HomeMy WebLinkAboutCOC RequestDOWN CAPE ENGINEERING, INC.
939 Main Street
Yarmouth Port, MA 02675
508-3624541
DCE Job # 01-139
Date: June 24, 2022
To: Heidi Hudson, Conservation Administrative Assistant
Town of Yarmouth
1146 Route 28
South Yarmouth, MA 02664
From: Priscilla Leclerc
Delivered.
Enclosed is a Request for a Certificate of Compliance for SE83-1566, Henderson
Carnevali, 426A Highbank Road, South Yarmouth, and the $75.00 fee check.
Please feel free to call if you have any questions.
DOWN CAPE ENGINEERING, 1NC.
939 MAIN ST, SUITE C
YARMOUTH PORT, MA 02675
PHONE: 508-3624541
FAX: 508-362-9880
priscilla@downcape.com
CONSERVATION
DIVISION
• Ar 'c r Ac
All filings must be made on Town of Yarmouth forms.
All applications must be submitted two weeks prior to the next scheduled Conservation
Commission meeting. Refer to Meeting Schedule.
Failure to follow the Administrative Checklist shall result in an Administrative Incomplete
Application and will not be scheduled for a Public Hearing.
Contact the Conservation Office if you need assistance.
1 complete original application, plan/sketch, and other supporting information
to the Conservation Division - mailed to/dropped off at Town Hall.
� 1 complete pdf of application, plan/sketch, and other supporting information
emailed to k rq ant(aVVarmouth.ma.us.
Statement from Engineer and/or stamped As -Built plan if required under the
Order of Conditions to be included with both original and pdf application.
Refer to 310 CMR 10.05(9)(d).
v Local filing fee. Refer to Fee Schedule. Make check payable to "Town of Yarmouth"
and include property address in memo.
All forms, Fee Schedule and Meeting schedule can be found at
https://www.yarmouth.ma.us/696/Filing-Forms.
Yarmouth Conservation Commission • 1146 Route 28 •South Yarmouth, MA 02664-4492
Tel. (508)-398-2231 Ext. 1288 •Fax (508)-398-0836 • TTD# (508) 398-2231 • k�rant cuyarmouth.ma.us
Rev 8/2021
Important:
When filling out
forms on the
computer, use
only the tab
key to move
your cursor -
do not use the
return key.
tab
IL�I
Upon completion
of the work
authorized in
an Order of
Conditions, the
property owner
must request a
Certificate of
Compliance
from the issuing
authority stating
that the work or
portion of the
work has been
satisfactorily
completed.
Massachusetts Department of Environmental Protection
Bureau of Resource Protection - Wetlands
WPA Form 8A — Request for Certificate of Compliance
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40
Town of Yarmouth Wetland By-law, Chapter 143
A. Project Information
1. This request is being made by:
Jacqueline Carnevali
Name
PO Box 581
Mailing Address
South Yarmouth
Cityrrown
508-273-3661
Phone Number
MA
State
2. This request is in reference to work regulated by a final Order of Conditions issued to:
John Henderson
Applicant
9-18-01
Dated
3. The project site is located at:
426 Highbank Road
Street Address
92
Assessors Map/Plat Number
SE83-1566
DEP File Number
South Yarmouth
City/Town
7
Parcel/Lot Number
4. The final Order of Conditions was recorded at the Registry of Deeds for:
John Henderson
Property Owner (if different)
Barnstable
County
Certificate (if registered land)
5. This request is for certification that (check one):
14264
Book
DEP File Number:
SE83-1566
Provided by DEP
02664
Zip Code
208
Page
® the work regulated by the above -referenced Order of Conditions has been satisfactorily completed.
❑ the following portions of the work regulated by the above -referenced Order of Conditions have
been satisfactorily completed (use additional paper if necessary).
❑ the above -referenced Order of Conditions has lapsed and is therefore no longer valid, and the
work regulated by it was never started.
wpaform8a.doc •• rev. 5/29/14 Page 1 of 2
Massachusetts Department of Environmental Protection
Bureau of Resource Protection - Wetlands
WPA Form 8A — Request for Certificate of Compliance
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40
Town of Yarmouth Wetland By-law, Chapter 143
A. Project Information (cont.)
DEP He Number:
SE83-1566
Provided by DEP
6. Did the Order of Conditions for this project, or the portion of the project subject to this request, contain
an approval of any plans stamped by a registered professional engineer, architect, landscape
architect, or land surveyor?
® Yes If yes, attach a written statement by such a professional certifying substantial
compliance with the plans and describing what deviation, if any, exists from the plans
approved in the Order.
❑ No
B. Submittal Requirements
Requests for Certificates of Compliance should be directed to the issuing authority that issued the final
Order of Conditions (OOC). If the project received an OOC from the Conservation Commission, submit
this request to that Commission. If the project was issued a Superseding Order of Conditions or was the
subject of an Adjudicatory Hearing Final Decision, submit this request to the appropriate DEP Regional
Office (see http://www.mass.gov/eea/agencies/massdep/about/contacts/find-the-massdep-regional-office-
for-your-city or-town.html).
wpaform8a.doc ••rev. 5/29/14 Page 2 of 2
�T`'�r L 20aZZ
939 main street rt 6a
yarmouth port
mass 02675
land court
surveys
structural design
site planning
sewage system
designs
inspections
permits
down cape engineering, inc
civil engineers & land surveyors
June 23, 2022
Yarmouth Conservation Commission
1146 Route 28
South Yarmouth, MA 02664
Re: Request for Certificate
SE 83-1566 (Henderson,
Dear Commission Members:
of
Compliance
South Yarmouth)
tel. (508) 362-4541
fax (508) 362-9880
Daniel A. Ojala, P.E., P.L.S.
Arne H. Ojala, P.E., P.L.S.
Daniel E. Gonsalves, P.E., S.E
Craig J. Ferrari, E.I.T., S.E.
On 9/18/2001, the Commission issued an Order of Conditions for
proposed work at the above -referenced site.
A site visit was made; an as -built plan and photos are enclosed
for review. The following minor deviations were noted:
• The patio was replaced by bluestone a number of years ago, it
is slightly larger than the previous footprint shown on the
plan from 2001
• A small patio area was added to the landward side of the
house in the area of the bulkhead and step
• 2 small air conditioning/heating units were added to the east
side of the house
• Flagstone and tie steps were added approximately 22 years ago
(owner's memory) for access to the pier; a small flagstone
sitting area was added between the steps and the bluestone
patio
To the best of my knowledge and belief, we hereby certify
work has been completed in substantial compliance with the
approved plan and Order of Conditions. We hereby request
issuance of a Certificate of Compliance at this time.
Thank you for your consideration.
Very truly yours, Dan
iel A. Ojala, PE, PLS
Down Cape Engineering, Inc.
cc: J. Carnevali
John Henderson
encl.
that the
the