HomeMy WebLinkAboutEngineer PlanSLAB 8.1'
*8.2'
7.85'
A
2500 GAL
LS
10" SEPTIC TANK/..
SYSTEM PROFILE
j
COMBINATION
PROVIDE MIN. 20" DIA
(NOT TO SCALE)
M. WATERTIGHT
MARK CORNERS OF
LEACHING FIELD W/
PROVIDE INSPECTION PORTS TO ,>
�
ACCESS COVERS TO
IN 6" OF FIN. GRADE
REBAR SET 4" BELOW
WITHIN 3' OF FINISH GRADE
TOP FOUND. EL. 12.1'
B
GRADE
211 SLOPE
\
IO.O' MINIMUM .75',OF
COVER OVER PRECAST
FILTER FABRIC
10 4 TOP 9.62'
\
FINISHED GRADE- 4" LOAM &SEED OR PAVE AS REQ.
C
Sh
20
el
MS
- PRECAST H-10
RISERS (TPJ
2'0
6" MIN. SUMP 4"OSCH40 PVC
Nantucket
CLEAN FILL
SLAB 8.1'
*8.2'
7.85'
12 MIN. INT. DIM. PIPES LEVEL 1 ST 2
4 PERFOItAlEO PVC T 0.11 $=0.005 - °
E.. U
3/4"-1-1/2" DOUBLE WASHED
8" STONE LEACHING FIELD V61EPTH MIN BELOW INV.
WATERTEST D'BOX o '
°oma°$off°moo" FOR LEVELNESS 9.27' LEVEL BOTTOM 0
9.54' 1 1-
20.0
'- " o°oa000000a oa oa000000 00..
. oaoa000a00000ao 00000aoo oaoa000°oao aaaoo 8.6'
*THE INSTALLER SHALL VERIFY THE LOCATIONS OF ALL 1
UTILITIES AND ALL BUILDING SEWER OUTLETS AND ELEVATIONS E CRUSHED STONE OR MECHANICAL 5.0'
PRIOR TO INSTALLING ANY PORTION OF SEPTIC SYSTEM c MPACTION. (15.221 [21)
ADJUSTED GROUNDWATER 3.6' I
(_L.5_% SLOPE) SLOPE)
i
A
2500 GAL
LS
10" SEPTIC TANK/..
TEE PUMP CHAMBER
j
COMBINATION
SEE DETAIL BELOW
E
12 MIN. INT. DIM. PIPES LEVEL 1 ST 2
4 PERFOItAlEO PVC T 0.11 $=0.005 - °
E.. U
3/4"-1-1/2" DOUBLE WASHED
8" STONE LEACHING FIELD V61EPTH MIN BELOW INV.
WATERTEST D'BOX o '
°oma°$off°moo" FOR LEVELNESS 9.27' LEVEL BOTTOM 0
9.54' 1 1-
20.0
'- " o°oa000000a oa oa000000 00..
. oaoa000a00000ao 00000aoo oaoa000°oao aaaoo 8.6'
*THE INSTALLER SHALL VERIFY THE LOCATIONS OF ALL 1
UTILITIES AND ALL BUILDING SEWER OUTLETS AND ELEVATIONS E CRUSHED STONE OR MECHANICAL 5.0'
PRIOR TO INSTALLING ANY PORTION OF SEPTIC SYSTEM c MPACTION. (15.221 [21)
ADJUSTED GROUNDWATER 3.6' I
(_L.5_% SLOPE) SLOPE)
i
FOUNDATION- 14' SEPTIC TANK 15, D' BOX 12' LEACHING
; FACILITY LOCUS MAP
24"0 CAST IRON
ACCESS FOR ROUTINE MAINTENANCE VARIANCES REQUESTED UNDER TITLE 5 AND SCALE 1"=2000'±
MUST BE PROVIDED FOR ZABEL FILTER.
COVERS TO GRADE i 567 GAL RESER YARMOUTH HEALTH REGULATIONS
INSTALLER MUST FOLLOW ALL ASSESSORS MAP 25 PARCEL 311
PROVIDE QUIC DISCONNECT FOR PUMP REDUCTION IN GROUNDWATER ADJUSTMENT:
MANUFACTURER'S SPECIFICATIONS FOR USE OF THE NOV. ADJUSTMENT LOCUS IS WITHIN FEMA FLOOD ZONE AE (EL 11)
PROPER FILTER INSTALLATION BUOYANCY CALCS: :,' `f +' AS SHOWN ON COMMUNITY PANEL #25001CO589J
ALARM AND CONTROL PANEL H-10 2500 GAL. PC WEIGHS 24,000 LBS DATED 7/16/2014
AL BE INSTALLED INSIDE j 1.5' x 12 x 6.5 X 62,4 = 7,300 LBS UP (OK)
BUILDING. ALARM TO BE ON INV. IN 7.85' i-� N0 LOW POINTS NOTES DESIGN FLOOD ELEVATION 12.0 NAVD88
SEPARATE CIRCUIT FROM PUMP
ZABEL FILTER 2" PRESS RE LINE�--
1. DATUM IS NAVD aB�+ SUMMARY
FLOAT SWITCH ALARM ON (A1800) 19" TEE SLOPE TO RAIN BACK 9� / , ZONING SUMMAR 1
OUTLET TEE W/EXTENSION ) 2. MUNICIPAL WATER IS EXISTING
SETTINGS: 0.25" WEE. HOLES "A. % ZONING DISTRICT: R-25 DISTRICT
PUMP ON 6„ MIN. 1500 GAL CHECK VAL /1 a (8f 3. MINIMUM PIPE PITCH TO BE 1/8" PER FOOT. REQUIRED: EXISTING: PROPOSED:
5". WORKING RANGE THIS SIDE MYERS SRM 4 •\ 4. DESIGN LOADING FOR ALL PROPOSED PRECAST UNITS MIN. LOT SIZE 25,000 S.F. 7,880 S.F. 7,880 S.F.
OF BAFFLE -]Q
5„ SUBMERSIBLE 4/10 HP PUMP TO BE AASHO H
�J a MIN. LOT FRONTAGE 150 70.5 70.5'
PUMP OFF 12 SYSTEM (R EQUAL) A L�
_ .cLKTAr �g �•. �% 5. PIPE JOINTS TO BE MADE WATERTIGHT. MIN. FRONT SETBACK 30' 27.5' 30.4'
coo 00000 00 A - MIN. SIDE SETBACK 15' 15.0' 15.4'
000000 000c� oo a000 0 9 �` 1) �j 6. CONSTRUCTION DETAILS TO BE IN ACCORDANCE WITH
0 1L 310 CMR 15.000 (TITLE 5.) MIN. REAR SETBACK_ 20 _
6" BAFFLE 9.3% -
2500 GAL. SEPTIC TANK/ 70 - 0 <qb• • MAX. BUILDwG COVERAGE 25% 18.5%
PUMP CHAMBER COMBINATION 5 6r o
7. THIS PLAN IS FOR PROPOSED WORK ONLY AND NOT TO MAX. BUILDING HEIGHT 35'
BE USED FOR LOT UNE STAKING OR ANY OTHER
(NOT TO SCALE) i 7L 8 AR
S.F± 1r9 PURPOSE.
SYSTEM DESIGN:
TEST
C :r Fry '•\ 8. PIPE FOR SEPTIC SYSTEM TO SCH. 40-4" PVC. -
T HOLO LOGS 3 CV 9.COMPONENTS NOT TO BE BACKFILLED OR CONCEALED GARBAGE DISPOSER IS NOT ALLOWED
TES
L S a N C1 01 WITHOUT INSPECTION BY BOARD OF HEALTH AND
1 15. PERMISSION OBTAINED FROM BOARD OF HEALTH.
l DESIGN FLOW: 3 BEDROOMS 0 110 GPD = 330 GPD
ENGINEER: DANIEL E. GONSALVES, SE #13587 CO 1 � Q 10. CONTRACTOR SHALL BE RESPONSIBLE FOR CALLING USE A 330 GPD DESIGN FLOW
"L UUrS -`r E 13TING > "� DIGSAFE (1-888-344-7233) AND VERIFYING THE -
WITNESS: MALLORY LANG
LER CO 18. -.J LOCATION OF ALL UNDERGROUND & OVERHEAD UTILITIES
p n €NG o PRIOR TO COMMENCEMENT OF WORK. SEPTIC TANK: 330 GPD (2) = 660
DATE: 12/8/2020 o r FFLR= . j 4u D
Z 0 1 pR p ( cp 11. ANY UNSUITABLE MATERIAL ENCOUNTERED SHALL BE USE A 1500 GAL. SEPTIC TANK PUMP CHAMBER
PERC. RATE _ < 2 MIN/INCH h /
��� � // DWELLING � � � REMOVED BENEATH AND 5' AROUND THE PROPOSED I
o
TO F 12.1 , LEACHING FACILITY.
o LEACHING:
CLASS I SOILS yM a l0 LAB = 8a / AVEL
i O 12. EXISTING LEACHING FACWTY SHALL BE PUMPED AND
ELEV. ��'� �1
RIVEj 2 REMOVED. 330 GPD / (.74) 446 SF REQUIRED
n" 8.0' r I T DECK r8'0� O 13. FLOOD RESISTANT FOUNDATION DESIGN BY OTHERS, AS SHOWN - 456 SF OK
A
ro
LS
TOYR 3/2
3"
E
�
m
�
Y
IOYR 4/1
m
B
m' 0
LS
4
20"
1OYR 5/6
A
C
Sh
20
el
MS
Uth
Locus
Nantucket
96"
Sound
FOUNDATION- 14' SEPTIC TANK 15, D' BOX 12' LEACHING
; FACILITY LOCUS MAP
24"0 CAST IRON
ACCESS FOR ROUTINE MAINTENANCE VARIANCES REQUESTED UNDER TITLE 5 AND SCALE 1"=2000'±
MUST BE PROVIDED FOR ZABEL FILTER.
COVERS TO GRADE i 567 GAL RESER YARMOUTH HEALTH REGULATIONS
INSTALLER MUST FOLLOW ALL ASSESSORS MAP 25 PARCEL 311
PROVIDE QUIC DISCONNECT FOR PUMP REDUCTION IN GROUNDWATER ADJUSTMENT:
MANUFACTURER'S SPECIFICATIONS FOR USE OF THE NOV. ADJUSTMENT LOCUS IS WITHIN FEMA FLOOD ZONE AE (EL 11)
PROPER FILTER INSTALLATION BUOYANCY CALCS: :,' `f +' AS SHOWN ON COMMUNITY PANEL #25001CO589J
ALARM AND CONTROL PANEL H-10 2500 GAL. PC WEIGHS 24,000 LBS DATED 7/16/2014
AL BE INSTALLED INSIDE j 1.5' x 12 x 6.5 X 62,4 = 7,300 LBS UP (OK)
BUILDING. ALARM TO BE ON INV. IN 7.85' i-� N0 LOW POINTS NOTES DESIGN FLOOD ELEVATION 12.0 NAVD88
SEPARATE CIRCUIT FROM PUMP
ZABEL FILTER 2" PRESS RE LINE�--
1. DATUM IS NAVD aB�+ SUMMARY
FLOAT SWITCH ALARM ON (A1800) 19" TEE SLOPE TO RAIN BACK 9� / , ZONING SUMMAR 1
OUTLET TEE W/EXTENSION ) 2. MUNICIPAL WATER IS EXISTING
SETTINGS: 0.25" WEE. HOLES "A. % ZONING DISTRICT: R-25 DISTRICT
PUMP ON 6„ MIN. 1500 GAL CHECK VAL /1 a (8f 3. MINIMUM PIPE PITCH TO BE 1/8" PER FOOT. REQUIRED: EXISTING: PROPOSED:
5". WORKING RANGE THIS SIDE MYERS SRM 4 •\ 4. DESIGN LOADING FOR ALL PROPOSED PRECAST UNITS MIN. LOT SIZE 25,000 S.F. 7,880 S.F. 7,880 S.F.
OF BAFFLE -]Q
5„ SUBMERSIBLE 4/10 HP PUMP TO BE AASHO H
�J a MIN. LOT FRONTAGE 150 70.5 70.5'
PUMP OFF 12 SYSTEM (R EQUAL) A L�
_ .cLKTAr �g �•. �% 5. PIPE JOINTS TO BE MADE WATERTIGHT. MIN. FRONT SETBACK 30' 27.5' 30.4'
coo 00000 00 A - MIN. SIDE SETBACK 15' 15.0' 15.4'
000000 000c� oo a000 0 9 �` 1) �j 6. CONSTRUCTION DETAILS TO BE IN ACCORDANCE WITH
0 1L 310 CMR 15.000 (TITLE 5.) MIN. REAR SETBACK_ 20 _
6" BAFFLE 9.3% -
2500 GAL. SEPTIC TANK/ 70 - 0 <qb• • MAX. BUILDwG COVERAGE 25% 18.5%
PUMP CHAMBER COMBINATION 5 6r o
7. THIS PLAN IS FOR PROPOSED WORK ONLY AND NOT TO MAX. BUILDING HEIGHT 35'
BE USED FOR LOT UNE STAKING OR ANY OTHER
(NOT TO SCALE) i 7L 8 AR
S.F± 1r9 PURPOSE.
SYSTEM DESIGN:
TEST
C :r Fry '•\ 8. PIPE FOR SEPTIC SYSTEM TO SCH. 40-4" PVC. -
T HOLO LOGS 3 CV 9.COMPONENTS NOT TO BE BACKFILLED OR CONCEALED GARBAGE DISPOSER IS NOT ALLOWED
TES
L S a N C1 01 WITHOUT INSPECTION BY BOARD OF HEALTH AND
1 15. PERMISSION OBTAINED FROM BOARD OF HEALTH.
l DESIGN FLOW: 3 BEDROOMS 0 110 GPD = 330 GPD
ENGINEER: DANIEL E. GONSALVES, SE #13587 CO 1 � Q 10. CONTRACTOR SHALL BE RESPONSIBLE FOR CALLING USE A 330 GPD DESIGN FLOW
"L UUrS -`r E 13TING > "� DIGSAFE (1-888-344-7233) AND VERIFYING THE -
WITNESS: MALLORY LANG
LER CO 18. -.J LOCATION OF ALL UNDERGROUND & OVERHEAD UTILITIES
p n €NG o PRIOR TO COMMENCEMENT OF WORK. SEPTIC TANK: 330 GPD (2) = 660
DATE: 12/8/2020 o r FFLR= . j 4u D
Z 0 1 pR p ( cp 11. ANY UNSUITABLE MATERIAL ENCOUNTERED SHALL BE USE A 1500 GAL. SEPTIC TANK PUMP CHAMBER
PERC. RATE _ < 2 MIN/INCH h /
��� � // DWELLING � � � REMOVED BENEATH AND 5' AROUND THE PROPOSED I
o
TO F 12.1 , LEACHING FACILITY.
o LEACHING:
CLASS I SOILS yM a l0 LAB = 8a / AVEL
i O 12. EXISTING LEACHING FACWTY SHALL BE PUMPED AND
ELEV. ��'� �1
RIVEj 2 REMOVED. 330 GPD / (.74) 446 SF REQUIRED
n" 8.0' r I T DECK r8'0� O 13. FLOOD RESISTANT FOUNDATION DESIGN BY OTHERS, AS SHOWN - 456 SF OK
I
33.6',1
01
6.
1 t'�
N Q �� 0 ,
i ryti U '
SEPTIC DETAIL -
1'=20' >
G -W ADJ.DATA:
WELL: MIW 29
ZONE:
ADJ: 2.88''
NOV. 2020
GROUNDWATER ENCOUNTERED AT 70"
DCE #20-177
PATIO
110
Scale:1 "= 20'
0 10 20 3 40 50 FEE
�� 456 SF X .74 = 337 GPD OK
00sf 14. GUTTERS AND DOWNSPOUTS TO BE DIRECTED TO USE A PIPE AND STONE LEACHING FIELD AS SHOWN
ROP. DRYWELLS OR ROOF DRIP LINES TO STONE TRENCHES.
PORCH
DRIVE Ea15. ACCESS FOR ROUTINE MAINTENANCE MUST BE
pSLA O PROVIDED FOR ZABEL FILTER. INSTALLER MUST
BENCHMARK: FOLLOW MANUFACTURER'S SEPGFICATIONS FOR SITE PLAN
CEMENT BOUND PROPER FILTER INSTALLATION.
TH / = 8.3' NAVD88 OF
16. INSTALLER TO VERIFY THE ELECTRICAL SYSTEM IS
SUITABLE FOR PUMP CONNECTION. ELECTRICAL PERMIT
REQUIRED.
#31 PARKWOOD ROAD
> 0 PROVIDE $ OF 40 MIL LINE T 5' SOUTH YARMOUTH, MA
OFF SAS IN AREA SHOWN. TOP AT
PREPARED FOR
ELEV. 9.6', TTOM AT EL. 4.6 t
.DK JOHN SEVERINI
-
HOFh Y
qs�c�' �o=� oANtEL GNm DATE: JAN. 20, 2021
5' REMOVAL UN ABLE SOI REQUIRED .�% go DANIELA 5�N r, o A'
AROUND PERIM TER OF. LEACH[ FACILITY, (o G�FlI A 0JAL.A
DOWN TO SUITA I YER. REP"CE JIM CIVIL y 1 .� No. 409L0 I off 508-362-4541
WITH CLEAN MED. SAND, MEET 3 A No, 46502. � �0F c1� fax 508-362-9880
SPECIFICATIONS OF 310 CMR 15.255(3) - ^ p �� ST
ess� Op downcape.com
down cope engineering, Inc.
civil engineers
land surveyors
939 Main Street ( Rte 6A)
DATE DANIEL A. OJALA, P.E., P.L.S. YARMOUTHPORT MA 02675
20-177
A
LS
TOYR 3/2
3"
E
MS
12"
IOYR 4/1
7.0'
B
LS
20"
1OYR 5/6
6.3'
C
MS
2.5Y 6/4
96"
0_0'
I
33.6',1
01
6.
1 t'�
N Q �� 0 ,
i ryti U '
SEPTIC DETAIL -
1'=20' >
G -W ADJ.DATA:
WELL: MIW 29
ZONE:
ADJ: 2.88''
NOV. 2020
GROUNDWATER ENCOUNTERED AT 70"
DCE #20-177
PATIO
110
Scale:1 "= 20'
0 10 20 3 40 50 FEE
�� 456 SF X .74 = 337 GPD OK
00sf 14. GUTTERS AND DOWNSPOUTS TO BE DIRECTED TO USE A PIPE AND STONE LEACHING FIELD AS SHOWN
ROP. DRYWELLS OR ROOF DRIP LINES TO STONE TRENCHES.
PORCH
DRIVE Ea15. ACCESS FOR ROUTINE MAINTENANCE MUST BE
pSLA O PROVIDED FOR ZABEL FILTER. INSTALLER MUST
BENCHMARK: FOLLOW MANUFACTURER'S SEPGFICATIONS FOR SITE PLAN
CEMENT BOUND PROPER FILTER INSTALLATION.
TH / = 8.3' NAVD88 OF
16. INSTALLER TO VERIFY THE ELECTRICAL SYSTEM IS
SUITABLE FOR PUMP CONNECTION. ELECTRICAL PERMIT
REQUIRED.
#31 PARKWOOD ROAD
> 0 PROVIDE $ OF 40 MIL LINE T 5' SOUTH YARMOUTH, MA
OFF SAS IN AREA SHOWN. TOP AT
PREPARED FOR
ELEV. 9.6', TTOM AT EL. 4.6 t
.DK JOHN SEVERINI
-
HOFh Y
qs�c�' �o=� oANtEL GNm DATE: JAN. 20, 2021
5' REMOVAL UN ABLE SOI REQUIRED .�% go DANIELA 5�N r, o A'
AROUND PERIM TER OF. LEACH[ FACILITY, (o G�FlI A 0JAL.A
DOWN TO SUITA I YER. REP"CE JIM CIVIL y 1 .� No. 409L0 I off 508-362-4541
WITH CLEAN MED. SAND, MEET 3 A No, 46502. � �0F c1� fax 508-362-9880
SPECIFICATIONS OF 310 CMR 15.255(3) - ^ p �� ST
ess� Op downcape.com
down cope engineering, Inc.
civil engineers
land surveyors
939 Main Street ( Rte 6A)
DATE DANIEL A. OJALA, P.E., P.L.S. YARMOUTHPORT MA 02675
20-177