Loading...
HomeMy WebLinkAboutReview Checklist TOWN OF YARMOUTH SEWAGE PLAN REVIEW CHECKLIST Location: A.M. Lot Zone of Contribution: 1n )(Out_ Acreage Street: �� LC • riCommercial: Residential: Village: Floor Plan: V #Bedrooms: Owner: Installer: Chide 'I ✓i'/erCNictit Address: Phone: Phone: Builder' Engineer: CciV L ke/Y -tfq,9 Address: Phone: Phone: N/A YES NO 1.Required#of copies received V 2. Date of soils exam and percolation test not older than 2 years l '- 3.4-5 ft of naturally occurring pervious material, above water table /. ,/ 4.Foundation 2 ft above high point of road H.P.: Fnd: Var.: ✓ 5. Water line 10 ft from septic components Var.: i/ 6. Benchmark indicated and shown-NGVD if near wetlands 7. Septic tank minimum 10 ft from foundation, deck Var.: 8. Leaching minimum 20 ft full, 15 ft crawl, 10 ft slab Var.: 9.Leaching minimum 100 ft from wetlands Var.: 10. Leaching minimum 150 ft from drinking well/25 ft irrigation wellVar.: w•-- 11. Tank/leaching minimum 10 ft from property line Var.: 1.----- 12. System meets all other setback requirements Var.: 13. Uses adjustment for maximum high groundwater Var.: Y ' 14. Leaching set 4-5 ft above adj. water or bottom of test hole Var.: 15. System not in top or subsoil(A,B horizons) or 5' removal �----- 16.Proposed contours are suitable 17. System meets slope requirements-min. 1/8", ''A"preferred 18. System meets breakout requirements PVC liner: Wall: 19. Specified tee sizes are proper, gas baffle on outlet tee s/ 20. Sewage is under 10,000 gpd for parcel 21.No garbage disposal 22. System adequately sized for its intended use 23.Minimum 6"stone or compacted below tank and dbox i..---- 24. /24.Manhole covers within 6"of grade, pump chamber cover to grade t/ 25. Inspection port on plastic chambers/leach field 26.Electrical permit for pump chamber/Separate meter for duplexes ;/- 27.Pump system-2" line,weep hole,check valve,tee in dbox,pump size 28. Septic tank/pump chamber to be factory waterproofed ,/` 29. Vent provided if leaching below 3 feet,under driveway/parking ✓ Buoyancy calculations for tank/pump chamber i. tij Ent,'1 eer to ins sect and c- ' 00144► ..., soils: wall: commercial: EngineerRegistered Sanitarian and Land Surveyor stamps/signature i/- 33. H-20 loading is subject to vehicular traffic, groundwater V 34. Title V Application and permit fee, installer signature ✓' 35. Foundation footing min. 2 feet above adjusted ground water for new house ►� 36. Deed Restriction required max. #bedrooms: max. flow: gpd 37. Check area lots for groundwater/Label groundwater in Assessor's Map I Plan reviewed by: 11,117, 6ro3ro3