Loading...
HomeMy WebLinkAboutEngineer PlansCOVERS TO BE ATERRGHT AND SEPTIC SYSTEM PROFILE TOP OF FOUNDATION BROUGHT TO W THIN 6" OF FINAL GRADE (not to scale) EL. 58.0' EL. 56.0' INS] 2" of e" to I" DOUBLE WASHED El PEASTONE OR GEOTEXTILE 4" CAST IRON or EQUIVALENT m FILTER FABRIC MIN. PITCH 1/4" PER FOOT \ 4" SCHEDULE 40 PVC PIPE 4" SCHEDULE 40 PVC PIPE a FLOW LINE f ist P to be loyal) 8' 3.8% L 56.25' 1 I" o . EL. 53.75' EL, 53.5' —_ —_EL. 53.03' 00 15'(16.7%) E .5 2'o EL. 53.0' oo (H -20D -BOX) o G BAFFLE o :. 6" CRUSH D STONE OR j MECHANICALLY COMPACTED i (DATUM: ASSUMED) --� " to 11" DOUBLE WASHED S 1500 GALLON S PTIC TANK 4 2 PROPO ED Y 4 / 600, Permit valid fur REPAIR OF St'PTIC SYSTEM �. ONLY, due to Mate and Lora[ septic variaacm LOT 35 / Board of Health review and app »I is required for 0. ACRES± 4,- any future additionstrenovatu,.../aRerations to MA 17 LUT 62 l / Sewage facilities and/or structure...ducning. / \ 3 3Q BENCHMARK //DRIVEWAY TOP OF FNO EXISTING O' EL. 58.0' 3 BR � DWELLING Flaherty Environmental Services i P.O. Box 331 Harwich, MA 02645 774.994.9966 x'ut tiisn �i Qom-•( !�E<<�I rel L�1 L-] • � iL=J rJ � ■ SOIL ABSORPTION SYSTEM (2) 500 GALLON H-20 CHAMBERS WITH 4' STONE AROUND IN AN "ELL" CONFIGURATION (SEE PG. 2) BOTTOM OF TEST HOLE EL. 46.0' USGS ADJUSTMENT: N/A GROUNDWATER ELEV: N/A LEGEND -6— G G G GAS LINE 0.0 W y0 k, WATER LINE SHE SHE—BI& OVERHEAD UTIL 99 EXIST. CONTOURS — — — — - 99 PROP. CONTOURS ./I I , EXIST. FENCE TH-1 PROP, S,T 15.5 C 28, Yarmnnlb Health Dcp_u iment APPRON' l'.D APR 06 20ZO HEALTH DEPT. LOCAL UPGRADE APPROVAL: MAXIMUM FEASIBLE COMPLIANCE - 310 CMR 15.405(1)(b) SET BACK TO A FOUNDATION FROM 20' TO 18.5' LOCATIONMAP N TH m Silver Leaf Ln. y Levels Bay Rd. m NTS LOCUS _ NOF/rc. � 4I 1 vs 1 SCALE: 1" = 20' RFF Pe 58 PG 21 DATE: 3/30/2020 REVISED: awim SITE AND SEWAGE PLAN s ,+ FOR STO?4E B R B EXCAVATION, INC./ No 2 CHRISTOPHER KOKARAS IST 17 LEWXS BAY ROAD WEST YARMOUTH, MA .ry�D PAGE 1 OF 2