Loading...
HomeMy WebLinkAboutEngineer PlanLEGEND --20 -- EXISTING CONTOUR x 2012 EXISTING SPOT GRADE -W- EXISTING WATER SERVICE -G- PROPOSED GAS SERVICE 100.68--&.HrW..-- OVERHEAD WIRES EXISTING CESSPOOL r TEST PIT TO BE PUMPED, FILLED WITH 4ND AND ABANDONED, OR REMOVE IRO PIPE BENCHAMRK 100.N PROPOSED SEPTIC TANK LOCUS MAP 100,45 PROPOSED SEWER CONNECTION I INV.=99.80± (EXISTING) - (1 C5 X 100.77 �J ' 101.13 p GENERAL NOTES: 3co Y� ,y00 x ! �� 2 1. ALL CHANGES TO THIS PLAN MUST BE APPROVED BY THE LOCAL �``` �'" fff��_ IOOiB BOARD OF HEALTH AND THE DESIGN ENGINEER. `� 101.43 .. - 5g 1� ..Y O,. 100.13 2. ALL WORK AND MATERIALS SHALL CONFORM TO THE REQUIREMENTS x 101.2A iO WSD OF THE STATE ENVIRONMENTAL CODE, TITLE V, AND ANY APPLICABLE 0 68 �M O LOCAL RULES AND REGULATIONS. 0, 11� -310 CMR 15.405(1)(x)&(b): LOCAL UPGRADE APPROVAL y 1) A 2' variance. S.A.S. to property line, for on 8' setback. J _ 2) A 5' variance, S.A.S. to cellar wall, for 15' setback. ' 10#.14 BENCHMARK 100 .b 3. THE SEWAGE DISPOSAL SYSTEM SHALL NOT BE BACKFILLED PRIOR MAG, NAIL SET LOT 1 6 I 'r EL=100.00 TO INSPECTION AND APPROVAL BY THE BOARD OF HEALTH AND THE I E MING 0,7,� DESIGN ENGINEER. 9'000tS.F. i HOU E(#101) 1 x ''; 4. ANY CONDITIONS ENCOUNTERED DURING CONSTRUCTION DIFFERING x 100.35 T,.O. 11010'` - 1 FROM THOSE SHOWN HEREON SHALL BE REPORTED TO THE DESIGN -101.6± 1 ,%' �'. t , x I FF =102.71 1 10020 -� 99.84 ENGINEER BEFORE CONSTRUCTION CONTINUES. 100.31 100,48 .;5. ALL ELEVATIONS BASED ON NAVD99. �i {�/ x DECKTHE 6. THE DESIGN ENGINEER IS NOT RESPONSIBLE FOR THE FAILURE OF I 100.85. I '$•� •._. Eli.:.::;'. ONTRATHELOCAL BOARD OF 1 44 HEALTH FORCPROPER INSPECTIONS DTURINGIFY CONSTRUCTION. ` VENT 99,66 100,6 :' P�.: 7. WATER SUPPLY PROVIDED BY TOWN WATER SERVICE. 'i �R`'.; . G d?• 8. THERE ARE NO WELLS WITHIN 100' OF THE PROPOSED S.A.S. x 1004410 PPJE1) 10063 �Cj� p 9. ALL AREAS CLEARED FOR CONSTRUCTION SHALL BE RESTORED AS AGREED UPON BY OWNER AND CONTRACTOR OR AS OTHERWISE O 8 00• DIRECTED BY THE APPROVING AUTHORITIES. 10. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR "x{0112 TO VERIFY - JUN.,: 00s THE LOCATION OF ALL UNDERGROUND UTILITIES, PRIOR TO BEGINNING ' �.-- `j; •� pEP'{, CONSTRUCTION. F 101.07 \ Ham- 11. WHERE REQUIRED, CONTRACTOR SHALL REMOVE ALL UNSUITABLE SOILS ARAG IN THE AREA BENEATH AND FOR 5' ON ALL SIDES OF THE S.A.S. AND EX/STING CESSPOOL i� REPLACE WITH CLEAN SAND AS SPECIFIED IN 310 CMR 255(3). TO BE PUMPED, FILLED WITH ( '� 12. AREAS REQUIRING STRIPOUT OF UNSUITABLE MATERIALS SHALL BE SAND AND ABANDONED. PLUMBING r INSPECTED BY -DESIGN ENGINEER PRIOR TO BACKFILL. BE MODIFIED TO CONNECT TO THE TO THE NEW. SEPTIC SYSTEM 13. THIS PLAN IS TO BE USED FOR SEPTIC SYSTEM PURPOSES ONLY AND NOT CONSIDERED TO BE A PROPERTY LINE SURVEY. YarmouthHeeWthDepartment74 THE ENGINEER IS NOT RESPONSIBLE FOR ANY UNDOCUMENTED SEPTIC aF APPROVED SYSTEM COMPONENTS NOT SHOWN ON THE PLAN. M t� fs s9�yG �y"a _- e� MAP ID. 60-72 o PETER T. Mc N UHL! g® R- w OPOSED SEPTIC SYSTEM UPGRADE PLAN CIVIL 01"L No. 35109 PLAN REVISION 2 4 101 POND STREET, SOUTH YARMOUTH, MA ADD CESSPOOL 'PfG/S1E� 8 IN GAR IN GARAGE I EF�X OWNER OF RECORD Prepared for: Robert B. Our Co., 24 Great Western Rd, Harwich, MA 02645 FITZPATRICK, DANIEL B (LIFE EST) Engineers: Surmyma: SCALE DRAWN JOB. NO. ( r. FITZPATRICK, MAUREEN A (LIFE EST) Engineering Works, Inc. JC Engineering, Inc. 1"=20' P.T.M. 204-22 (2 \(d 68 MAYER DRIVE 12 Weer crossfield Rood 2854 cranberry Hwy. HOLYOKE, MA 01040 Foresldole, MA 02644 E.Warehom, MA 02538 DATE CHECKED SHEET NO. (508) 477-5313 (508) 273-0377 5/27/22 P.T.M. 1 Of 2 EXISTING SEPTIC TANK PROVIDE RISERS WITH COVERS OVER INLET & OUTLET MANHOLES SET TO 6" OG FINISH GRADE. .O.F=101.6± F.G. EL.=101.0± F.G. EL.=101.0± L= 11'L=31 a S=1% (MIN.) O's =1% (M 4"SCH40 PVC 4SCH40 P' i 1 INV.=99.00 aa" uoulD LEVEL ADD GAS _ I BAFFLE INV. PROPOSED SEPTIC TANK NOTES: 1) CONTRACTOR SHALL VERIFY ALL EXISTING PIPE INVERTS, PRIOR TO INSTALLATION. 2) SEPTIC TANK & D -BOX SHALL BE SET LEVEL AND 4 TRUE TO GRADE ON A MECHANICALLY COMPACTED STABLE BASE OR OR SIX INCH AGGREGATE BASE, AS SPECIFIED. IN 310 CMR 15.221(2). 3) INSTALL INLET & OUTLET TEES AS REQUIRED, 801 4) A GAS BAFFLE SHALL BE INSTALLED ON OUTLET TEE AS MANUFACTURED BY TUF-TITE, ZABEL OR EQUAL. S DESIGN CRITERIA NUMBER OF BEDROOMS: 3 BEDROOMS SOIL TEXTURAL CLASS: CLASS I (LOADING RATE=0:74 GPC DESIGN PERCOLATION RATE: <2 MIN/IN DAILY FLOW: 330. GPD DESIGN FLOW: 330 GPD GARBAGE GRINDER: NO -not .allowed with design LEACHING AREA REQUIRED: (330 GPD) = 445.9. SF .74 GPD/SF PROPOSED SEPTIC TANK: 1500 GALLON CAPACITY PROPOSED D -BOX: 1 INLET, 1 OUTLET (MINIMUM), H-20 ALL RISER & COVER TO 6" OF GRADE F.G. EL.=101.0± L= 5' ® S=1% (MIN) 4"SCH40 PVC PROPOSED \-INV.=98.00 D -80X 3 OUTLETS H-20 INV.= 97.50 ELEV.= 98.6± ELEV.= 98.00 ELEV.= 97.50 BOTTOM ELEV.= 95.50- F NATURALLY OCCURRING PERVIOUS MATERIAL 5' (MIN.) ABOVE G.W. M OF TEST PIT, EL.=89.0 NOTE: TO PREVENT BREAKOUT, THE PROPOSED FINISH GRADE SHALL NOT BE < EL. 98.0 FOR A DISTANCE OF 15' AROUND THE PERIMETER OF THE S.A.S. PROPOSED S.A.S. INSTALL RISER & COVER OVER ONE CHAMBER AND SET TO 3" OF F.G. TO SERVE AS INSPECTION PORT F.G. EL.=101.0± VENT WIDTH = SYSTEM PROFILE 21.3' _) ;__________l' PROPOSED ; '61 S.A.S. "- N ' j L_____J 8.5' 12.8' N1 PERIMETER=75.6' BOTT.AREA=320.0 SF SAS DIMENSIONS TED SKETCH SIDEWALL AREA: 75.6'(PERIMETER LENGTH) x 2'(EFF. DEPTH) = 111.2 SF BOTTOM AREA: ..... ...................................................................... = 3 0.0 SF TOTAL AREA: ............................................... ...... ............... . ... .. .. 4T1 2 SF DESIGN FLOW PROVIDED: 0.74 GPD/SF(471.2 SF) = 348.7 GPD LEACHING SYSTEM SECTION --Y LAYER OF 1/8" TO 1/2" DOUBLE WASHED STONE (OR APPROVED FILTER FABRIC) -3/4" TO 1-1/2" DOUBLE WASHED STONE DOUBLE WASHED 2 APPROVED FILTER (3/4" TO 1-1/2" DOUBLET WASHED STONE SOIL LOG DATE: MAY 19, 2022 SOIL EVALUATOR: PETER McENTEE SE#1542 WITNESS: JAY GARDINER HEALTH AGENT ELEV. TP DEPTH 100.5 01. ILL 100.0 1, 6" LOAMY SAND 99.0 10YR 4/2 18" B LOAMY SAND 10YR 5/6 97.5 C 36" PERC 26"/44" MED. SAND 2.5Y 7/3 89.0 1 138" NO GROUNDWATER ENCOUNTERED PERC RATE: < 2 MIN./INCH J N T. 01 PROPOSED S.A.S. 2-500 GALLON CHAMBERS SURROUNDED W/4'STONE SEPTIC LAYOUT 1 -I1 -f 1_1f 11.11_ 1-11-11-11-1 =11 tt-f I f 1-f 1-f I f l -I I -f t -,1 -11.11 -f1 -1I-11-, 1 500 GALLON CAPACITY, H-20 LOADING CHAMBERS JUN 13 37" 58" PROPOSED SEPTIC SYSTEM UPGRADE PLAN 101 POND 4" KNOCKOUT Prepared for: Robert B. Our Co., 24 Great Western Rd, Harwich, MA 02645 20" RIA. COVER ✓C Engineering Inc. 2854 Cranberry Hwy. E.Wareham, MA 02538 (508) 273-0377 SCALE N.T.S. 4" KNOCKOUT O / 4" KNOCKOUT 4" KNOCKOUT JOB. NO. 204-22 DATE 5/27/22 500 GALLON CAPACITY, H-20 LOADING CHAMBERS JUN 13 37" 58" PROPOSED SEPTIC SYSTEM UPGRADE PLAN 101 POND STREET, SOUTH YARMOUTH, MA Prepared for: Robert B. Our Co., 24 Great Western Rd, Harwich, MA 02645 Engineers:Surveyors: Engineering Works, Inc. 12 West Crossfield Road Forestdale, MA 02644 (508) 477-5313 ✓C Engineering Inc. 2854 Cranberry Hwy. E.Wareham, MA 02538 (508) 273-0377 SCALE N.T.S. DRAWN P.T.M. JOB. NO. 204-22 DATE 5/27/22 CHECKED P.T.M. SHEET N0. 1 Of 2