Loading...
HomeMy WebLinkAboutReView Checklist TOWN OF YARMOUTH 21 '' 1 2 SEWAGE PLAN REVIEW CHECKLIST Location: A.M. I Z 4 Lot 118 Zone of Contribution: In Out /Acreage tt:3` 4)'F Commercial: Residential: ke- Street: 19 P -4 P fk"4-- �`t� Village: `i'.lc71} P� Floor Plan: b. #Bedrooms: 3 Owner:I JI'k At I U *_/CJ v'b A c eTa u Installer: "V-5 c. Address: Phone: SPEt. 4'11 5-11 Phone: Q i i S7ci e>12-8 Builder: Engineer: %.,1-C = tb.) =e==4..0 Cr q Address: Phone: 62) 23 7 03/1 Phone: N/A YES NO 1.Required#of copies received v/ 2. Date of soils exam and percolation test not older than 2 years r,/ 3. 4-5 ft of naturally occurring pervious material, above water table 4.Foundation 2 ft above high point of road H.P.: Fnd: Var.: 1/ 5. Water line 10 ft from septic components Var.: a/ 6. Benchmark indicated and shown-NGVD if near wetlands i/ 7. Septic tank minimum 10 ft from foundation, deck Var.: &XI 457 8. Leaching minimum 20 ft full, 15 ft crawl, 10 ft slab Var.: 9. Leaching minimum 100 ft from wetlands Var.: V 10. Leaching minimum 150 ft from drinking well/25 ft irrigation well Var.: ✓ 11. Tank/leaching minimum 10 ft from property line Var.: ,/ 12. System meets all other setback requirements Var.: V 13. Uses adjustment for maximum high groundwater Var.: V 14. Leaching set 4-5 ft above adj. water or bottom of test hole Var.: ✓ 15. System not in top or subsoil (A,B horizons) or 5' removal ,/ 16.Proposed contours are suitable ,/ 17. System meets slope requirements-min. 1/8", '/"preferred ,i/ 18. System meets breakout requirements PVC liner: Wall: ,/ 19. Specified tee sizes are proper, gas baffle on outlet tee 20. Sewage is under 10,000 gpd for parcel ✓ 21.No garbage disposal i 22. System adequately sized for its intended use ,/ 23.Minimum 6" stone or compacted below tank and dbox ../ 24.Manhole covers within 6"of grade,pump chamber cover to grade V 25. Inspection port on plastic chambers/leach field r/ '26. Electrical permit for pump chamber/Separate meter for duplexes / 27.Pump system-2"line,weep hole,check valve,tee in dbox,pump size ,28. Septic tank/pump chamber to be factory waterproofed ,/i 29. Vent provided if leaching below 3 feet,under driveway/parking I 30. Buoyancy calculations for tank/pump chamber 31. Engineer to inspect and certify soils: wall: commercial: t/ 32.Engineer/Registered Sanitarian and Land Surveyor stamps/signature 33. H-20 loading is subject to vehicular traffic, groundwater I 34.Title V Application and permit fee,installer signature ` / 35.Foundation footing min. 2 feet above adjusted ground water for new house J / 36. Deed Restriction required max. #bedrooms: max. flow: 332 gpd / 37. Check area lots for groundwater/Label groundwater in Assessor's Map ✓ Plan reviewed by: a 71'S1.--) A-. t' . 6/03/03 /N