Loading...
HomeMy WebLinkAboutReview Checklist TOWN OF YARMOUTH SEWAGE PLAN REVIEW CHECKLIST Location: A.M. Lot 73 Zone of Contribution: In_ Out_ Acreage/(M Commercial: Residential: /� Street: 7 cF.G P7/ . -S-4-47.10/='y Village: ( Floor Plan: 1...---"°. #Bedrooms: Owner: NQ,,,,.. We,c_)ez 0010 Installer: !_i r?'C, Address: y Phone: Phone: Builder: Engineer: Ems-v - yd.,L, Address: Phone: Phone: N/A YESJ NO 1. Required#of copies received _ z! 2.Date of soils exam and percolation test not older than 2 years 3.4-5 ft of naturally occurring pervious material,above water table 4.Foundation 2 ft above high point of road H.P.: Fnd: Var.: / V 5.Water line 10 ft from septic components Var.: 6.Benchmark indicated and shown-NGVD if near wetlands 7. Septic tank minimum 10 ft from foundation, deck Var.: / 8.Leaching minimum 20 ft full, 15 ft crawl, 10 ft slab Var.: V`, / _.__ 9.Leaching minimum 100 ft from wetlands Var.: - 10. Leaching minimum 150 ft from drinking well/25 ft irrigation well Var.: V. 11.Tank/leaching minimum 10 ft from property line Var.: 12. System meets all other setback requirements Var.: v 13.Uses adjustment for maximum high groundwater Var.: f 14. Leaching set 4-5 ft above adj. water or bottom of test hole Var.: \ -... 15. System not in top or subsoil(A,B horizons)or 5' removal ✓' 16.Proposed contours are suitable 17. System meets slope requirements-nun. 1/8", 1/"preferred 18. System meets breakout requirements PVC liner: Wall: v 19. Specified tee sizes are proper, gas baffle on outlet tee /� 20. Sewage is under 10,000 gpd for parcel 21.No garbage disposal ' \/7 22. System adequately sized for its intended use 23.Minimum 6"stone or compacted below tank and dbox 1.-----' 24. Manhole covers within 6"of grade,pump chamber cover to grade t . 25. Inspection port on plastic chambers/leach field ✓ 26. Electrical permit for pump chamber/Separate meter for duplexes V/ 27.Pump system-2"line,weep hole,check valve,tee in dbox,pump size V 28. Septic tank/pump chamber to be factory waterproofed %/ 29. Vent provided if leaching below 3 feet,under driveway/parking V/ 30.Buoyancy calculations for tank/pump chamber 31. Engineer to inspect and certify soils: wall: commercial: 32. Engineer/Registered Sanitarian and Land Surveyor stamps/signature 33.H-20 loading is subject to vehicular traffic, groundwater ✓ 440' 34.Title V Application and permit fee,installer signature v 35.Foundation footing min. 2 feet above adjusted ground water for new house 36. Deed Restriction required max. #bedrooms: max. flow: gpdf 37. Check area lots for groundwater/Label groundwater in Assessor's Map f PIan reviewed by: ct4vJ.a a4-2,-----____ s as oa C-a 8-a 2