HomeMy WebLinkAboutReview Checklist TOWN OF YARMOUTH
SEWAGE PLAN REVIEW CHECKLIST
Location: A.M. I 1 O Lot (94 Zone of Contribution: In /Out_ Acreage 3 t' 4 t"' +
Commercial: Residential: 4-----
Street: /S 4 17 ,4&•C c S 4.4- 1
Village: T�-1 Floor Plan: #Bedrooms: ii
Owner: 77.4--a P S‘"4--) Installer: 4:"-z.,-0--
Address:
"-z.-0Address: Phone:
Phone:
Builder: Engineer: 3-C
Address: Phone:
Phone:
N/A YES NO
1.Required#of copies received
2. Date of soils exam and percolation test not older than 2 years ✓,
3.4-5 ft of naturally occurring pervious material,above water table ✓ V
4.Foundation 2 ft above high point of road H.P.: Fnd: Var.:
5.Water line 10 ft from septic components Var.: V
6.Benchmark indicated and shown-NGVD if near wetlands t7
7. Septic tank minimum 10 ft from foundation, deck Var.: _ ,l
8.Leaching minimum 20 ft full, 15 ft crawl, 10 ft slab Var.: g.1 ✓
9.Leaching minimum 100 ft from wetlands Var.: V
10.Leaching minimum 150 ft from drinking well/25 ft irrigation well Var.:
11.Tank/leaching minimum 10 ft from property line Var.: V
12. System meets all other setback requirements Var.: V
13.Uses adjustment for maximum high groundwater Var.: k-a V-
14.
14. Leaching set 4-5 ft above adj. water or bottom of test hole Var.: V
15. System not in top or subsoil(A,B horizons)or 5' removal 1/-
16.
16. Proposed contours are suitable ✓
17. System meets slope requirements-min. 1/8", '4"preferred V
18. System meets breakout requirements PVC liner: Wall: t/
19. Specified tee sizes are proper, gas baffle on outlet tee /
20. Sewage is under 10,000 gpd for parcel
21.No garbage disposal i/
22. System adequately sized for its intended use V
23.Minimum 6"stone or compacted below tank and dbox V _
24.Manhole covers within 6"of grade,pump chamber cover to grade V
25. Inspection port on plastic chambers/leach field V
26.Electrical permit for pump chamber/Separate meter for duplexes ✓
27.Pump system-2"line,weep hole,check valve,tee in dbox,pump size ✓
28. Septic tank/pump chamber to be factory waterproofed ✓
29. Vent provided if leaching below 3 feet,under driveway/parking
30.Buoyancy calculations for tank/pump chamber V
31. Engineer to inspect and certify soils: wall: commercial: ✓
32. Engineer/Registered Sanitarian and Land Surveyor stamps/signature V
33.H-20 loading is subject to vehicular traffic, groundwater ./
34.Title V Application and permit fee,installer signature ✓
35.Foundation footing min.2 feet above adjusted ground water for new house /
36.Deed Restriction required max. #bedrooms: max. flow: gpd /
37. Check area lots for groundwater/Label groundwater in Assessor's Map
Plan reviewed by:.___c 4 n 'fid 21- 603 01