Loading...
HomeMy WebLinkAbout2022 06 10 Field Observation ReportARCHITECTS FIELD OBSERVATION REPORT 01 Report Date: June 10, 2022 Page 1 of 2 A R C H I T E C T U R E  I N T E R I O R S  P L A N N I N G 307 Washington Avenue Albany, New York 12206 USA T: 518•463•8066 F: 518•463•8610 Internet http://www.DDArch.com/ DEMBLING + DEMBLING A R C H I T E C T S , P.C. PROJECT Tom Lampron Cape Cod Inflatable Park Project Manager 518 Main Street Route 28 Aquatic Development Group West Yarmouth, MA 02673 13 Green Mountain Drive Cohoes, NY 12047 C: (518) 257-2067 Prepared By: Matt Ryan Visit Date: June 10, 2022 Contractor: Robert B. Our Co., Inc. Time: 9:15am - 11:15am Weather: Sunny, 72˚F Attendees: Matt Ryan, Dembling + Dembling Architects, P.C. Field notes and general observations: 1. Pump House: a. Construction ongoing. b. Building is framed and sheathed. Water-resistive barrier installation ongoing. c. Installation of asphalt roof shingles ongoing. 2. Restroom Building: a. Construction ongoing. Exterior finish work approximately 90% complete. b. Entry soffit and trimwork not yet installed. c. Changing area vinyl fencing not yet installed. d. Interior wall tile installed. Not yet grouted. Tile is applied to cement board with liquid membrane. e. Interior resinous flooring not yet installed. f. Toilet fixtures, accessories and toilet partitions not yet installed. ARCHITECTS FIELD OBSERVATION REPORT 01 Report Date: June 10, 2022 Page 2 of 2 A R C H I T E C T U R E  I N T E R I O R S  P L A N N I N G 307 Washington Avenue Albany, New York 12206 USA T: 518•463•8066 F: 518•463•8610 Internet http://www.DDArch.com/ DEMBLING + DEMBLING A R C H I T E C T S , P.C. g. Continuation of toilet room chase wall to underside of roof deck not completed. i. Contractor Action: Provide framing and gypsum wallboard from top of existing chase wall framing to underside of roof deck as specified. 3. Wave Building: a. Constuction ongoing. CMU wall construction approximately 40% complete. 4. Pool Bar: a. No construction started. This Field Observation Report represents a summary of the conditions noted at the project site by Dembling + Dembling Architects, P.C. on the date of the site visit. The site visit was performed to review general conformance of construction with the design concept of the project and general compliance with the information provided in the contract documents. END OF ARCHITECTS FIELD OBSERVATION REPORT 01 Copy to: File + Chron z:\data\wordnet\projects\2021-pjs\#21-008 cape cod inflatable park\reports\field observation report\2022 06 10.doc