HomeMy WebLinkAboutReview Checklist TOWN OF YARMOUTH
SEWAGE PLAN REVIEW CHECKLIST
Location: A.M.83/L Lot Zone of Contribution: In X Out Acreage
Commercial: Residential: x
Street: 20 LUE-lL F L - t fst-✓E
Village: u..) -- ..7 Floor Plan: #Bedrooms: &1-----
Owner77-tkm-& le- L(....1{ Installer: "-RD%�`t cn-'-&-
Address: Phone: Se.,2 4-t-t P , 1/
Phone:
Builder: Engineer:"3:),z4--41/4 Lt .4 L C V t C Z
Address: Phone: 'S-1,S 34 '1 G s 0
Phone:
N/A YES NO
1. Required#of copies received /
2. Date of soils exam and percolation test not older than 2 years tv
3. 4-5 ft of naturally occurring pervious material, above water table V.
4.Foundation 2 ft above high point of road H.P.: Fnd: Var.: ✓
5. Water line 10 ft from septic components Var.:
6. Benchmark indicated and shown-NGVD if near wetlands V
7. Septic tank minimum 10 ft from foundation, deck Var.: /
8. Leaching minimum 20 ft full, 15 ft crawl, 10 ft slab Var.:
9. Leaching minimum 100 ft from wetlands Var.: V
10. Leaching minimum 150 ft from drinking well/25 ft irrigation well Var.: ✓
11.Tank/leaching minimum 10 ft from property line Var.: ✓
12. System meets all other setback requirements Var.: / ---
13. Uses adjustment for maximum high groundwater Var.: ✓
14. Leaching set 4-5 ft above adj. water or bottom of test hole Var.: ✓
15. System not in top or subsoil (A,B horizons) or 5' removal V
16. Proposed contours are suitable ,/
17. System meets slope requirements-min. 1/8", '/"preferred ✓
18. System meets breakout requirements PVC liner: Wall: ✓.
19. Specified tee sizes are proper, gas baffle on outlet tee ;/� 4&----
20. Sewage is under 10,000 gpd for parcel V
21.No garbage disposal ✓
22. System adequately sized for its intended use ✓.
23. Minimum 6"stone or compacted below tank and dbox I
24. Manhole covers within 6"of grade,pump chamber cover to grade J ‘-.
25. Inspection port on plastic chambers/leach field V
26. Electrical permit for pump chamber/Separate meter for duplexes ✓
27. Pump system-2"line,weep hole,check valve,tee in dbox,pump size 7-
28.
28. Septic tank/pump chamber to be factory waterproofed ✓
29. Vent provided if leaching below 3 feet,under driveway/parking V
30. Buoyancy calculations for tank/pump chamber V
31. Engineer to inspect and certify soils: wall: commercial: ✓
32. Engineer/Registered Sanitarian and Land Surveyor stamps/signature V
33.H-20 loading is subject to vehicular traffic, groundwater I 4--
34. Title V Application and permit fee, installer signature ✓
35. Foundation footing min. 2 feet above adjusted ground water for new house ✓
36. Deed Restriction required max. #bedrooms: max. flow: gpd
37. Check area lots for groundwater/Label groundwater in Assessor's Map V
Plan reviewed by: l�f�f- 7 i I7 T�/S 6/03/03