HomeMy WebLinkAboutReview Checklist TOWN OF YARMOUTH
SEWAGE PLAN REVIEW CHECKLIST
Location: A.M. Lot Zone of Contribution: 1n )(Out_ Acreage
Street: �� LC •
riCommercial: Residential:
Village: Floor Plan: V #Bedrooms:
Owner: Installer: Chide 'I ✓i'/erCNictit
Address: Phone:
Phone:
Builder' Engineer: CciV L ke/Y -tfq,9
Address: Phone:
Phone:
N/A YES NO
1.Required#of copies received V
2. Date of soils exam and percolation test not older than 2 years
l '-
3.4-5 ft of naturally occurring pervious material, above water table /. ,/
4.Foundation 2 ft above high point of road H.P.: Fnd: Var.: ✓
5. Water line 10 ft from septic components Var.: i/
6. Benchmark indicated and shown-NGVD if near wetlands
7. Septic tank minimum 10 ft from foundation, deck Var.:
8. Leaching minimum 20 ft full, 15 ft crawl, 10 ft slab Var.:
9.Leaching minimum 100 ft from wetlands Var.:
10. Leaching minimum 150 ft from drinking well/25 ft irrigation wellVar.:
w•--
11. Tank/leaching minimum 10 ft from property line Var.: 1.-----
12. System meets all other setback requirements Var.:
13. Uses adjustment for maximum high groundwater Var.: Y '
14. Leaching set 4-5 ft above adj. water or bottom of test hole Var.:
15. System not in top or subsoil(A,B horizons) or 5' removal �-----
16.Proposed contours are suitable
17. System meets slope requirements-min. 1/8", ''A"preferred
18. System meets breakout requirements PVC liner: Wall:
19. Specified tee sizes are proper, gas baffle on outlet tee s/
20. Sewage is under 10,000 gpd for parcel
21.No garbage disposal
22. System adequately sized for its intended use
23.Minimum 6"stone or compacted below tank and dbox i..----
24.
/24.Manhole covers within 6"of grade, pump chamber cover to grade t/
25. Inspection port on plastic chambers/leach field
26.Electrical permit for pump chamber/Separate meter for duplexes ;/-
27.Pump system-2" line,weep hole,check valve,tee in dbox,pump size
28. Septic tank/pump chamber to be factory waterproofed ,/`
29. Vent provided if leaching below 3 feet,under driveway/parking ✓
Buoyancy calculations for tank/pump chamber i.
tij Ent,'1 eer to ins sect and c- ' 00144► ..., soils: wall: commercial:
EngineerRegistered Sanitarian and Land Surveyor stamps/signature i/-
33. H-20 loading is subject to vehicular traffic, groundwater V
34. Title V Application and permit fee, installer signature ✓'
35. Foundation footing min. 2 feet above adjusted ground water for new house ►�
36. Deed Restriction required max. #bedrooms: max. flow: gpd
37. Check area lots for groundwater/Label groundwater in Assessor's Map I
Plan reviewed by: 11,117,
6ro3ro3