HomeMy WebLinkAboutEngineer PlanSITE
ct
to
0 1 �l
ROUTE z8
pJ~�Q
G5
F_
LOCUS
SCALE 1"=500'
TP-
0"
20"
m
Z 24„
72"
HTM
A
LOAMY SAND
10YR 3/2
B
LOAMY FINE
SAND
10YR 4/6
C
FINE SAND
2.5Y 6/4
PERC ® 54"
99.37
97.70
97.37
2" SCH 40 PVC
ADJ.=93.97 MANIFOLD
0.60' 2" SCH 40 PVC
OBS.=93.37 FORCEMAIN FROM
PUMP CHAMBER
t
EXISTING
DWELLING
RISERS
RISERS TO BE BROUGHT ✓
TO GRADE
9" MIN. COVER
36" MAX. COVER
-' -
BRING
20' OF 4" SCH 40
1500 GALLON
500 GALLON
OF GRADE
PVC, S=0.020 MIN.
SECTI
99.76 X
INV .=97.27
/
10" °/110"
T
NOT TO SCALE
EXISTING
14
1
INV.=96.62
PRESSURE DISTRIBUTION DETAIL
INV.=96.87
Z w
CHIMNEY
AGM
SRM4 4/10
P� P OR APPRO EDHEQUAL
/
(H20) `�
INV.=92.12
PROFILE
INSTALL ZABEL A1800
EFFLUENT FILTER
(WATERPROOFED)
LEVEL STABLE BASE
CONSISTING OF 6"
Z
CRUSHED STONE
PROPOSED 2.000 GAL
2 -COMPARTMENT
LOW
PROFILE CONCRETE SEPTIC TANK / PUMP CHAMBER
a
(SHOREY ITEM #
STPC202LP30)
1 1/2" SCH 40 qVC wi
WITH 1/4" PERFO ATIONS IN THE o�
TOP OF THE PIPE; (SPACING SHOWN)
1
�I
OI
�I
3 3' 3' 3'
i -1/4" ORIFICE WITH ORENCO
ORIFICE SHIELD
1-1/2" PIPE TO BE RUN LEVEL
THREADED
END CAP
45' BEND
MAXIMUM
vww imma0l,
j MIN. COVER 9" (TYP.)
v v o v. o v 28' OF 1-1/2" PERF. SCH 40 PVC S=0.000
v
E v v o ° ° (SEE PRESSURE DISTRIBUTION DETAIL) vv v v v v v v
v v o 0
3/4"-1 1/2" DOUBLE WASHED STONE
5' 30' LONG BY 10' WIDE LEACHING BED
8 oz. NON WOVEN GEOTEXTILE FABRIC
MINIMUM ELEV.-99.50
5'
"LIMIT OF EXCAVATION - SOIL REMOVAL TO BE TO APPROXIMATE ELEVATION 96.03
-----------------------------------------
SYSTEM PROFILE
NOT TO SCALE
INSTALL
RISERS
TO
BRING
COVERS TO
WITHIN
6"
OF GRADE
2" THREADED UNION
2" BALL VALVE
STAINLESS STEEL LIFTING
CHAIN OR CABLE
z }" WEEP HOLE
(343 GALLONS) cwa a�
u O
M N 2" CHECK VALE
w
ALARM ON EL.=94.07 2" SCH 40 PVC RISER PIPE
4"
91" 91.78
�-�
EXISTING OVERHEAD UTILITIES
- '�
EXISTING WATER LINE
j
FIELD
1 M
TP -1
CROSS
SECTI
99.76 X
PUMP ON EL.=93.74
'if valid for t<f1',iv of SEPTIC SYS[=FM
EXISTING FIRE HYDRANT
NOT TO SCALE
EXISTING UTILITY POLE
ONLY{,: tl"e t" state. aw; I oval Septic variances.
EXISTING WATER GATE BOX
PRESSURE DISTRIBUTION DETAIL
BULKHEAD
Z w
CHIMNEY
AGM
SRM4 4/10
P� P OR APPRO EDHEQUAL
SOIL
PROPOSED INSPECTION PORT
PROFILE
7"
Z
NO TO SCALE
a
DATE: FEBRUARY 19, 2020
PUMP OFF EL.=93.12
PERFORMED BY: RICK JUDO
li
WITNESSED BY: MALLORY LANGLER
STANDING GW: 72"
.tHOFYUM4s !
6"
PERC RAT :<2 MIN./IN.
- i
INDEX WELL MIW29
of
�L1L
BOTTOM OF CHAMBER ELEV.=92.62
1/27/20 READING = 6.32
�� 1H y 6 p
y°Nm
U S S
m
ADJUSTMENT = 0.60
9 J.
4 0.35044
�, y
'
PUMP
CHAMBER
DETAIL
N/F
No.azsss
�oFesseoy p
N�SURv� N/F
MARGARET BALLARD
2-
JOHN B MTCHELL
NOT TO SCALE
12 ARCHIE ROAD ,c oIsTER ?
MAP 39, PARCEL 174 FSS/ONA- ENG\ 23 AMOS ROAD
PROPOSED 10' X 30' MAP 39, PARCEL 172
(( `� PIPE IN STONE LEACH FIELD
98.2 l (PRESSURE DISTRIBUTION)
PROPOSED 2',',000 GALLON LOW PROFILE
SEPTIC TANK'' PUMP CHAMBER
LIMIT OF OERDIG COM13INATIONI 1500 GALLON TANK,
500 GALLON PUMP CHAMBER (H20)
LIMIT OF STONE z - - EXISTING
o-- FENCE /
^ N 80'2753" W 100.
001,ORIFICE I / /
LOCATION t70,t \ zw TP-' LOT 33
u 99.37 /
(TYP.)
~ `I 6,594 SQ.FT.± 99.
INSPECTION 1 ° _ - I x 100.06
PORT + I 0.15 ACRES±
_ 1
APPROXIMATE LOCATION 99,22 _
OF EXISTING TANK - J
TO BE REMOVED APPROXIMATE LOCATION
r
N/F
� 112.91 CF WATER SERVICE
JULIE A MOWRY - 170 MIN i, ��'/ �!%�r� / i�.;. 100.48 �r
8 ARCHIE ROAD 98.21 98.69 1 0
MAP 39, PARCEL 175 J o1 IP x 1 Q f% �; W t
o g i �' /�i W t.
EXISTING !� '4't24.9' 0 1
FENCE MIN, t
APPROXIMATE LOCATION ' C.0 N I 1Q1,13 rl
OF EXISTING LEACH
FIELD - TO BE
i REMOVED
.S70,
c, o j �j w
to Jo.o' o w
98.34
f
10'
MLN, APPROXIMATE LOCATION o^ r'
.
wEy
a 98. \ ; , �i,� , „j OF GAS SERVICE .., wl
Z 0 Vf ;,�. ��/ 100.28 o u
o W N CLEANOUT GM G G j:--) W
z (TYP.)
I +
ORANGEBURG PIPE ENCOUNTER-.._ / U
I n z JUST OUTSIDE THE UMIT,S OF THE 100.07
DWELLING. SEWER UNE SHALL BE f
98.76 SLAB
DUG /BACK UNDER"`-
` k FOUNDATION TO CAST IRON OR FX1c
J , ItJG p
N F RE -PLUMBED AROUND PORCH D DRIV F
ARCHIE ROAD .`_ - _t -__SWAY -_.,_ ,._... 100.50
RO
REALTY TRUST - �'7 r
P {/
MAP 3RCPARCELD176 N 80'2TS3., W ERTY
TYP. I _x 95 O0
__ \\
x 100.25
I 100.52
BENCHMARK x 100,04
TOP OF FULL FOUNDATION - -
ELEVATION=101.25 (ASSUMED) 1"
NEIL A &JUDIUDITH F SACKS
41 MCGEE STREET \ 1
MAP 39, PARCEL 170
F
FRONT
FLOOR PLAN
NOT TO SCALE
THREADED
F -END CAP
DETAIL
NOT TO SCALE
ELEV.=97.97
SEASONAL HIGH GROUNDWATER
SITE INFORMATION
ADDRESS: 45 MCGEE STREET, WEST YARMOUTH
MAP T: 39/171
DEED REFERENCE: 23767/0224
GENERAL NOTES:
1. THE SUBJECT PROPERTY IS WITHIN A FEMA ZONE X AS SHOWN ON PANEL NO. 25001CO588J„ EFFECTIVE
DATE JULY 16, 2014.
2. THE SITE NOT IS LOCATED WITHIN A ZONE II AREA.
3. THERE ARE NO STREAMS OR WETLANDS WITHIN 100 -FE
DISPOSAL SYSTEM.
4. VERTICAL DATUM IS ASSUMED
5. ALL CONSTRUCTION MEANS AND METHODS SHALL CONFORM TO 310 CMR 15.00 STATE REGULATIONS AND
LOCAL BOARD OF HEALTH AND BUILDING DEPARTMENT REGULATIONS.
6. ALL JOINTS IN THE TANK/PUMP CHAMBER AND DISTRIBUTION BOX SHALL BE MADE WATERTIGHT THROUGH
THE USE OF ASPHALT OR SYNTHETIC POLYMER SEALERS OR HYDRAULIC CEMENT.
7. DIGSAFE AND LOCAL UTILITY COMPANIES SHALL BE CONTACTED PRIOR TO ANY EXCAVATION OCCURRING.
8. LOCATION OF UTILITIES ON THIS PLAN ARE APPROXIMATE AND SHALL BE VERIFIED IN THE FIELD. THE
ELEVATIONS OF ALL EXISTING SEWER INVERTS SHALL BE VERIFIED PRIOR TO THE INSTALL OF ANY
SYSTEM COMPONENTS. ANY DISCREPANCIES SHALL BE REPORTED TO THE DESIGN ENGINEER IMMEDIATELY
9. THE SEPTIC SYSTEM INSTALLER SHALL NOTIFY THE DESIGN ENGINEER 2 DAYS PRIOR TO BEGINNING
INSTALLATION OF THE SYSTEM TO ALLOW FOR SCHEDULING OF INSPECTIONS
10. WHERE APPLICABLE, UNSUITABLE MATERIAL (A & B HORIZONS) ENCOUNTERED BELOW THE INVERT OF
THE INLET TO THE SOIL ABSORPTION SYSTEM, SHALL BE REMOVED TO A DISTANCE 5' AROUND THE
SYSTEM AND BROUGHT BACK TO THE APPROPRIATE ELEVATION WITH CLEAN SAND PER MASSACHUSETTS
310 CMR 15.00 REGULATIONS.
I
11. THIS DESIGN DOES NOT ALLOW FOR THE USE OF A GARBAGE GRINDER
12. EXISTING CONDITIONS SURVEY PERFORMED BY PAUL E. SWEETSER, PLS, APRIL 2019
13. USE GROUNDWATER WATER ADJUSTMENT OF 0.61' PER YARMOUTH HEALTH DEPARTMENT APPROVAL
DEED RESTRICTION
IN ACCORDANCE WITH 310 CMR 15.240 (5), THIS SYSTEM REQUIRES A DEED RESTRICTION LIMITINGI THE
DWELLING TO 2 BEDROOMS. IT IS REQUIRED THAT THIS DEED RESTRICTION BE RECORDED WITH THE
BARNSTABLE COUNTY REGISTRY OF DEEDS.
DESIGN CALCULCATIONS
DESIGN FLOW
110 GALLONS/DAY/BEDROOM X 2 BEDROOMS = 220 GALLONS/DAY
TANK CAPACITY
220 GPD X 200% = 440 GALLONS
USE 2,000 GALLON TWO-COMPARTMENT TANK FOR TANK AND PUMP CHAMBER
REQUIRED LEACHING CAPACITY
DESIGN PERC RATE = < 2 MIN/INCH
220 GPD / 0.74 GALLONS PER DAY PER SO. FT. = 297.30 SQ. FT. ---
PROVIDED LEACHING CAPACITY~
BOTTOM AREA = 10.0' X 30.0' = 300.00 SQ. FT./ (222 GPD) ,/
PUMP NOTES
1. USE MYERS MODEL SRM4 4/10 HP PUMP OR APPROVED EQUAL
2. BOTH VISUAL AND AUDIO (AUDIBLE AND LIGHT) ALARMS ARE TO BE LOCATED WITHIN THE DWELLING AND
BE POWERED BY A SEPARATE CIRCUIT FROM THE PUMPS
3. ELECTRIC JUNCTION BOX SHALL BE EXPLOSION PROOF NEMA 4X AND SHALL BE LOCATED OU IDE THE
PUMP CHAMBER IN A SEPARATE STRUCTURE. ALL ELECTRICAL CONNECTIONS SHALL BE LOCA D
OUTSIDE THE PUMP CHAMBER
4. PUMP SHALL BE INSTALLED IN CONFORMANCE WITH MANUFACTURERS SPECIFICATIONS AND TI 5
REGULATIONS.
5. THE PUMP SHALL BE ABLE TO BE REMOVED FROM THE PUMP CHAMBER WITHOUT ENTERING E
STRUCTURE
I
6. THRUST BLOCKS SHALL BE INSTALLED AT ALL BENDS IN THE FORCEMAIN
7. AN ELECTRICAL PERMIT IS REQUIRED FOR THE INSTALLATION OF THIS SYSTEM
PUMP CHAMBER VOLUMES
1. PUMP CHAMBER VOLUME = 134.6 GALLONS PER FOOT OF HEIGHT
I
2. VOLUME DOSED PER PUMPING CYCLE = 84 GALLONS OR 0.62' (7.5") (10 GALLONS DRAIN ACK)
3. EMERGENCY STORAGE = 220 GALLONS OR 2.50' (20")
BOUANCY CALCULATIONS
2,000 GALLON L.P. SEPTIC TANK/PUMP CHAMBER (H-20)
BOTTOM OF TANK = 92.12
ADJUSTED HIGH GROUNDWATER ELEVATION = 93.97
1.85'
VOLUME BELOW WATER = 13' X 7' X 1.85' = 168.35 C.F.
163.85 C.F. X 62.4 LBS/C.F. = 10,505 LBS UPLIFT
WEIGHT OF EMPTY S.T. / P.C. = 33,500 LBS DOWNFORCE
8 oz. NON WOVEN GEOTEXTILE FABRIC
1-1/2" PERFORATED SCH 40 PVC PIPE
9" MIN. EARTH
EARTH BACKFILL -, BACKFILL
=fir8" DEPTH OF 3/4" TO
1-1/2" DOUBLE WASHED
z ,> CRUSHED STONE
3'-0" 4'-0"
Witir4 of 11, aIth revive+ a,ni .,1,prnval is required for
ally fµ,11", addnwn0' rt vatiuntldtterattnns
sewage favitn,re mid/or sir =.luxes/dwelling, -
Ai'i`lit�1'F:1)
` jlzl �-2cr2
LEGEND
PROPERTY LINE
---------10'. --- EXISTING CONTOUR
- -104 PROPOSED CONTOUR
10'-0"
EXISTING OVERHEAD UTILITIES
W
EXISTING WATER LINE
j
FIELD
1 M
TP -1
CROSS
SECTI
99.76 X
EXISTING SPOT ELEVATION
'if valid for t<f1',iv of SEPTIC SYS[=FM
EXISTING FIRE HYDRANT
NOT TO SCALE
EXISTING UTILITY POLE
ONLY{,: tl"e t" state. aw; I oval Septic variances.
Witir4 of 11, aIth revive+ a,ni .,1,prnval is required for
ally fµ,11", addnwn0' rt vatiuntldtterattnns
sewage favitn,re mid/or sir =.luxes/dwelling, -
Ai'i`lit�1'F:1)
` jlzl �-2cr2
LEGEND
PROPERTY LINE
---------10'. --- EXISTING CONTOUR
- -104 PROPOSED CONTOUR
1�-EiE1S-RPdG-fENe
EXISTING OVERHEAD UTILITIES
W
EXISTING WATER LINE
G
- EXISTING NATURAL GAS LINE
1 M
TP -1
LOCATION OF TEST
PIT/PERC TEST
99.76 X
EXISTING SPOT ELEVATION
(QFH
EXISTING FIRE HYDRANT
-0-
EXISTING UTILITY POLE
0 WG
EXISTING WATER GATE BOX
BH
BULKHEAD
CH
CHIMNEY
AGM
EXISTING GAS METER
• Ip
PROPOSED INSPECTION PORT
IN HOUSE VARIANCES REQUESTED:
310 CMR 15.212 (1) - DEPTH TO GROUNDWATER - MINIMUM VERTICAL SEPARATION
FROM BOTTOM OF SAS TO HIGH GROUNDWATER SHALL BE 5 FEET. BOTTOM OF SAS
IS LOCATED 4 FEET ABOVE HIGH GROUNDWATER. A VARIANCE OF 1 FOOT IS
REQUESTED.
NOTE
OVERDIG TO BE INSPECTED BY TOWN OF YARMOUTH HEALTH DEPARTMENT PRIOR TO
PLACEMENT OF CLEAN SAND
4 CRESTVIEW DRIVE
EAST SANDWICH, MA 02537
PHONE: (508) 400-2365
ASTjMD2ESIGN, LLCidential Site Design and Permitting
LOCARON Gu uuV'T
45 MCGEE STREET APR 2 8 2020
WEST YARMOUTH, MA 02763
CLIENT,
CARL WALKER
DRAW/NG 77TLE.•
SUBSURFACE SEWAGE DISPOSAL SYSTEM
SITE PLAN AND PROFILE
-. SCALE.• LZ9TE• ORAW/NG NO.
1"=10' 2/25/2020 1 OF 1