Loading...
HomeMy WebLinkAboutReview Checklst TOWN OF YARMOUTH SEWAGE PLAN REVIEW CHECKLIST X Location: A.M. Lot Zone of Contribution: In Out )(Acreage I 7 11 (AJ 00 _ / � I Commercial: Residential: }� Street: (� ;� r Village: Floor Plan: #Bedrooms: 5 Owner: Installer: --r- J7 Address: Phone: Phone: Builder: Engineer: rOkAA V 04c c • Address: Phone: Phone: N/A YES / NO 1. Required#of copies received ✓/ 2. Date of soils exam and percolation test not older than 2 years ✓ 3. 4-5 ft of naturally occurring pervious material, above water table / 4. Foundation 2 ft above high point of road H.P.: Fnd: Var.: ✓/ 5. Water line 10 ft from septic components Var.: e/ / 6. Benchmark indicated and shown-NGVD if near wetlands ✓/ 7. Septic tank minimum 10 ft from foundation,deck Var.: ✓ 8. Leaching minimum 20 ft full, 15 ft crawl, 10 ft slab Var.: 9. Leaching minimum 100 ft from wetlands Var.: 10. Leaching minimum 150 ft from drinking well/25 ft irrigation well Var.: V/✓ 11. Tank/leaching minimum 10 ft from property line Var.: 12. System meets all other setback requirements Var.: 7..id- , Uses adjustment for maximum high groundwater Var.: �/� ����14 Leaching set 4-5 ft above adj. water or bottom of test hole Var.: 1,i f /` ;;// Uu / . o. ipd 5. System not in top or subsoil(A,B horizons)or 5' removal / k 16. Proposed contours are suitable 17. System meets slope requirements-min. 1/8", '/"preferreds./ 18. System meets breakout requirements PVC liner: Wall: 19. Specified tee sizes are proper, gas baffle on outlet tee 6,- 20. /20. Sewage is under 10,000 gpd for parcel 21.No garbage disposal ✓ 22. System adequately sized for its intended use 23. Minimum 6"stone or compacted below tank and dbox 24.Manhole covers within 6"of grade,pump chamber cover to grade Inspection port on plastic chambers/leach field lectrical permit for pump chamber/Separate meter for duplexes x 27.Pump system-2"line,weep hole,check valve,tee in dbox,pump size ,✓ 28. Septic tank/pump chamber to be factory waterproofed 4, 29.Vent provided if leaching below 3 feet,under driveway/parking V- 30.Buoyancy calculations for tank/pump chamber 31. Engineer to inspect and certify soils: wall: commercial: 32. Engineer/Registered Sanitarian and Land Surveyor stamps/signature V20 loading is subject to vehicular traffic, groundwater ✓ itle V Application and permit fee,installer signature 0, X 35. Foundation footing min. 2 feet above adjusted ground water for new house 36.Deed Restriction required max. #bedrooms: max. flow: gpd 37. Check area lots for groundwater/Label groun ater in Assessor's Map Plan reviewed by: 6/03/03