Loading...
HomeMy WebLinkAboutReview Checklist TOWN OF YARMOUTH SEWAGE PLAN REVIEW CHECKLIST Location: A.M. ILot Zone of Contribution: In Out XAcreage_ 4,L(/ lin „J j�� Comme ---- Residential: x Street: �� bb «<///��' b Village: Floor Pl.a : n #Bedrooms: 3 Owner: Installer: 7 t k ips l k Address: Phone: Phone: / Builder' Engineer: �'Ve(4 el Address: Phone: Phone: N/A YES/.NO 1.Required# of copies received t 2. Date of soils exam and percolation test not older than 2 years 3. 4-5 ft of naturally occurring pervious material, above water table 4. Foundation 2 ft above high point of road H.P.: Fnd: Var_: v' 5. Water line 10 ft from septic components Var.: 6. Benchmark indicated and shown-NGVD if near wetlands 7. Septic tank minimum 10 ft from foundation, deck Var.: t 8. Leaching minimum 20 ft full, 15 ft crawl, 10 ft slab Var_: 9. Leaching minimum 100 ft from wetlands Var.: 10. Leaching minimum 150 ft from drinking well/25 ft irrigation well Var.: 11. Tank/leaching minimum 10 ft from property line Var.: i 12. System meets all other setback requirements Var.: ✓ 13. Uses adjustment for maximum high groundwater Var.: ✓r 14. Leaching set 4-5 ft above adj. water or bottom of test hole Var.: v 15. System not in top or subsoil(A,B horizons) or 5' removal 16. Proposed contours are suitable ✓/ 17. System meets slope requirements-min. 1/8", '/4"preferred ✓ 18. System meets breakout requirements PVC liner: Wall: V, 19. Specified tee sizes are proper, gas baffle on outlet tee // 20. Sewage is under 10,000 gpd for parcel a/ 21. No garbage disposal #c 22. System adequately sized for its intended use ,`/ 23. Minimum 6"stone or compacted below tank and dbox 24.Manhole covers within 6"of grade, pump chamber cover to grade ✓ ,- 25. Inspection port on plastic chambers/leach field 26. Electrical permit for pump chamber/Separate meter for duplexes 27.Pump system-2" line,weep hole,check valve, tee in dbox,pump size , 28. Septic tank/pump chamber to be factory waterproofed v 29. Vent provided if leaching below 3 feet, under driveway/parking 30. Buoyancy calculations for tank/pump chamber7 31. Engineer to inspect and certify soils: wall: commercial: 32. Engineer/Registered Sanitarian and Land Surveyor stamps/signature br . 33. 1-1-20 loading is subject to vehicular traffic, groundwater / 34. Title V Application and permit fee, installer signature 35. Foundation footing min. 2 feet above adjusted ground water for new house 36. Deed Restriction required max. #bedrooms: max. flow: gpd f 37. Check area lots for groundwater/Label groundwater in Assessor's Map Plan reviewed by: 11Jt41/� V 6/03/03