Loading...
HomeMy WebLinkAboutReview Checklist & Correspondence TOWN OF YARMOUTH SEWAGE PLAN REVIEW CHECKLIST k Location: A.M. Lot Zone of Contribution: In Out / 'Acreage Street: 2Z2 Pfuni keh it tk)Vt t� Dr Commercial: Residential: ,� Village: Floor Plan: #Bedrooms:if S4' I @ LI, 4,,,,,,,../,,„ Owner: Installer: �i l C__. Address: Phone: Phone: Builder: Engineer: /(V.L Address: Phone: Phone: N/A YES / NO 1.Required#of copies received t. 2.Date of soils exam and percolation test not older than 2 years V 3.4-5 ft of naturally occurring pervious material, above water table r/ . 4. Foundation 2 ft above high point of road H.P.: Fnd: Var.: V.-- 5. 5.Water line 10 ft from septic components Var.: 6. Benchmark indicated and shown-NGVD if near wetlands 7. Septic tank minimum 10 ft from foundation, deck Var.: 1/ 8. Leaching minimum 20 ft full, 15 ft crawl, 10 ft slab Var.: 9.Leaching minimum 100 ft from wetlands Var.: 10.Leaching minimum 150 ft from drinking well/25 ft irrigation well Var.: 1/- 11.Tank/leaching minimum 10 ft from property line Var.: ✓ 12. System meets all other setback requirements Var.: f 13.Uses adjustment for maximum high groundwater Var.: ✓ 14. Leaching set 4-5 ft above adj. water or bottom of test hole Var.: ✓ 15. System not in top or subsoil(A,B horizons)or 5' removal 16.Proposed contours are suitable ✓ 17. System meets slope requirements-min. 1/8", %"preferred 18. System meets breakout requirements PVC liner: Wall: ,/ 19. Specified tee sizes are proper, gas baffle on outlet tee i/- 20. 20. Sewage is under 10,000 gpd for parcel 21.No garbage disposal 22. System adequately sized for its intended use �✓ 23.Minimum 6"stone or compacted below tank and dbox 24. Manhole covers within 6"of grade,pump chamber cover to grade Inspection port on plastic chambers/leach field 26 lectrical permit for pump chamber/Separate meter for duplexes K 27. Pump system-2"line,weep hole,check valve,tee in dbox,pump size t 28. Septic tank/pump chamber to be factory waterproofed • Vent provided if leaching below 3 feet,under u 1C driveway/park'n c/ 0:uoyancy calculations for tank/pump chamber yl l / . Engineer to inspect and certify soils: wall: ✓commercial: ✓/ 32. Engineer/Registered Sanitarian and Land Surveyor stamps/signature ✓ 33. H-20 loading is subject to vehicular traffic, groundwater V 34. Title V Application and permit fee, installer signature / 35. Foundation footing min. 2 feet above adjusted ground water for new house ✓f 36. Deed Restriction required max. #bedrooms: max. flow: gpd ,/ / 37. Check area lots for groundwater/Label . nd at; ' Assessor's Map Plan reviewed by: f 6/03/03 Langler, Mallory From: Mike Aucoin <allcapeseptic@gmail.com> Sent: Wednesday, May 5, 2021 4:58 PM To: Langler, Mallory Subject: Fwd: 222 Pawkannawkut Dr This email originates outside of the organization. Do not open attachments or click links unless you are sure this email is from a known sender and you know the content is safe. Call the sender to verify if unsure. Otherwise delete this email. Alright, here goes: H-20 1500 GST Downward- 10.0' x 5.17' x 4.0' = 207 cubic feet x 62.4 lbs/cubic foot = 12,917 lbs water Tank weight = 12,500 lbs Total weight = 25,417 lbs Upward- 11.0' x 6.17' x 2.6' = 176.5 cubic feet x 62.4 lbs/cubic foot = 11,014 lbs OK H-20 1000 GST Downward- 8.0' x 4.25' x 2.0' = 68 cubic feet x 62.4 lbs/cubic foot = 4,243 lbs water Tank weight = 8,600 lbs Total weight = 12,843 lbs Upward- 9.0' x 5.3' x 2.0' = 95.4 cubic feet x 62.4 lbs/cubic foot 5,953 lbs OK Good luck! David D. Flaherty Jr., RS, REHS Flaherty Environmental Services P.O. Box 331 Harwich, MA 02645 Original Message From: "Langler, Mallory" < mlangler(c yarmouth.ma.us> To: "'DAVID D. FLAHERTY JR."'<flaherty822(acomcast.net> Date: 05/03/2021 9:44 AM Subject: 222 Pawkannawkut Dr Hey Dave, 1