pursuant to 310 CMR 19.018(6)(a)1, prior to conducting a third-party facility operation and maintenance
inspection, the third-party inspector shall,without limitation, complete all of the following:
® Review and become familiar with the regulations set forth at 310 CMR 19.000—Massachusetts Solid Waste Regulations.
® Identify, review and become familiar with all solid waste permits, plans, approvals, and orders (or other enforcement documents
issued to the facility by the Department), and the solid waste requirements applicable to the operation and maintenance of the
facility.
Relevant requirements may include, without limitation, specific practices and procedures for the operation, maintenance and
monitoring of the facility, waste acceptance/storage limits, and other requirements related to the facility's solid waste activities.
Without limitation, these facility-specific requirements may be contained in the Facility Permit,Authorization to Construct,
Authorization to Operate, Operation and Maintenance Plan, Closure/Post-Closure Plans and Approvals, Facility Modification
Approvals, Beneficial Use Determinations,Administrative Consent Orders, and other determinations, authorizations or
enforcement actions issued by the Department.
I,Andrew Bushman, have identified, reviewed and understand all of the aforementioned requirements that ► ACB
are applicable to this facility and the following are my observations and recommendations related to the Inspector Initials
facility-specific requirements.
B. SOLID WASTE PERMITS, PLANS,APPROVALS &ORDERS
List all relevant solid waste permits, plans, approvals, orders or other enforcement actions issued to the facility by the Department that
contain specific practices, procedures and other requirements still in effect for the operation, maintenance and monitoring or
closure/post-closure of the facility. Where applicable, provide the plan or issue date for each item. For enforcement actions, include
the document number, effective date, and status of implementation by the facility.
Discussion: Listed below are relevant solid waste permits and approvals, only applicable permit conditions are listed.
1. Operation and Maintenance Plan, dated June 2010.
2. Permit Clarification Notice, BWP SW 07, Trans No. X233508, dated 09/22/2010.
-Tonnage rate clarification: 38 TPD of SSR as an average rate.
- Max. tonnage rate: 530 TPD of MSW and SSR combined.
-Third Party inspections: inspections done on a quarterly basis.
3. Provisional Approval BWP SW 07 Modification of Large Handling Facility, Trans No. X233508, 08/06/2010.
4. Site Assignment, Yarmouth Board of Health, 11/10/1987.
5. Certification for Transfer Station Waste Ban Compliance Plan Pursuant 310 CMR 19.035, dated 06/24/2014.
6. Certification for Operation and Transfer Station pursuant 310 CMR 19.035(2)(f), dated 02/13/2020.
Third-Party Inspection Report(O&M) Page 3 of 13
MassDEP Massachusetts Department of Environmental Protection
Bureau of Waste Prevention / Solid Waste Management
Third-Party Inspection Report—310 CMR 19.018(8)
Operation & Maintenance
V. Performance Standards
Examine and evaluate the facility's solid waste activities, equipment, operations, practices, procedures and records relevant to the type
of solid waste facility.
Using the tables below, identify all areas evaluated by the inspector during the inspection by checking the box in the first column.
Describe all deviations noted during the inspection in the third column. Provide recommendations for corrective action to return to
compliance with the applicable performance standard in the fourth column.
Facility Type Performance Standards
Transfer Station/Handling Facility Complete Section A.
(Including C&D Facility) If C&D Handling/Processing Facility,then also complete Section B.
Municipal Waste Combustor Complete Section A.
Active Landfill Complete Sections C. and F.
If active ash landfill,then also complete Section D.
Closed Landfill Complete Sections E. and F.
A. TRANSFER STATION, HANDLING FACILITY, OR MUNICIPAL WASTE COMBUSTOR(INCLUDING C&D FACILITY)
Comments/Observations and
Evaluated Performance Standard Deviation(s) Recommended Corrective
Action(s)
19.205(1)
Storm Water Controls. Good
19.205(2)
Equipment. Good
19.205(3) Good
Weighing Facilities.
19.207(1)
General. Discuss in Section VI. Discuss in Section VI.
19.207(2)
Supervision of Operation. Good
19.207(3)
Access to Facilities. Good
19.207(4) Good
Security.
19.207(5) Good
Posting of Handling Facility.
19.207(6)
Unloading of Refuse. Managed effectively
19.207(7)
Special Wastes. None observed
19.207(8)
® Banned/Restricted Wastes. Managed effectively
19.207(9) None observed
Hazardous Waste.
19.207(10)
Household Hazardous Waste Not applicable
and Waste Oil Collections.
19.207(11)
Bulky Waste. None observed
19.207(12) None observed
Liquid Wastes.
Third-Party Inspection Report(O&M) Page 4 of 13
MassDEP Massachusetts Department of Environmental Protection
Bureau of Waste Prevention / Solid Waste Management
Third-Party Inspection Report—310 CMR 19.018(8)
Operation & Maintenance
Comments/Observations and
Evaluated Performance Standard Deviation(s) Recommended Corrective
Action(s)
19.207(13)
Bird Hazards. No bird hazards observed
19.207(14)
Dust Control. No dust conditions observed outside of
tipping floors
19.207(15)
Vector Control. No vector conditions observed
19.207(16)
Control of Wind-blown Litter. Managed effectively—see discussion
in Section VI
19.207(17)
Adequate
Staffing.
q
19.207(18) Good
Employee Facilities.
19.207(19)
Accident Prevention/Safety. Good
19.207(20) Good
Fire Protection.
19.207(21)
Recycling Operations. Managed effectively
19.207(22)
Records for Operational and Good
Plan Execution.
19.207(23)
Screening and/or Fencing. Good
19.207(24)
Open Burning. None observed
19.207(25)
Inspections. Quarterly
19.207(26)
End-of-Life Mercury-added None observed
Products.
B. CONSTRUCTION AND DEMOLITION (C&D)WASTE PROCESSING FACILITY OR C&D WASTE TRANSFER STATION
Comments/Observations and
Evaluated Performance Standard Deviation(s) Recommended Corrective
Action(s)
❑ 19.206(1)
Enclosed Operations.
❑ 19.206(2)
Storage.
❑ 19.206(3)
Contact Water.
❑ Suspect Asbestos-Containing
Material (ACM) Inspection and
Management Protocol.
Sample collection of suspect
❑ ACM from incoming loads. Discuss sample results:
► ❑ Attach analytical reports.
Third-Party Inspection Report(O&M) Page 5 of 13
MassDEP Massachusetts Department of Environmental Protection
Bureau of Waste Prevention / Solid Waste Management
Third-Party Inspection Report—310 CMR 19.018(8)
Operation & Maintenance
C. ACTIVE LANDFILL
Evaluated Performance Standard Deviation(s) Comments/Observations and
Recommended Corrective Action(s)
19.130(1)
General. Discuss in Section VI. Discuss in Section VI.
19.130(2)
Operator Supervision.
19.130(3)
Special Wastes.
19.130(4)
Banned/Restricted Wastes.
19.130(5)
Hazardous Waste.
19.130(6)
Bulky Wastes.
19.130(7)
Liquid Wastes.
19.130(8)
Solid Waste Handling.
19.130(9)
Bird Hazards.
19.130(10)
Equipment and Shelter.
19.130(11)
Staffing.
19.130(12)
Employee Facilities.
19.130(13)
Accident Prevention/Safety.
19.130(14)
Spreading and Compacting of
Solid Waste.
19.130(15)
Cover Material.
19.130(16)
Vector, Dust and Odor Control.
19.130(17)
Litter Control.
19.130(18)
Top Slope and Side Slopes.
19.130(19)
Storm Water Drainage.
19.130(20)
Erosion Control.
19.130(21)
Boundary/Elevation Markers.
19.130(22)
Access Roads.
19.130(23)
Security.
19.130(24)
Posting of the Landfill.
Third-Party Inspection Report(0&M) Page 6 of 13
MassOEP Massachusetts Department of Environmental Protection
Bureau of Waste Prevention / Solid Waste Management
Third-Party Inspection Report- 310 CMR 19.018(8)
Operation & Maintenance
Comments/Observations and
Evaluated Performance Standard Deviation(s) Recommended Corrective Action(s)
19.130(25)
Open Burning.
19.130(26)
Fire Protection and Control.
19.130(27)
Convenience and Recycling
Drop-off Areas at Landfills.
19.130(28)
Waste Oil Collections at
Landfills.
19.130(29)
Household Hazardous Waste
Collections at Landfills.
19.130(30)
Leachate Collection,
Treatment and Disposal.
19.130(31)
Phase Completion of the
Landfill.
19.130(32)
Disruption of Landfilled Areas.
19.130(33)
Construction of Buildings.
19.130(34)
Records for Operational and
Plan Execution.
19.130(35)
Inspections.
19.130(36)
Re-circulation of Leachate.
19.130(37) End-of-Life
Mercury-added Products.
D. ASH LANDFILL
Comments/Observations and
Evaluated Performance Standard Deviation(s) Recommended Corrective Action(s)
19.131(1)
General. Discuss in Section VI. Discuss in Section VI.
19.131(2)
Fugitive Emissions.
19.131(3)
Ash Moisture Content.
19.131(4)
Spreading/Compacting of Ash.
19.131(5)
Vehicle Washdown/
Wheelwash/Other Measures.
Third-Party Inspection Report(O&M) Page 7 of 13
MassDEP Massachusetts Department of Environmental Protection
Bureau of Waste Prevention / Solid Waste Management
Third-Party Inspection Report—310 CMR 19.018(8)
Operation & Maintenance
E. CLOSED LANDFILL
Evaluated Performance Standard Deviation(s) Comments/Observations and
Recommended Corrective Action(s)
19.016
Post-closure Use.
19.142(1)
❑ General. Discuss in Section VI. Discuss in Section VI.
19.142(2)
Post-closure Period.
19.142(3)
Post-closure Period Waiver.
19.142(4)
El
Post-closure Period Extension.
19.142(5)
Post-closure Requirements.
19.142(6)
Inspection Requirements.
19.142(7)
Additional Measures.
19.142(8)
Termination of the Post-
Closure Period.
19.143(1)
Applicability.
19.143(2)
Submission of Post-closure
Use Plans.
19.143(3)
Criteria for Approval of Post-
closure Use.
19.143(4)
Post-closure Construction.
Third-Party Inspection Report(0&M) Page 8 of 13
MassOEP Massachusetts Department of Environmental Protection
Bureau of Waste Prevention / Solid Waste Management
Third-Party Inspection Report— 310 CMR 19.018(8)
Operation & Maintenance
F. ADDITIONAL LANDFILL REQUIREMENTS
Evaluated Performance Standard Comments/Observations and
Recommended Corrective Action(s)
❑ 19.132
Environmental Monitoring Requirements.
Is the monitoring of surface water, ground water, landfill
gas and any other media as determined by the
Department, including without limitation, soil and
sediment, being conducted on the schedule established in
the permit or as otherwise required by the Department?
❑ YES ❑ NO
Are the analytical results of the environmental monitoring
submitted to the Department within 60 days after the date
of sample collection or as otherwise specified by the
Department?
❑ YES ❑ NO
❑ 19.133
Maintenance of Environmental Control and Monitoring
Systems.
Are the facility operations conducted in a manner which
protects all environmental control systems as approved in
the Operation and Maintenance plan and monitoring
systems as approved in the Operation and Maintenance
plan or permit?
❑ YES ❑ NO
Is regular maintenance of all landfill environmental control
systems performed as approved in the Operation and
Maintenance plan or permit?
❑ YES ❑ NO
Has the Department been notified of the existence and
extent of damaged or destroyed environmental control
systems, monitoring devices, or surface water sampling
location markers in accordance with 310 CMR
19.133(1)(c)and/or 19.133(1)(e)?
❑ N/A(if no damage to report) ❑ YES ❑ NO
Continue to Next Page ►
Third-Party Inspection Report(O&M) Page 9 of 13
MassDEP Massachusetts Department of Environmental Protection
Bureau of Waste Prevention / Solid Waste Management
Third-Party Inspection Report-310 CMR 19.018(8)
Operation & Maintenance
F. ADDITIONAL LANDFILL REQUIREMENTS—Continued
Evaluated Performance Standard Comments/Observations and
Recommended Corrective Action(s)
❑ 19.121(4)
Landfill Gas Recovery Operation and Maintenance
Requirements.
Is condensate generation kept to a minimum and
condensate recirculation, if proposed, performed in
accordance with the permit?
❑ YES ❑ NO
Are the sampling and analysis of condensate conducted
on the schedule established in the permit or as otherwise
required by the Department?
❑ YES ❑ NO
Are the analytical results of condensate monitoring
reported to the Department as established in the permit or
as otherwise required by the Department?
❑ YES ❑ NO
Is an annual report on the operation of the landfill gas
recovery facility submitted to the Department as specified
in the permit?
❑ YES ❑ NO
Third-Party Inspection Report(0&M) Page 10 of 13
•
MassDEP Massachusetts Department of Environmental Protection
Bureau of Waste Prevention / Solid Waste Management
Third-Party Inspection Report—310 CMR 19.018(8)
Operation & Maintenance
VI. Inspection Observations
A. FACILITY CONDITION AND OPERATIONS
Examine and evaluate the facility condition and operations as observed during the inspection, including the following:
® Describe any evidence of the following conditions observed at the time of the inspection:
• Unpermitted discharges to air,water, land or other natural resources of the Commonwealth; and
• Dust, odors, litter, and/or other nuisance conditions.
® Document and discuss all deviations from any specific requirements for the facility that are not addressed in the previous section
(Section V.—Performance Standards), including without limitation,the requirements set forth in the facility's operation and
maintenance plan, orders or other enforcement documents,and other solid waste permits, approvals,and authorizations issued to
the facility by MassDEP.
® List the types and estimated quantities of all waste and materials stored at the facility at the time of the inspection.
® Provide a narrative that describes the overall status of the general condition, operation and performance of the facility as
observed at the time of the inspection.
cAttach photographs taken during the inspection that depict the general condition and operation of the facility. At a minimum, include
photographs, as applicable, of the waste unloading (tipping)area,waste storage areas, recyclable material storage and,for transfer
stations,the waste reloading activity.
Discussion: At the time of the inspection,the Facility appeared to be operating within the conditions of permits, approvals,and
Operation&Maintenance Plan. There was no evidence of unpermitted discharges to air,water, land or other natural resources.
Some litter was observed along the northwestern portion of the rail line. According to the facility representative, routine litter
pickup is conducted.
No dust, odors, or other nuisance conditions were identified.
B. RECORD REVIEW
Examine and evaluate the facility's record-keeping. Without limitation, document the status of the facility's compliance with, and any
deviations from, the record-keeping required by 310 MCR 19.000;the facility's operation and maintenance plan; orders or other
enforcement documents issued to the facility; and other solid waste permits, approvals, determinations and authorizations issued to the
facility by the Department, including the following:
® Discuss the evaluation of the Facility's"daily log"such as, daily tonnage records.
® List and discuss any special incidents that have occurred since the previous inspection such as exceedances of the facility's
permitted waste acceptance limits, nature and outcome of complaints reported to the facility operator(including the identity of the
complainant, if known),fires, emergencies,or other disruptions to the routine operation of the facility.
Discussion: Based on the tonnage records reviewed and provided by Covanta,the Facility appears to be within the permitted
tonnage limits for the period of March through May 2022.
Third-Party Inspection Report(0&M) Page 11 of 13
MassOEP Massachusetts Department of Environmental Protection
Bureau of Waste Prevention / Solid Waste Management
Third-Party Inspection Report—310 CMR 19.018(8)
Operation & Maintenance
VII. Summary and Recommendations
Pursuant to 310 CMR 19.018(6)(a)4., where a third-party inspector observes that the operation or maintenance of the facility deviates
from the aforementioned applicable requirements, he or she shall document all such deviations and recommend corrective actions for
the facility to take to return to compliance.
A. INSPECTION RESULTS
Based on the examinations and evaluations conducted in Sections V. and VI., please summarize the inspection results by checking one
of the following determinations:
® No deviations from the applicable performance standards or additional requirements listed at 310 CMR 19.018(6)
were identified during this inspection.
If no deviations were identified during the inspection, check this box and proceed to Section VII.B.
❑ Deviations from the applicable performance standards or additional requirements listed at 310 CMR 19.018(6)were
identified during this inspection and are discussed further in this report.
If deviations were identified during the inspection, check this box and ensure that each deviation and the recommended
corrective actions are discussed in the applicable section(s)below.
B. STATUS OF PREVIOUS RECOMMENDATIONS FOR CORRECTIVE ACTION
If a previous inspection report identified deviations with recommendations for corrective action, please describe the action(s)taken
since the last inspection to return the facility to compliance with the applicable requirements.
Discussion: N/A
C. RECOMMENDATIONS FOR CORRECTIVE ACTION
Based on the results of this inspection, please list all deviations noted during the inspection and provide recommendations for corrective
action to return to compliance with the applicable requirement.
Recommendations: None.
D. ADDITIONAL COMMENTS
Comments:
VIII. Additional Information Checklist
Attach the following additional information, as applicable, to complete the inspection report.*
® Attach photographs taken during the inspection that depict the general condition and operation of the facility, as required in
Section VI.A.
❑ For C&D Waste facilities only, attach the analytical results, as required in Section V.B.
*Note:Pursuant to 310 CMR 19.018(8), MassDEP may request additional information.
Continue to Certification Statement on Next Page ►
Third-Party Inspection Report(O&M) Page 12 of 13
MassOEP Massachusetts Department of Environmental Protection
Bureau of Waste Prevention / Solid Waste Management
Third-Party Inspection Report—310 CMR 19.018(8)
Operation & Maintenance
IX. Certification —THIRD-PARTY INSPECTOR
"I attest under the pains and penalty of perjury that:
Signature of Third-Party Inspector
1. I have personally examined and am familiar with the information
contained in this submittal,including any and all documents
accompanying this certification statement; Andrew Bushman
2. Based on my inquiry of those persons responsible for obtaining the Print Full Name
information,the information contained in this submittal is,to the best of
my knowledge,true,accurate and complete; Brown and Caldwell
3. I have been able to conduct the third-party inspection and prepare the Company Name
third-party inspection report without being influenced by the facility
owner or operator and, (if I am a municipal employee)without being 06/13/2022
influenced by my municipal employer,by any coworker or by any
elected or appointed official of the municipality;and Date(MM/DD/YYYY)
4. I am aware that there are significant penalties,including, but not limited
to,possible administrative and civil penalties for submitting false,
inaccurate,or incomplete information and possible fines and
imprisonment for knowingly submitting false, inaccurate,or incomplete
information."
X. Certification - FACILITY OWNER/OPERATOR
Does the facility maintain a Financial Assurance Mechanism (FAM)pursuant to 310 CMR 19.051? ❑ YES ® NO
If yes: • Enter the amount of the current FAM: $
• Enter the date of the last revision of the FAM amount, pursuant to 310 CMR 19.051(6):
As a reminder,pursuant to 310 CMR 19.051(6), the estimate of the cost of closure and post-closure
maintenance must be revised every year, and every second year shall be submitted to the Department.
"I certify under the penalty of law:
1. That I have personally examined and am familiar with the information Signature of Responsible Official
submitted in this third-party inspection report,including but not limited to
the statements above concerning the financial assurance mechanism in Thomas Stanwood
place in accordance with any facility permit and 310 CMR 19.051,and Print Full Name
all attachments and that,based on my inquiry of those individuals
immediately responsible for obtaining the information, I believe that the Facility Manager
information is true,accurate and complete. I am aware that there are Title
significant penalties both civil and criminal for submitting false
information including possible fines and imprisonment. 06/13/2022
2. That,in the event that this inspection report contains a recommendation Date(MM/DD/YYYY)
for corrective action(s), I have completed and attached to this report a
Corrective Action Plan and Schedule*,pursuant to 310 CMR
19.018(8)(c)2." ► Pursuant to 310 CMR 19.018(8)(c),a copy of each third-
party inspection report shall be maintained at the facility in
*Note:The owner or operator may elect to correct deviations identified in the Third- accordance with the requirements of 310 CMR 19.000. The
Party Inspection Report in a manner that is different than that recommended by the owner and operator shall make third-party inspection reports
Third-Party Inspector,so long as the facility is brought back into compliance with available to personnel or authorized representatives of the
applicable requirements. Department for review at the facility upon request.
Within 30 days of the • Mail this completed form to the MassDEP Regional A list of municipalities and MassDEP Regional
inspection date: Office that serves the municipality in which the facility Offices is available online at:
is located. (Attention:Solid Waste Management) http://www.mass.gov/eea/agencies/massdep/about/
contacts/find-the-massdep-regional-office-for-your-
• Send one copy to the local board of health for the city-or-town.html
municipality in which the facility is located.
Third-Party Inspection Report(O&M) Page 13 of 13
Covanta
Yarmouth-Barnstable Regional Transfer Station
May 2022 Quarterly Inspection
--hdL.
E b�k m` k"' tib..
"' yrut, ""f' eb• ✓te ,b yxfi!,,,
-syr a&`w
n.4 ds'✓� .4* +y
Photograph 1 - Scale
dilellit'All It
Photograph 2 - Receiving building
Brown AND
Caldwell i
Covanta
Yarmouth-Barnstable Regional Transfer Station
May 2022 Quarterly Inspection
a
.. \
kloitilt.
a
Photograph 3 - Access road along rail container loading area facing east
0.
s
N"pw• -;o
, yfr �
A
o
M
ft.- -: it,.,4.
Photograph 4 - Tippling Floor
Brown.c
Caldwell I
Covanta
Yarmouth-Barnstable Regional Transfer Station
May 2022 Quarterly Inspection
9% 1 li 1 y& Y.
. ., ,4,
„,
.r
. , . ,.... .,,,,,,
,„ ,
. ,...
....„...,. . .,
.„ „
...,-- ,
Photograph 5 -Access road along railway area facing west
Brown AND
Caldwell
MassDEP Massachusetts Department of Environmental Protection Important:When completing
Bureau of Waste Prevention /Solid Waste Management this form on a computer,use
only the Tab key to move your
cursor-not the Return key.
Third-Party Inspection Report—310 CMR 19.018(8)
Waste Ban Compliance ' fJ /%
Instructions
Use this form to record and report the results of a Third-Party Waste Ban Compliance Inspection MassDEP Use Only
conducted pursuant to 310 CMR 19.018. Be sure to obtain the most recent version of this form. All
applicable sections of the submitted form must be completed to be accepted by MassDEP. Recd Date.
Pursuant to 310 CMR 19.018(8)(a),the third-party inspector and facility owner/operator must sign this
Third-Party Inspection Report form and submit the completed report to the appropriate MassDEP regional FMF#:
office and one copy of each completed report to the board of health of the municipality in which the facility
is located. RO#:
In the event that this inspection report contains a recommendation for corrective action(s),the Reviewer:
owner/operator shall also submit the information required by 310 CMR 19.018(8)(c)2.
Comments:
Forms and instructions are available online:
http://www.mass.gov/eea/agencies/massdep/recycle/approvals/solid-waste-applications-and-forms.html#8
Pursuant to 310 CMR 19.018(7)(b),facilities that do not accept loads greater than five cubic yards,and
facilities that participate in the Class II Recycling Program in accordance with 310 CMR 19.300,are
exempt from the requirements of 310 CMR 19.018(7).
Note: This form does not identify all of the requirements applicable to each solid waste management
facility;other requirements and/or policies may apply to the operation,maintenance and monitoring of
each facility.
I. Facility Information
Facility Type(check one):
®Transfer Station/Handling Facility El C&D Waste Processor or C&D Waste Transfer Station ❑ Municipal Waste Combustor
❑Active Landfill ❑ Other
Specify
Facility:
Yarmouth-Barnstable Regional Transfer Station
Facility Name
South Yarmouth MA 02664
City/Town State ZIP Code
508-394-1501 329275 329274
Telephone Number Regulated Object Account Number FMF Number
Operator:
Covanta Company of SEMASS, L.P.
Operator Name(Doing Business As/Company Name)
781-843-6209 tstanwood@covanta.com
Telephone Number Email Address
141 Cranberry Highway
Mailing Address
West Wareham MA 02576
City/Town State ZIP Code
Permittee:
Town of Yarmouth— Department of Public Works
Permittee Name(Entity Identified on Facility Permit)
50 Workshop Road
Mailing Address
South Yarmouth MA 02664
City/Town State ZIP Code
Responsible Official:
Thomas Stanwood tstanwood@covanta.com
Responsible Official Name(Individual) Responsible Official Email Address
Covanta 781-843-6209
Responsible Official Company Name Responsible Official Telephone Number
Third-Party Inspection Report(Waste Ban)-Rev.12/4/14 Page 1 of 7
MassOEP Massachusetts Department of Environmental Protection
Bureau of Waste Prevention / Solid Waste Management
Third-Party Inspection Report—310 CMR 19.018(8)
Waste Ban Compliance
II. Third-Party Inspector
Andrew Bushman Brown and Caldwell
Third-Party Inspector Name Company Name
SW48-0000140 07/09/2023
MassDEP Third-Party Inspector Identification Number MassDEP Third-Party Inspector Expiration Date(MM/DD/YYYY)
(508) 819-1426 abushman@brwncald.com
Telephone Number Email Address
1 Tech Drive, Suite 310
Mailing Address
Andover MA 01810
City/Town State ZIP Code
III. Inspection Details
A. FREQUENCY
Indicate the scheduled inspection frequency for this facility (as required by 310 CMR 19.018(7)(d), or a more frequent schedule set forth
in the Facility Permit/Other Approval):
❑ Bi-Monthly ❑ Quarterly Z Semi-Annual ❑ Annual
❑ Other(include permit/approval type and date of issuance): See general comments below.
B. DATE,TIME&PERSONNEL
Inspection Date(MM/DD/YYYY): 05/16/2022
Inspection Start Time: 10:00 ®AM ❑ PM
Facility Representatives in Attendance During Inspection: Janet Baierlein, Scale Operator for Lawrence Waste Services
C. GENERAL COMMENTS
Eight qualifying loads were visually inspected during this inspection.
Third-Party Inspection Report(Waste Ban) Page 2 of 7
MassOEP Massachusetts Department of Environmental Protection
Bureau of Waste Prevention / Solid Waste Management
Third-Party Inspection Report-310 CMR 19.018(8)
Waste Ban Compliance
IV. Pre-Inspection Preparation
A. FACILITY-SPECIFIC WASTE BAN COMPLIANCE REQUIREMENTS
During each third-party inspection,the third-party inspector shall assess compliance with the waste bans by the facility and by the
haulers and generators delivering waste to the facility, in order to determine the facility's compliance with all applicable waste ban
requirements as set forth in 310 CMR 19.018(7)(c)1.
Therefore, pursuant to 310 CMR 19.018(7)(c)1, prior to conducting a third-party waste ban inspection,the third-party
inspector shall,without limitation, complete all of the following:
® Identify, review and become familiar with all solid waste requirements applicable to waste ban compliance at the facility
including the facility's waste ban compliance plan, as approved by the Department.
® Review and become familiar with the regulations set forth at 310 CMR 19.017—Waste Bans.
® Review and become familiar with MassDEP's Guidance for Solid Waste Handling and Disposal Facilities on Compliance with
MassDEP's Waste Bans.
I,Andrew Bushman, have identified, reviewed and understand all of the aforementioned requirements that ► ACB
are applicable to this facility and the following are my observations and recommendations related to the Inspector Initials
facility-specific requirements.
B. CURRENT WASTE BAN COMPLIANCE PLAN
06/24/2014 Certification Form 19.035
Plan Date(MM/DD/YYYY) Approval Date,if applicable
Identify the number of comprehensive load inspections the facility is required to conduct each month*: 16
(see Waste Ban Compliance Plan,Part D) Number of Loads
*Note: This is independent from and may be different than the required number of loads observed during a Third-Party Waste Ban Inspection.
C. MINIMUM NUMBER OF LOADS FOR OBSERVATION
Identify the number of incoming waste loads that will be observed by the third-party inspector during the inspection:
❑ Standard: Pursuant to 310 CMR 19.018(7)(e)1,the minimum number of loads observed during the inspection will be:
❑ For a facility permitted to accept from 1 to 99 tons of waste per day,four(4)vehicle loads.
❑ For a facility permitted to accept greater than 99 but less than 299 tons of waste per day, eight(8)vehicle loads.
❑ For a facility permitted to accept greater than 299 but less than 499 tons of waste per day, twelve(12)vehicle loads.
❑ For a facility permitted to accept greater than 499 but less than 999 tons of waste per day, sixteen (16)vehicle loads.
El For a facility permitted to accept more than 999 tons of waste per day,twenty(20)vehicle loads.
® Alternative: Pursuant to 310 CMR 19.018(7)(e)2,an alternative number of loads*will be observed during 8
the inspection. Identify the number of loads and provide the basis for using this alternative: Number of Loads
*Note.As an alternative to the minimum number of loads set forth at 310 CMR 19.018(7)(e)1, for a facility that has operated below the facility's
permitted capacity for the previous year, the third-party inspector may apply the average actual daily receipt of waste(in tons)over the
preceding year(instead of the permitted tonnage amount)to the minimum load criteria set forth at 310 CMR 19.018(7)(e)1.
Explanation:Based on the current average tonnage from 2021 records (approx. 217 TPD).
Page 3 of 7
Third-Party Inspection Report(Waste Ban)
MassDEP Massachusetts Department of Environmental Protection
Bureau of Waste Prevention / Solid Waste Management
Third-Party Inspection Report—310 CMR 19.018(8)
Waste Ban Compliance
D. OTHER PLANS,APPROVALS &ORDERS
List all other relevant permits, plans, approvals, orders or other enforcement actions issued to the facility by the Department that
contain specific practices, procedures, and other requirements still in effect for waste ban compliance at the facility. Where
applicable, provide the plan or issue date for each item. For enforcement actions, include the document number, effective date and
status of implementation by the Facility.
Permits/Plans/Approvals:
Certification for Transfer Station Waste Ban Compliance Plan pursuant to 310 CMR 19.035, dated 06/24/2014.
V. Inspection Observations
During the inspection and for the minimum number of loads as required pursuant to 310 CMR 19.018(7)(e), the third-party inspector
shall examine and evaluate waste ban compliance as follows:
A. OPERATIONS &RECORD-KEEPING
Examine and evaluate the facility's operations and record-keeping related to waste ban compliance.
Performance Standard Response Comments/Observations and
Recommended Corrective Action(s)
Is the ongoing monitoring of incoming waste being conducted in ® YES ❑ NO
accordance with the facility's approved waste ban compliance
plan and other applicable requirements?
Are the comprehensive load inspections of incoming waste ® YES ❑ NO
being conducted in accordance with the minimum inspection
frequency set forth in the facility's approved waste ban
compliance plan? (Refer to Section IV.B. above.)
Are the results of the ongoing monitoring and comprehensive ®YES ❑ NO
load inspections being properly documented in accordance with
the facility's approved waste ban compliance plan and other
applicable requirements?
Is the failed load communication, including failed load letters as ® YES ❑ NO
applicable, being conducted in accordance with the facility's
approved waste ban compliance plan and other applicable
requirements?
B. LOAD OBSERVATION
Once the third-party inspector begins the Waste Ban inspection, the third-party inspector shall visually monitor and document all
incoming loads received at the facility during the inspection until the applicable minimum number of loads containing at least five cubic
yards of material each have been observed. (Refer to Section IV.C. above.) Please retain photographs and a copy of the weigh slip
(if applicable)for each failed load identified during the inspection. Do not submit photographs or weigh slips with this inspection
report; MassDEP may request such information to be submitted separately.
® Report data for each load observed during the inspection by completing the table provided by the Department online at:
http://www.mass.qov/eea/agencies/massdep/recycle/approvals/solid-waste-applications-and-forms.html#8. Note: the
completed Load Observation Table will be submitted to the Department electronically. Refer to the instructions in Section
VII.
General Comments/Observations: Eight qualifying loads entered the facility during the timeframe of this inspection.
Third-Party Inspection Report(Waste Ban) Page 4 of 7
MassOEP Massachusetts Department of Environmental Protection
Bureau of Waste Prevention / Solid Waste Management
Third-Party Inspection Report-310 CMR 19.018(8)
Waste Ban Compliance
C. COMPARATIVE ANALYSIS
Pursuant to 310 CMR 19.018(8)(b)2.b.,the third-party inspector shall provide a comparative analysis of the percentage of failed loads
identified by the third-party inspector during the inspection and the percentage of failed loads documented pursuant to the ongoing load
inspections conducted over the immediately preceding inspection period in accordance with the facility's approved waste ban
compliance plan. For the purposes of the comparative analysis,the preceding inspection period should consist of the appropriate
number of whole months prior to the inspection. For example, if a semi-annual inspection is required (one inspection every six months),
then the comparative analysis for an inspection that occurs in November should include waste ban compliance data from May through
October(the preceding whole six months).
® Prepare the comparative analysis required by 310 CMR 19.018(8)(b)2.b. by completing the comparative analysis summary
provided by the Department online at: http://www.mass.gov/eea/agencies/massdep/recycle/approvals/solid-waste-
applications-and-forms.html#8. Note: the completed Comparative Analysis Summary will be submitted to the Department
electronically. Refer to the instructions in Section VII.
General Comments/Observations:
Facility waste ban compliance data is included from the period between December 1, 2021 and April 30, 2022.
Page 5 of 7
Third-Party Inspection Report(Waste Ban)
•
MassOEP Massachusetts Department of Environmental Protection
Bureau of Waste Prevention / Solid Waste Management
Third-Party Inspection Report-310 CMR 19.018(8)
Waste Ban Compliance
VI. Summary and Recommendations
Pursuant to 310 CMR 19.018(7)(c)4.where a third-party inspector observes that waste ban compliance at the facility deviates from the
applicable requirements set forth at 310 CMR 19.018(7)(c)1.,the third-party inspector shall document all such deviations and
recommend corrective actions for the facility to take to return to compliance.
A. INSPECTION RESULTS
Based on the examinations and evaluations conducted in Section V., please summarize the inspection results by checking one of the
following determinations:
® No deviations from the applicable waste ban compliance performance standards or additional requirements listed
at 310 CMR 19.018(7)were identified during this inspection.
If no deviations were identified during the inspection, check this box and proceed to Section VI.B.
O Deviations from the applicable waste ban compliance performance standards or additional requirements listed at
310 CMR 19.018(7)were identified during this inspection and are discussed further in this report.
If deviations were identified during the inspection, check this box and ensure that each deviation and the recommended
corrective actions are discussed in the applicable section(s)below.
B. STATUS OF PREVIOUS RECOMMENDATIONS FOR CORRECTIVE ACTION
If a previous waste ban compliance inspection report identified deviations with recommendations for corrective action, please describe
the action(s)taken since the last inspection to return the facility to compliance with the applicable requirements.
Discussion: N/A
C. RECOMMENDATIONS FOR CORRECTIVE ACTION
Based on the results of this inspection, please provide recommendations for corrective action to return to compliance, if necessary.
Recommendations: None
VII. Additional Information Checklist
Attach the following additional information, as applicable, to complete the inspection report.*
® Complete the Load Observation Table as required in Section V.B. and submit an electronic copy of the completed table to the
Department via email at:dep.swm@state.ma.us.
• Retain photographs and weigh slips for all failed loads identified during the inspection, as required in Section V.B. Do not submit
photographs or weigh slips with this inspection report; MassDEP may request such information to be submitted separately.
® Complete the Comparative Analysis as required in Section V.C. and submit an electronic copy of the completed analysis to the
Department via email at:dep.swm(a�state.ma.us.
*Note:Pursuant to 310 CMR 19.018(8), MassDEP may request additional information.
Continue to Certification Statement on Next Page►
Third-Party Inspection Report(Waste Ban) Page 6 of 7
MassOEP Massachusetts Department of Environmental Protection
Bureau of Waste Prevention / Solid Waste Management
Third-Party Inspection Report-310 CMR 19.018(8)
Waste Ban Compliance
VIII. Certification -THIRD-PARTY INSPECTOR
"I attest under the pains and penalty of perjury that:
1. I have personally examined and am familiar with the information Signature of Third-Party Inspector
contained in this submittal,including any and all documents Andrew Bushman
accompanying this certification statement and any and all electronic
data required to be submitted to the Department as part of this Print Full Name
third-party inspection report;
2. Based on my inquiry of those persons responsible for obtaining the Brown and Caldwell
information,the information contained in this submittal and such Company Name
documents and electronic data is,to the best of my knowledge,
true,accurate and complete; 06/13/2022
3. I have provided to the facility owner or operator the electronic data Date(MM/DD/YYYY)
(i.e.load observations and quarterly comparative analysis)required
in section VII;
4. I have been able to conduct the third-party inspection and prepare
the third-party inspection report without being influenced by the
facility owner or operator and, (if I am a municipal employee)
without being influenced by my municipal employer, by any
coworker or by any elected or appointed official of the municipality;
and
5. I am aware that there are significant penalties,including, but not
limited to,possible administrative and civil penalties for submitting
false,inaccurate,or incomplete information and possible fines and
imprisonment for knowingly submitting false,inaccurate,or
incomplete information."
IX. Certification - FACILITY OWNER/OPERATOR
"I certify under the penalty of law:
1. That I have personally examined and am familiar with the Signature of Responsible Official
information submitted in this document and all attachments,
including the electronic data(i.e.load observations and quarterly Thomas Stanwood
comparative analysis)required in section VII,and that,based on Print Full Name
my inquiry of those individuals immediately responsible for
obtaining the information,I believe that the information is true, Facility Manager
accurate and complete. I am aware that there are significant Title
penalties both civil and criminal for submitting false information
including possible fines and imprisonment. 06/13/2022
2. That,in the event that this inspection report contains a Date(MM/DD/YYYY)
recommendation for corrective action(s), I have completed and
attached to this report a Corrective Action Plan and Schedule*,
pursuant to 310 CMR 19.018(8)(c)2." Pursuant to 310 CMR 19.018(8)(c),a copy of each third-
party inspection report shall be maintained at the facility in
*Note:The owner or operator may elect to correct deviations identified in the accordance with the requirements of 310 CMR 19.000. The
Third-Party Inspection Report in a manner that is different than that owner and operator shall make third-party inspection reports
recommended by the Third-Party Inspector,so long as the facility is available to personnel or authorized representatives of the
brought back into compliance with applicable requirements. Department for review at the facility upon request.
Within 30 days of • Mail this completed form to the MassDEP A list of municipalities and MassDEP
the inspection Regional Office that serves the municipality in Regional Offices is available online at:
date: which the facility is located. http://www.mass.gov/eea/agencies/massdep/
(Attention: Solid Waste Management) about/contacts/find-the-massdep-regional-
office-for-you r-city-or-town.html
• Send one copy to the local board of health for the
municipality in which the facility is located.
Page 7 of 7
Third-Party Inspection Report(Waste Ban)