HomeMy WebLinkAboutReview Checklst TOWN OF YARMOUTH
SEWAGE PLAN REVIEW CHECKLIST X
Location: A.M. Lot Zone of Contribution: In Out )(Acreage
I 7 11 (AJ 00 _ / � I Commercial: Residential: }�
Street: (� ;� r
Village: Floor Plan: #Bedrooms: 5
Owner: Installer: --r- J7
Address: Phone:
Phone:
Builder: Engineer: rOkAA V 04c
c •
Address: Phone:
Phone:
N/A YES / NO
1. Required#of copies received ✓/
2. Date of soils exam and percolation test not older than 2 years ✓
3. 4-5 ft of naturally occurring pervious material, above water table /
4. Foundation 2 ft above high point of road H.P.: Fnd: Var.: ✓/
5. Water line 10 ft from septic components Var.: e/ /
6. Benchmark indicated and shown-NGVD if near wetlands ✓/
7. Septic tank minimum 10 ft from foundation,deck Var.: ✓
8. Leaching minimum 20 ft full, 15 ft crawl, 10 ft slab Var.:
9. Leaching minimum 100 ft from wetlands Var.:
10. Leaching minimum 150 ft from drinking well/25 ft irrigation well Var.: V/✓
11. Tank/leaching minimum 10 ft from property line Var.:
12. System meets all other setback requirements Var.: 7..id-
,
Uses adjustment for maximum high groundwater Var.: �/� ����14 Leaching set 4-5 ft above adj. water or bottom of test hole Var.: 1,i f /` ;;// Uu / . o. ipd
5. System not in top or subsoil(A,B horizons)or 5' removal / k
16. Proposed contours are suitable
17. System meets slope requirements-min. 1/8", '/"preferreds./
18. System meets breakout requirements PVC liner: Wall:
19. Specified tee sizes are proper, gas baffle on outlet tee 6,-
20.
/20. Sewage is under 10,000 gpd for parcel
21.No garbage disposal ✓
22. System adequately sized for its intended use
23. Minimum 6"stone or compacted below tank and dbox
24.Manhole covers within 6"of grade,pump chamber cover to grade
Inspection port on plastic chambers/leach field
lectrical permit for pump chamber/Separate meter for duplexes x
27.Pump system-2"line,weep hole,check valve,tee in dbox,pump size ,✓
28. Septic tank/pump chamber to be factory waterproofed 4,
29.Vent provided if leaching below 3 feet,under driveway/parking V-
30.Buoyancy calculations for tank/pump chamber
31. Engineer to inspect and certify soils: wall: commercial:
32. Engineer/Registered Sanitarian and Land Surveyor stamps/signature
V20 loading is subject to vehicular traffic, groundwater ✓
itle V Application and permit fee,installer signature 0, X
35. Foundation footing min. 2 feet above adjusted ground water for new house
36.Deed Restriction required max. #bedrooms: max. flow: gpd
37. Check area lots for groundwater/Label groun ater in Assessor's Map
Plan reviewed by: 6/03/03