HomeMy WebLinkAboutSite Layout and System Design- Not approved2 I 3 4 I 5 6 7 g 9 I 10 12 I 13 I 14 I_ D R /J� � ( T C D T
TOPOGRAPHY BASED ON BENCHMARK AND DATA
GENERAL.NOTES a V I! 1\ 1 D
- - under the sins and penalties of perjury, that the 1. THIS PLAN IS INTENDED FOR THE DESIGN OF THE SEWAGE DISPOSAL SYSTEM ONLY AND IS NOT TO BE USED TO ESTABLISH NEW OR EXISTING PROPERTY LINES OR DWELLINGS.
COLLECTED BY REFERENCED
WATER LTD. PROPERTY - 1, Jay Thrasher, hereby certify, u d p p r 1 ro
BOUNDARIES REFERENCED FROM PLOT PLN
- - .measured distances and the septic system components as illustrated on this 5. LOCATION OF WATER AND GAS UTILITY LINES IS APPROXIMATE. THE CONTRACTOR IS RESPONSIBLE FOR CONTACTING DIGSAFE AT 1,888-344-7233 PRIOR TO CONSTRUCTION.
CONDUCTED BY YANKEE SURVEY CONSULTANTS, - as -built plan are true and accurate. 6. INSTALLATION SHALL BE IN ACCORDANCE WITH THE STATE ENVIRONMENTAL CODE, TITLE 5 (310 CMR 15.000) AND THE LOCAL BOARD OF HEALTH REGULATIONS.
PAUL MERITHEW; PLS ON04/25/91. 7. - THE CONTRACTOR MUST HOLD A VALID INSTALLER LICENSE IN THE TOWN OF YARMOUTH.
_ 10'.PROPERTY LINE OFFSET 87 OLD MAIN STREET ROAD
FOR TANK AND SAS PARCEL CEL ID - 6
- 6270
INSPECTION PORT -
(TYP. OF 2). 3 FT -TRENCH WIDTH 171.1'
AND TRENCH 16 RIVER STREET'
3INCH. SCH. 40 PVC SEPARATION DISTANCE .BENCHMARK. NAIL IN TREE. 0.54 ACRES.
VENT. SEE PROFILE. ASSUMED ELEVATION100FT. PARCEL ID - 6268
J ------98.5 - MAP SQ LOT 157
8. THE CONTRACTOR SHALL NOTIFY THE ENGINEER AND THE LOCAL BOARD OF HEALTH OF ANY CHANGES TO THESE PLANS.
9. EXISTING FINISHED GRADE ELEVATIONS SHALL BE CONFIRMED PRIOR TO CONSTRUCTION. THE ENGINEER SHALL BE NOTIFIED IMMEDIATELY OF ANY DISCREPANCIES +/-6".
10. CONTRACTOR SHALL CALL FOR INSPECTIONS AND APPROVALS FROM THE BOARD OF HEALTH AND THE ENGINEER AFTER:
(a.) EXCAVATION
(b.) INSTALLATION OF SYSTEM COMPONENTS
SYSTEM NOTES:
1. ALL PIPING SHALL BE SCHEDULE 40 PVC UNLESS OTHERWISE SPECIFIED:
2. ALL PIPING (EXCEPT WITHIN THE SOIL ABSORPTION SYSTEM) SHALL BE BEDDED INFILL FREE FROM STONES OR BOULDERS. THE LETTERING ON THE PIPES SHALL BE VISIBLE TO VERIFY
PIPE SPECIFICATIONS BEFORE BACKFILLING-
3.
ACKFILLING3. FILL FOR THE SYSTEM SHALL BE COMPRISED OF CLEAN GRANULAR SAND, FREE FROM ORGANIC MATTER AND DELETERIOUS SUBSTANCES. MIXTURES AND LAYERS OF DIFFERENT SOIL
CLASSES SHALL NOT BE USED. THE FILL SHALL NOT CONTAIN ANY MATERIAL LARGER THAN TWO INCHES. A SIEVE ANALYSIS, USING A #4 SIEVE SHALL BE PERFORMED ON A
REPRESENTATIVE SAMPLE OF THE FILL DELIVERED TO THE SITE. UP TO 45% BY WEIGHT OF THE FILL SAMPLE MAY BE RETAINED ON THE #4 SIEVE. SIEVE ANALYSIS SHALL ALSO BE
PERFORMED ON A FRACTION OF THE FILL SAMPLE PASSING THROUGH THE #4 SIEVE, SUCH ANALYSIS SHALL ALSO DEMONSTRATE THAT THE MATERIAL MEETS EACH OF THE -
SPECIFICATIONS OF 310 CMR 15.255 (3).
4. ALL EXCAVATED AREAS SHALL BE SCARIFIED AND RELATIVELY DRY. FILL SHALL NOT BE PLACED IN RAIN OR SNOW STORMS. IF GROUND WATER IS OBSERVED DURING EXCAVATION, THE
ENGINEER SHALL BE NOTIFIED AND CONSTRUCTION HALTED IMMEDIATELY.
EXISTING SYSTEM NOTES
N I I 1 1. ` THE EXISTING CESSPOOLS SHALL BE PUMPED CLEAN OF ANY RESIDUAL WASTEWATER SHALL BE COMPLETELY FILLED WITH CLEAN SAND OR OTHER
v 1 22:5' I \ 98.5 -
SUITABLE MATERIAL APPROVED IN WRITING BY THE APPROVING AUTHORITY.
'SCHEDULE OF INVERT ELEVATIONS
AS -BUILT TIE -OUT SCHEDULE
DESIGN
A
B
DESCRIPTION
1
17.4'
30'
Septic Tanklnlet.
2
17.3''
34'
Septic Tank Middle
3
- 18'
3T
Septic Tank Outlet
4
46.3'
58.8'
D -Box
5
- 51'
75T
Inspection Port
- 6
71.9'
87'
Inspection Port
Cape Cod Commission
- Technical Bulletin
92-001
C
D
7
30.5'
39'
Edge of SAS
8
42:3'
31'
Edge of SAS
9
70'
64.3'
Edge of SAS
10
64.4'
69'
Edge of SAS
8. THE CONTRACTOR SHALL NOTIFY THE ENGINEER AND THE LOCAL BOARD OF HEALTH OF ANY CHANGES TO THESE PLANS.
9. EXISTING FINISHED GRADE ELEVATIONS SHALL BE CONFIRMED PRIOR TO CONSTRUCTION. THE ENGINEER SHALL BE NOTIFIED IMMEDIATELY OF ANY DISCREPANCIES +/-6".
10. CONTRACTOR SHALL CALL FOR INSPECTIONS AND APPROVALS FROM THE BOARD OF HEALTH AND THE ENGINEER AFTER:
(a.) EXCAVATION
(b.) INSTALLATION OF SYSTEM COMPONENTS
SYSTEM NOTES:
1. ALL PIPING SHALL BE SCHEDULE 40 PVC UNLESS OTHERWISE SPECIFIED:
2. ALL PIPING (EXCEPT WITHIN THE SOIL ABSORPTION SYSTEM) SHALL BE BEDDED INFILL FREE FROM STONES OR BOULDERS. THE LETTERING ON THE PIPES SHALL BE VISIBLE TO VERIFY
PIPE SPECIFICATIONS BEFORE BACKFILLING-
3.
ACKFILLING3. FILL FOR THE SYSTEM SHALL BE COMPRISED OF CLEAN GRANULAR SAND, FREE FROM ORGANIC MATTER AND DELETERIOUS SUBSTANCES. MIXTURES AND LAYERS OF DIFFERENT SOIL
CLASSES SHALL NOT BE USED. THE FILL SHALL NOT CONTAIN ANY MATERIAL LARGER THAN TWO INCHES. A SIEVE ANALYSIS, USING A #4 SIEVE SHALL BE PERFORMED ON A
REPRESENTATIVE SAMPLE OF THE FILL DELIVERED TO THE SITE. UP TO 45% BY WEIGHT OF THE FILL SAMPLE MAY BE RETAINED ON THE #4 SIEVE. SIEVE ANALYSIS SHALL ALSO BE
PERFORMED ON A FRACTION OF THE FILL SAMPLE PASSING THROUGH THE #4 SIEVE, SUCH ANALYSIS SHALL ALSO DEMONSTRATE THAT THE MATERIAL MEETS EACH OF THE -
SPECIFICATIONS OF 310 CMR 15.255 (3).
4. ALL EXCAVATED AREAS SHALL BE SCARIFIED AND RELATIVELY DRY. FILL SHALL NOT BE PLACED IN RAIN OR SNOW STORMS. IF GROUND WATER IS OBSERVED DURING EXCAVATION, THE
ENGINEER SHALL BE NOTIFIED AND CONSTRUCTION HALTED IMMEDIATELY.
EXISTING SYSTEM NOTES
N I I 1 1. ` THE EXISTING CESSPOOLS SHALL BE PUMPED CLEAN OF ANY RESIDUAL WASTEWATER SHALL BE COMPLETELY FILLED WITH CLEAN SAND OR OTHER
v 1 22:5' I \ 98.5 -
SUITABLE MATERIAL APPROVED IN WRITING BY THE APPROVING AUTHORITY.
'SCHEDULE OF INVERT ELEVATIONS
LOCATION
DESIGN
AS -BUILT
Existing 4" Sewer at Foundation
98.71
HORIZON/LAYER
4" Inlet to Septic Tank
97.10
%COARSE
FRAGMENTS
4" Outlet from Septic. Tank
96.90
LOAMY SAND
4" Inlet: to D -Box
96.60
11-28
4" Outlet from D -Boz
96,40
- 10YR6
4" Inlet to SAS
9620
C
Elev. at Bottom of Leachfield
94:20
NONE
Elev. Observed Groundwater
89.44
Elev. High Groundwater
90.94
Determination Method
Cape Cod Commission
- Technical Bulletin
92-001
ENGINEERING SERVICES
K 131 CLAY STREET STUDIO 325
_
CENTRAL FALLS, RHODE ISLAND 02863
TELEPHONE: +1 (508) 954 0677
EMAIL: JAY@ROBIALWATER.COM
CONSULTANTS:
J
.TRENCH I - DETACHED -
LENGTH ' I � GARAGE - 2.. THE BUILDING SEWER LINE CONNECTED TO THE CESSPOOL ON THE SOUTH SIDE OF THE BUILDING SHALL BE RE-ROUTED WITHIN THE -
- - - - - - - - - I `\ 99 / 20 RIVER STREET -BASEMENT/CRAWLSPACE BY A LICENSED PLUMBER AND CONNECTED TO THE SEWER ON THE NORTH OF THE BUILDING
- _ I I 0.41 ACRES VARIANCES / SITE NOTES:
_ 40:0' 98* PARCEL ID - 6267 7 j I I 99.5 � H-10 1500 GAL 1. A VARIANCE FOR SEPARATION TO GROUNDWATER IS REQUESTED. SEE SYSTEM PROFILE FOR ELEVATIONS -
DISTRIBUTION BOX. 98.5' _ ( �- I \ \I J C 2 -COMPARTMENT 2. THIS SYSTEM DOES NOT LIE WITHIN.A ZONE IL
98 SEPTIC TANK - 3. POTABLE WATER IS PROVIDED BY MUNICIPAL WATER CONNECTION. - -
BFT OFFSET FROM i ®PTI EXISTING SEWER �...: \a i
I
EXISTING CESSPOOL. m �- SEPTIC TANK NOTES:
I TP1 I -"� BASEMENT BULKHEAD 1. THE SEPTIC TANK SHALL BE DESIGNED, .CONSTRUCTED AND INSTALLED PURSUANT 310 CMR 15.223 -15.228. a I 0 A 2. SEPTIC TANKS SHALL BE INSPECTED AND MAINTAINED IN. ACCORDANCE WITH 310 CMR 15.300 AND APPLICABLE LOCAL o
REQUIREMENTS. a
EXISTING CESSPOOL.(TYP). 188 5 ® a ONd�a`os e
98 g I DISTRIBUTION BOX (D -BOX) NOTES: F
TO BE FILLED AND ` I 1. D -BOX SHALL BE H-10 RATED AND DESIGNED, CONSTRUCTED AND INSTALLED IN CONFORMANCE WITH 310CMR15.232. °�eyYR
ABANDONED. SEE NOTES: I. - SEWER H FOUNDROUTED.
� 20' BUILDING f f ,�`�` THROUGH FOUNDATION WALL 2. THE INVERT ELEVATION OF ALL OUTLETS SHALL BE EQUAL TO EACH OTHER AND LOCATED AT LEAST 2 INCHES BELOW THE
_ OFFSET FOR SAS / \ ` Co INVERT ELEVATION OF THE .INLET.
OUTDOOR SHOWER AREA LD
m 3. SEWER LINE FROM EXISTING SEPTIC TANK TO PROPOSED D -BOX IS APPROXIMATE. CONTRACTOR TO DETERMINE BEST 3e
/ ! \ (n _ ROUTING IN THE FIELD. A CLEAN OUT IS REQUIRED FOR ALL CHANGES IN DIRECTION OF THE SEWER LINE (SEE CLEANOUT S !d
- 99.. .`��� LEGEND DETAIL). - -LOCUS
rLOCUS �m
I. \\ �\ EXISTING CESSPOOL. TO BE FILLED TEST PIT
- 10' BUILDING I \�. �, AND ABANDONED. SEE NOTES. SOIL ABSORPTION SYSTEM (SAS) NOTES: - - _
PERCOLATION TEST 16 River Street
10 RIVER STREET c I OFFSET FOR TANK CONTOUR 9 EQUIPMENT ONTHESAS SHOULD BE AVOIDED ATALLPRIOR, DURING AND AFTER I CONS RUICTION._q _21BIQ8 TO THF INSTALLaIlON VEHICLES OR H
H 0.1 ACRES EXISTING
OF THE SAS AND UNTIL RECEIE1 QFA CERTIFI ATE OF COMPLIANCE FROM THE APPROVING
4 -BEDROOM PROPOSED CONTOUR AUTHORITY IN ACCORDANCE WITH 310 CMR 15.021, THE PERIMETER OF THE SAS SHALL. BE STAKED F -
8
.5 ® DWELLING HEAVY MACHINERY MAY PASS OVER THE SAS DURING THIS TIME. - - - - - -
3 a
-
EXISTING BRICK PATIO � 10. THE BOTTOM OF SAS SHALL BE EXCAVATED TO A LEVEL GRADE. IF THE REMOVAL OF STONES OR BOULDERS IS REQUIRED; Oiw
TREE i
/ I O/H E. OVERHEAD ELECTRICAL CREATING LOCALIZED DEPRESSIONS, FILLING TO GRADE WITH THE EXCAVATED NATURALLY OCCURRING PERVIOUS SOIL MoCt"o9 I
OR MATERIAL IN COMPLIANCE WITH 310 CMR 15.255 IS ACCEPTABLE
- I �•(t10F Mqs
\WMUNICIPAL WATER 11, BASE AGGREGATE DENOTES THE MATERIAL BELOW THE ELEVATION OF THE INVERT OF THE TRENCH LATERAL TO THE - esti
98 , K BOTTOM ELEVATION OF THE TRENCH (LE. SAS) AND SHALL CONSIST OF DOUBLE WASHED STONE RANGING FROM'/. TO 1'h
\. ❑ - G NATURAL GAS LINE - o _ �'L I O JAY. M. N
/ ❑ INCHES IN DIAMETER AND SHALL BE FREE OF IRON PARTICLES, FINES AND DUST IN PLACE 3 gya THRASHER '�
97.5 97 a I 12. WHEN EXCAVATING TRENCHES, NATIVE SANDY SOIL SHALL BE KEPT SEPARATEAND USED AS TOP AGGREGATE TO - m I o CIVIL --t
/ a BACKFILL TRENCHES ABOVE GEOTEXTILE. SEE TRENCH DETAIL. BACKFILL MUST BE CLEAN AND FREE OF STONES AND
ID BOULDERS GREATER THAN SIX INCHES IN SIZE.: TAILINGS, CLAY OR SIMILAR MATERIALS ARE PROHIBITED. m �\m�aae I o. No. 54434 rn
-.I C7
99 ? 13. FINAL GRADE SHALL HAVE A 2% SLOPE AWAY FROM DRAINFIELD TO REDUCE RUNOFF OVER THE TRENCH AREA. G I A A'p 9F Q
G -. \ / / / j� 5 / X _ _ 8. TRENCH LATERAL OUTLET ORIFICES SHALL BE EVENLY SPACED ALONG TWO ROWS RUNNING THE LENGTH OF THE LINE, ON
/ m SITE PLAN EACH SIDE, MIDWAY BETWEEN THE INVERT AND CENTER -LINE WHICH SEPARATES THE UPPER AND LOWER HALVES OF THE I I
BOUNDARY OF PIPE, AND ORIFICES SHALL BE NO SMALLER THAN D INCH AND NO LARGER THAN E INCH IN DIAMETER.
LANSCAPED AREA (TYP.) I , / 96 3 - - SCALE: 1" = 20' 9.. TRENCH LATERALS SHALL HAVE A SLOPE OF 0.005 FEET PER FOOT ALONG ASTRAIGHT LINE WITHOUT BENDS. A - 116. JV �o
A 0 20 40
/ 10. - THE END OF THE TRENCH LATERALS SHALL BE CONNECTED AND VENTED THROUGH AN UNPERFORATED 3 INCH SCH. 40 PVC
PIPE. THE VENT SHALL BE SECURED TO PREVENT ANIMALS AND PRECIPITATION FROMENTERINGTHE VENT PIPE.
168.96'Co
11. DISTRIBUTION LINES CONNECTING THE DISTRIBUTION BOX TO TRENCH .LATERALS SHALL BE UNPERFORATED WITH WATER I
99. 98 97 96 -L TIGHT CONNECTIONS AND JOINTS. -
Willow Street I
RIVER STREET
.VICINITY MAP L
NOT TO SCALE
I I
F __ a
F
E
SOIL TEST PIT & PERCOLATION TEST DATA
Test Date: June 01, 2020 -
Testing: Jay Thrasher, PE - Robial Water Ltd.
Witness: Mallory Langler, Yarmouth BOH
TEST PIT 1 (97.69)
DEPTH
HORIZON/LAYER
TEXTURE
COLOR
%COARSE
FRAGMENTS
0-11
Ap
LOAMY SAND
- 1OYRq
NONE
11-28
B
LOAMY SAND
- 10YR6
NONE.
28-110
C
SAND
10YR3
NONE
- PERC TEST 1 @ 48", Start 12:40PM Stop: 12:53PM Could not saturate. Less than 2 minutes per inch.
Weeping groundwater observed at 110 inches. Standinggroundwater observed. at 99 inches. Seasonal
High Groundwater (SHGW) calculated to be 6.75 feet below grade (90.94) using method pursuant
Cape Cod Commission's Technical Bulletin 92-001.
1 CERTIFY THAT 1 AM A LICENSED SOIL EVALUATOR (SE #14068) HAVING PASSED THE
TRAINING AND TESTING REQUIREMENTS IN APRIL 2018.
JAYTHRASHE, P.E.
o
i
1500 GALLON 2- COMP: SEPTIC TANK (H-10)
RECOMMENDED MANUFACTURER/MODEL: -
- SHEA CONCRETE/15002C BOTTOM ON LEVEL, STABLE BASE `
MECHANICALLY COMPACTED WITH
m SYSTEM PROFILE 6"CRUSHED STONE
NOT TO SCALE
i I � 11 �
1 2 3 4 5 6 7 $ 9 10 12
I I
l I
I I
L ------------A
PROJECT:
E RESIDENTIAL ONSITE
WASTEWATER TREATMENT
SYSTEM
16 River Street
Yarmouth, MA 02664
Remedial Use
4 AS -BUILT UPDATED 07/16/2020
C 3 AS -BUILT 07/13/2020
2 REVISED SAS TO TRENCHES 06/18/2020
1 CONSTRUCTIONDRAWINGS 06/05/2020
Ap LAYER = 96:77 No REVISION/SUBMISSION DATE
B LAYER COPYRIGHT 2019- Robial Water Ltd. This document, and the ideas and design concepts incorperated
1 =.95.36 herein, as an instrument of professional service, cannot be used, in whole or in part for this or any other
pmlect, without the wriNen authorization of Robial Water I.W. .
PROJECT No: T5.2020001
CONSTRUCTION DRAWINGS
C HORIZON B PENDING BOH APPROVAL
SHEET TITLE:
I -90.94
SITE LAYOUT AND SYSTEM
DESIGN
SHEET SIZE: 24 IN. X 361N. (ARCH D)
A DATE: 05 June 2020
SHEET NUMBER:
SHEET 1 OF 1
14
MAGNETIC TAPE MUST BE PLACED ON THE TOP OF ALL
FINISHED GRADE SHALL BE MIN. 2% SLOPE, STABILIZED
-
4" CLEANOUT: INSTALL FLUSH TO
COMPONENTS INCLUDING PIPES TO AID IN THE LOCATION OF
AND GRADED TO REDUCE INFILTRATION AND EROSION -
FINSH GRADE. REQUIRED IF
COMPONENTS AFTER BACKFILLING
CHANGE IN DIRECTION OF SEWER.
' 31NCH VENT WITH
-
POLYLOK® POLY AIR
-
-
COVER WITH GEOTEXTILE
ACTIVATED CARBON FILTER.
MATERIAL. SEE NOTES
a
-
TOF = 100.48
C
' 99.71 -
3 FT
od 99.01
98.0±
TRENCH BASE
_
.AGGREGATE. SEE NOTES_ -
- c
3„SCH
Ml C PVC
98.0±
N 1.
v
9" MIN.
EXISTING SEWER -
-
OUTLET DISTRIBUTION LINES SHALL BE
12" MIN. TO 36" MAX COVER
a
INVERT = 98.71. -
LEVEL FOR A MINIMUM OF THE FIRST 2
1 = 95.03
-
-
ONTACT ENGINEER a. _ - • --c. - '
-- --
FEET OF THEIR LENGTH
s -
-- m, -
IF ELEVATION
E
a
CHANGES. 13,. 3" MIN.
3,,. MIN. -
-
10 IN.
..
I =94.2
>
a
a a"SC
2%40
2%C
4"SCH
VC
p
a:d tLl/IV ' 6"MIN.
6"MIN.
1%MIN.$OPE
22:5 FT.
•,
B
10" MIN.
ZABLE
®® M/N. 1% SLS
SOIL ABSORPTION SYSTEM (SAS)
I =.97.1
E
3.26 FT
i.
_
INVERT ELEVATION: AT FOUNDATION IS(,
FILTER
1 = 96.9
. _
APPROXIMATE. CONTRACTOR SHALL CONFIRM 12' MAX.
_
J =96.4.
-
j
SEASONAL HIGHGROUNDWATER (SHGW) ! y -
- -
INVERT ELEVATION AT FOUNDATION PRIOR TO I' 4' MIN.
12 MAX
I
CONSTRUCTION. A MINIMUM OF 2 % SLOPE
•
1 = 96.6 DISTRIBUTION BOX
=
i -
-
REQUIRED_ FOR SEWER PIPE BETWEEN BUILDING-
- - -
--- --- -
-- 6 OUTLET (H-10)
-
-
o
FOUNDATION INVERT AND SEPTIC TANK INLET. -
-
o
i
1500 GALLON 2- COMP: SEPTIC TANK (H-10)
RECOMMENDED MANUFACTURER/MODEL: -
- SHEA CONCRETE/15002C BOTTOM ON LEVEL, STABLE BASE `
MECHANICALLY COMPACTED WITH
m SYSTEM PROFILE 6"CRUSHED STONE
NOT TO SCALE
i I � 11 �
1 2 3 4 5 6 7 $ 9 10 12
I I
l I
I I
L ------------A
PROJECT:
E RESIDENTIAL ONSITE
WASTEWATER TREATMENT
SYSTEM
16 River Street
Yarmouth, MA 02664
Remedial Use
4 AS -BUILT UPDATED 07/16/2020
C 3 AS -BUILT 07/13/2020
2 REVISED SAS TO TRENCHES 06/18/2020
1 CONSTRUCTIONDRAWINGS 06/05/2020
Ap LAYER = 96:77 No REVISION/SUBMISSION DATE
B LAYER COPYRIGHT 2019- Robial Water Ltd. This document, and the ideas and design concepts incorperated
1 =.95.36 herein, as an instrument of professional service, cannot be used, in whole or in part for this or any other
pmlect, without the wriNen authorization of Robial Water I.W. .
PROJECT No: T5.2020001
CONSTRUCTION DRAWINGS
C HORIZON B PENDING BOH APPROVAL
SHEET TITLE:
I -90.94
SITE LAYOUT AND SYSTEM
DESIGN
SHEET SIZE: 24 IN. X 361N. (ARCH D)
A DATE: 05 June 2020
SHEET NUMBER:
SHEET 1 OF 1
14