Loading...
HomeMy WebLinkAboutReview Checklist TOWN OF YARMOUTH G SEWAGE PLAN REVIEW CHECKLIST Location: A.M. / / Lot 7c- Zone of Contribution: In_ OutAcreage Commercial: R idential: ' Street: g S / d fr- Village: Floor Plan: 1/ # Bedrooms: Owner: 14(1-07 4/til�/fGGU, Installer: 775/1 Address: Phone: Phone: Builder: TIM( Engineer: /22.-e4-1 6,-,e w Address: Phone: -3C-2-- / Phone: N/A YES NO 1. Required# of copies received 2. Date of soils exam and percolation test not older than 2 years ......----- 3. 4-5 ft of naturally occurring pervious material, above water table k.----- 4. f4. Foundation 2 ft above high point of road H.P.: Fnd: Var.: -.,-" 5. Water line 10 ft from septic components Var.: �„/ 6. Benchmark indicated and shown-NGVD if near wetlands 7. Septic tank minimum 10 ft from foundation, deck Var.: .----- 8. f8. Leaching minimum 20 ft full, 15 ft crawl, 10 ft slab Var.: ...------ 9. Leaching minimum 100 ft from wetlands Var.: 10. Leaching minimum 150 ft from drinking well/25 ft irrigation well Var.: ......----- 11. /11. Tank/leaching minimum 10 ft from property line Var.: 12. System meets all other setback requirements Var.: s.....----- 13. Uses adjustment for maximum high groundwater Var.: �-^ 14. Leaching set 4-5 ft above adj. water or bottom,of test hole„Var.: (.....---- 15. /15. System not in top or subsoil(A,B horizons) r 5' removal ✓ 16. Proposed contours are suitable L.----- 17. 17. System meets slope requirements-min. 1/8", '/"preferred �------ 18. System meets breakout requirements PVC liner:l Wall: i------.1 19. Specified tee sizes are proper, gas baffle on outlet tee i./' 20. Sewage is under 10,000 gpd for parcel l___----1 • 21. No garbage disposal (.� 22. System adequately sized for its intended use �..----- 23. Minimum 6"stone or compacted below tank and dbox l ' • 24. Manhole covers within 6"of grade, pump chamber cover to grade ✓` 25. Inspection port on plastic chambers/leach field �- 26. Electrical permit for pump chamber/Separate meter for duplexes 27. Pump system-2" line,weep hole,check valve, tee in dbox, pump size _.--- 28. Septic tank/pump chamber to be factory waterproofed 29. Vent provided if leaching below 3 feet, under driveway/parking 30. Buoyancy calculations for tank/pump chamber 31. Engineer to inspect and certify soils: wall: commercial: 32. Engineer/Registered Sanitarian and Land Surveyor stamps/signature �� 33. H-20 loading is subject to vehicular traffic, groundwater ,,---' 34. Title V Application and permit fee, installer signature 35. Foundation footing min. 2 feet above adjusted ground water for new house 36. Deed Restriction required max. #bedrooms: max. flow: gpd / 37. Check area lots for groundwater/Label groundwater in Assessor's Map / Plan reviewed by: 6/03/03