Loading...
HomeMy WebLinkAboutReview Checklist TOWN OF YARMOUTH SEWAGE PLAN REVIEW CHECKLIST Location: A.M. L3I 137 Lot Zone of Contribution: In Out X Acreage 4i, 2/3 S F Commercial: Residential: X Street: 3 9 C f2-r - Co A1/4 Village: 2t -4tac, Floor Plan: ✓ #Bedrooms: Owner: C&oi F kG„v P€-2`' Installer: CII l Address: 238 Sr. Phone: S-e,9 39 8 Z 1 l Phone: f/,,t-yr.,-9 c g-i k A rug 22 e5 1`1"v'7 Builder: Engineer: v C2 Address: Phone: $c'e 3 (,Z `f r`/ I Phone: N/A YES NO 1.Required#of copies received 2.Date of soils exam and percolation test not older than 2 years ✓ 3. 4-5 ft of naturally occurring pervious material, above water table 4. Foundation 2 ft above high point of road H.P.: Fnd: Var.: 5. Water line 10 ft from septic components Var.: 6. Benchmark indicated and shown-NGVD if near wetlands 7. Septic tank minimum 10 ft from foundation, deck Var.: E-k'sr 8. Leaching minimum 20 ft full, 15 ft crawl, 10 ft slab Var.: V 9. Leaching minimum 100 ft from wetlands Var.: 10. Leaching minimum 150 ft from drinking well/25 ft irrigation well Var.: V 11.Tank/leaching minimum 10 ft from property line Var.: 12. System meets all other setback requirements Var.: 13. Uses adjustment for maximum high groundwater Var.: / 14. Leaching set 4-5 ft above adj. water or bottom of test hole Var.: 15. System not in top or subsoil(A,B horizons)or 5' removal - 16.Proposed contours are suitable ✓ 17. System meets slope requirements-min. 1/8", %"preferred V 18. System meets breakout requirements PVC liner: Wall: V✓ 19. Specified tee sizes are proper, gas baffle on outlet tee 20. Sewage is under 10,000 gpd for parcel 21.No garbage disposal r/ 22. System adequately sized for its intended use y/ 23.Minimum 6"stone or compacted below tank and dbox ✓ 24. Manhole covers within 6"of grade,pump chamber cover to grade V 25.Inspection port on plastic chambers/leach field v 26. Electrical permit for pump chamber/Separate meter for duplexes V 27.Pump system-2"line,weep hole,check valve,tee in dbox,pump size ✓ 28. Septic tank/pump chamber to be factory waterproofed 29. Vent provided if leaching below 3 feet,under driveway/parking • 30. Buoyancy calculations for tank/pump chamber ✓ 31. Engineer to inspect and certify soils: wall: commercial: 32. Engineer/Registered Sanitarian and Land Surveyor stamps/signature V 33. H-20 loading is subject to vehicular traffic, groundwater f 34. Title V Application and permit fee, installer signature 35.Foundation footing min. 2 feet above adjusted ground water for new house ✓ 36.Deed Restriction required max. #bedrooms: max. flow: gpd ✓ 37. Check area lots for groundwater/Label groundwater in Assessor's Map Plan reviewed by: .S.- 7 1-e--"-) A . tf1 +'S 6 03,03