HomeMy WebLinkAboutReview Checklist TOWN OF YARMOUTH
G SEWAGE PLAN REVIEW CHECKLIST
Location: A.M. / / Lot 7c- Zone of Contribution: In_ OutAcreage
Commercial: R idential:
' Street: g S / d fr-
Village: Floor Plan: 1/ # Bedrooms:
Owner: 14(1-07 4/til�/fGGU, Installer: 775/1
Address: Phone:
Phone:
Builder: TIM( Engineer: /22.-e4-1 6,-,e w
Address: Phone: -3C-2-- /
Phone:
N/A YES NO
1. Required# of copies received
2. Date of soils exam and percolation test not older than 2 years ......-----
3. 4-5 ft of naturally occurring pervious material, above water table k.-----
4.
f4. Foundation 2 ft above high point of road H.P.: Fnd: Var.: -.,-"
5. Water line 10 ft from septic components Var.: �„/
6. Benchmark indicated and shown-NGVD if near wetlands
7. Septic tank minimum 10 ft from foundation, deck Var.: .-----
8.
f8. Leaching minimum 20 ft full, 15 ft crawl, 10 ft slab Var.: ...------
9. Leaching minimum 100 ft from wetlands Var.:
10. Leaching minimum 150 ft from drinking well/25 ft irrigation well Var.: ......-----
11.
/11. Tank/leaching minimum 10 ft from property line Var.:
12. System meets all other setback requirements Var.: s.....-----
13. Uses adjustment for maximum high groundwater Var.: �-^
14. Leaching set 4-5 ft above adj. water or bottom,of test hole„Var.: (.....----
15.
/15. System not in top or subsoil(A,B horizons) r 5' removal ✓
16. Proposed contours are suitable L.-----
17.
17. System meets slope requirements-min. 1/8", '/"preferred �------
18. System meets breakout requirements PVC liner:l Wall: i------.1
19. Specified tee sizes are proper, gas baffle on outlet tee i./'
20. Sewage is under 10,000 gpd for parcel l___----1
• 21. No garbage disposal (.�
22. System adequately sized for its intended use �..-----
23. Minimum 6"stone or compacted below tank and dbox l '
• 24. Manhole covers within 6"of grade, pump chamber cover to grade ✓`
25. Inspection port on plastic chambers/leach field �-
26. Electrical permit for pump chamber/Separate meter for duplexes
27. Pump system-2" line,weep hole,check valve, tee in dbox, pump size _.---
28. Septic tank/pump chamber to be factory waterproofed
29. Vent provided if leaching below 3 feet, under driveway/parking
30. Buoyancy calculations for tank/pump chamber
31. Engineer to inspect and certify soils: wall: commercial:
32. Engineer/Registered Sanitarian and Land Surveyor stamps/signature ��
33. H-20 loading is subject to vehicular traffic, groundwater ,,---'
34. Title V Application and permit fee, installer signature
35. Foundation footing min. 2 feet above adjusted ground water for new house
36. Deed Restriction required max. #bedrooms: max. flow: gpd /
37. Check area lots for groundwater/Label groundwater in Assessor's Map /
Plan reviewed by: 6/03/03