Loading...
HomeMy WebLinkAboutReview Checklist TOWN OF YARMOUTH SEWAGE PLAN REVIEW CHECKLIST Location: A.M. Lot 1 Zone of Contribution: In Out )( Acreage 2% h�� Commercial: Residential: Street: K7 4-a 12 Village: Floor Plan: #Bedrooms: 3 Owner: Installer: Pt 8 Address: Phone: Phone: '/ WA VIA Builder: Engineer: 3`V1 . /Y�'"` S Address: Phone: Phone: N/A YES NO 1. Required#of copies received ✓ ate of soils exam and percolation test not older than 2 years 4-5 ft of naturally occurring pervious material,above water table Will£ 7411 SS 1t4St4 tt V,- 4. L4. Foundation 2 ft above high point of road H.P.: Fnd: Var.: ✓ / 5. Water line 10 ft from septic components Var.: ✓ 6. Benchmark indicated and shown-NGVD if near wetlands 7. Septic tank minimum 10 ft from foundation, deck Var.: V 8. Leaching minimum 20 ft full, 15 ft crawl, 10 ft slab Var.: 9. Leaching minimum 100 ft from wetlands Var.: 10. Leaching minimum 150 ft from drinking well/25 ft irrigation well Var.: :>:,.., 11. Tank/leaching minimum 10 ft from property line Var.: ✓ 12. System meets all other setback requirements Var.: / 13.Uses adjustment for maximum high groundwater Var.: 14. Leaching set 4-5 ft above adj. water or bottom of test hole Var.: V: 15. System not in top or subsoil(A,B horizons)or 5' removal ✓/ 16.Proposed contours are suitable 17. System meets slope requirements-min. 1/8", '/"preferred ✓ / 18. System meets breakout requirements PVC liner: Wall: ✓� 19. Specified tee sizes are proper, gas baffle on outlet tee 20. Sewage is under 10,000 gpd for parcel Vx 21.No garbage disposal ✓ 22. System adequately sized for its intended use 23.Minimum 6"stone or compacted below tank and dbox it//:2 ‘ 24.Manhole covers within 6"of grade,pump chamber cover to grade 25. Inspection port on plastic chambers/leach field 26.Electrical permit for pump chamber/Separate meter for duplexes ,./j 27. Pump system-2"line,weep hole,check valve, tee in dbox,pump size 1/ 28. Septic tank/pump chamber to be factory waterproofed 29.Vent provided if leaching below 3 feet,under driveway/parking ✓/ 30. Buoyancy calculations for tank/pump chamber V / 31. Engineer to inspect and certify soils: wall: commercial: ✓/ 32. Engineer/Registered Sanitarian and Land Surveyor stamps/signature V 33.H-20 loading is subject to vehicular traffic, groundwater ✓ , 34. Title V Application and permit fee, installer signature / 35.Foundation footing min. 2 feet above adjusted ground water for new house ✓ 36.Deed Restriction required max. #bedrooms: max. flow: gpd v" / 37. Check area lots for groundwater/Lab-1 ',10 r dwater in Asses'or's Map ✓ Plan reviewed by: 6/03/03