Loading...
HomeMy WebLinkAboutReview Checklist TOWN OF YARMOUTH _� ��` /, - SEWAGE PLAN REVIEW CHECKLIST Location: A.M. X Lot XI Zone of Contribution: In Out Acreage a-). 'kt- '9-'1 l Commercial: Residential: Street: ,F 7 3 Village: W Floor Plan: ✓ #Bedrooms: Owner: It Ke./S' Installer: "t61/1 Address: Phone: Phone: Builder: Engineer: v ��� J/ Address: Phone: "j--' - %r7,%-;;7-; -G i --29.)-2-, Phone: - l) w c.)6 c,ic.62/ - 4 /C.____ N/A YES NO 1. Required#of copies received k_,----- 2. /2. Date of soils exam and percolation test not older than 2 years k...--- 3.4-5 ft of naturally occurring pervious material, above water table "1/4._.--- 4.Foundation 2 ft above high point of road H.P.: Fnd: Var.: 5. Water line 10 ft from septic components Var.: �---. 6. Benchmark indicated and shown-NGVD if near wetlands ; 7. Septic tank minimum 10 ft from foundation, deck Var.: t 8. Leaching minimum 20 ft full, 15 ft crawl, 10 ft slab Var.: t..------ 9. /9. Leaching minimum 100 ft from wetlands Var.: ....._--- 10. i10. Leaching minimum 150 ft from drinking well/25 ft irrigation well Var.: ../ 11. Tank/leaching minimum 10 ft from property line Var.: 12. System meets all other setback requirements Var.: t/ 13. Uses adjustment for maximum high groundwater Var.: (.....---- 14. Leaching set 4-5 ft above adj. water or bottom of test hole Var.: .._...--- 15. System not in top or subsoil(A,B horizons)or 5' removal .1/4----- 16.Proposed contours are suitable t_-/- 17. System meets slope requirements-min. 1/8", '/<"preferred k.------- 18. ./18. System meets breakout requirements PVC liner: Wall: L----- 19. l19. Specified tee sizes are proper, gas baffle on outlet tee L..- - ..20. Sewage is under 10,000 gpd for parcel i----- 21. ./21.No garbage disposal C..---- 22. System adequately sized for its intended use 23. Minimum 6"stone or compacted below tank and dbox (------- 24. --/24.Manhole covers within 6"of grade,pump chamber cover to grade 1/4------ 25. �25. Inspection port on plastic chambers/leach field ....--- 26. Electrical permit for pump chamber/Separate meter for duplexes 27.Pump system-2"line,weep hole,check valve,tee in dbox,pump size ___.---- 28. 28. Septic tank/pump chamber to be factory waterproofed 29. Vent provided if leaching below 3 feet, under driveway/parking 30. Buoyancy calculations for tank/pump chamber /" 31. Engineer to inspect and certify soils: wall: commercial: _.---- 32. Engineer/Registered Sanitarian and Land Surveyor stamps/signature ------ 33. 33. H-20 loading is subject to vehicular traffic,groundwater _/- 34. 34. Title V Application and permit fee, installer signature C_____2; 35. Foundation footing min. 2 feet above adjusted ground water for new house _,---- 36. Deed Restriction required max. #bedrooms: max. flow: gpd 37.Check area lots for groundwater/Label groundwater in Assessor's Map Plan reviewed by: 6/03/03