HomeMy WebLinkAboutReview Checklist TOWN OF YARMOUTH
SEWAG PLAN REVIEW CHECKLIST
Location: A.M. 77 Lot Zone of Contribution: In Out / Acreage
Commercial: Residential:
Street: 8 Off i* Uc r S7rec T1
Village: Floor Plan: L/ #Bedrooms: 1
Owner: D o f d ii. y/ LJd jo,i Installer: C4rd��'1 -€ / et,Lid
Address: J Phone:
Phone:
Builder: Engineer: C)cLCr: of \\N, .-Set-'
Address: Phone:
Phone:
N/A YE� NO
1. Required#of copies received
2.Date of soils exam and percolation test not older than 2 years
3.4-5 ft of naturally occurring pervious material,above water table
4.Foundation 2 ft above high point of road H.P.: Fnd: Var.:
5.Water line 10 ft from septic components Var.: V
6.Benchmark indicated and shown-NGVD if near wetlands �j
7. Septic tank minimum 10 ft from foundation, deck Var.:
8.Leaching minimum 20 ft full, 15 ft crawl, 10 ft slab Var.:
9.Leaching minimum 100 ft from wetlands Var.:
10.Leaching minimum 150 ft from drinking well/25 ft irrigation well Var.:
11.Tank/leaching minimum 10 ft from property line Var.: V
12. System meets all other setback requirements Var.:
13.Uses adjustment for maximum high groundwater Var.: l
14.Leaching set 4-5 ft above adj. water or bottom of test hole Var.`
15. System not in top or subsoil(A,B horizons)or 5' removal
‘.7,-
16.
16.Proposed contours are suitable
17. System meets slope requirements-min. 1/8", %"preferred
18. System meets breakout requirements PVC liner: Wall: V
19. Specified tee sizes are proper, gas baffle on outlet tee NV
20. Sewage is under 10,000 gpd for parcel t
/
21.No garbage disposal V�
22. System adequately sized for its intended use
23.Minimum 6"stone or compacted below tank and dbox
24. Manhole covers within 6"of grade,pump chamber cover to grade z
25. Inspection port on plastic chambers/leach field
26. Electrical permit for pump chamber/Separate meter for duplexes f
27.Pump system-2"line,weep hole,check valve,tee in dbox,pump size
28. Septic tank/pump chamber to be factory waterproofed 1_,
29. Vent provided if leaching below 3 feet,under driveway/parking
30.Buoyancy calculations for tank/pump chamber
31. Engineer to inspect and certify soils: wall: commercial:
32. Engineer/Registered Sanitarian and Land Surveyor stamps/signature
33.H-20 loading is subject to vehicular traffic, groundwater
34.Title V Application and permit fee,installer signature
35.Foundation footing min. 2 feet above adjusted ground water for new house
36.Deed Restriction required max. #bedrooms: max. flow: gpd J
37. Check area lots for groundwater/Label groundwater in Assessor's Map
Plan reviewed by- Cup.4.0 6 03 03