Loading...
HomeMy WebLinkAboutEngineer PlanALL SYSTEM SHAL SYS EM PROFILE MARKED WITHCMAGNETICTTAPE OR BE (NOT TO SCALE) COMPARABLE MEANS FOR FUTURE LOCATION. ACCESS COVERS TO WITHIN 6" OF FIN. GRADE PROVIDE INSPECTION PORT TO WITHIN 3" OF FINAL GRADE 25.0 MINIMUM .75' OF -R OVER PRECAST 2% SLOPE REQUIRED OVER SYSTEM / 2I-4� .I .I .I PRECAST H - RISERS (TYP 2'9 *23.8' EXISIING CONTOUR t0. 1500 GAL H-10 14" 23.0 X98.4] TEE SEPTIC TANK TEE 21= SLOPE OF GROUND 0" GAS BAF 4 UQ. LEVEL (ACME OR EQUAL)I; 22.6' 000000a a 000000 " ° 4 6" CRUSHED STONE OR MECHANICAL COMPACTION. (15.221 (21) (_1.3% SLOPE) (-i-% SLOPE) FOUNDATION- 15' - SEPTIC TANK 15' - *THE INSTALLER SHALL VERIFY THE LOCATIONS OF ALL UTILITIES AND ALL BUILDING SEWER OUTLETS AND ELEVATIONS PRIOR TO INSTALLING ANY PORTION OF SEPTIC SYSTEM LEGEN D ��- EXISIING CONTOUR X 99.1 EXIST. SPOT ELEV. 99 PROPOSED CONTOUR X98.4] PROPOSED SPOT EL. Q TEST HOLE 21= SLOPE OF GROUND 0" UTILITY POLE r FIRE HYDRANT NOTE NOT ALL SYMBOLS MAY APPEAR IN DRAWING TEST HOLE LOGS ENGINEER: DAVID FLAHERTY, R.S., SE2755 WITNESS: AMY VON HONE, R.S., C.H.O. DATE: DECEMBER 10, 2008 PERC. RATE _ < 2 MIN/INCH Qo I � Lac s _I of CLASS I SOILS P# \ 1 ELEV. 0" m i �g 23.0' Rfe sq 0/A/E \\\ LS S 1OYR 4/2 '0 7" B oaf \ NN \ LS 27" 1OYR 5/6 20.7' C PERC MS 1OYR 7/4 ADJ. G.W_ 16.5' 96" 15_0' 108" 14_0' 0 i O MOW OBS. WELL INFO- WELL- SDW-252 ZONE- A DATE- NOVEMBER 2008 READING- 47.4' ADJUSTMENT- 1.5' Scale: 1"= 2 0 10 40 PVC LEVEL 1ST 2' (-L-% SLOPE) - 3' - 2" DOUBLE WASHED PEASTONE OR GEOTEXTILE FABRIC 22.42', 0.92' �8 0000 4' AT SIDES 2.5' AT ENDS 3/4" TO 1 1/2" DOUBLE WASHED STONE (5) H-20 HIGH CAPACITY INFILTRATORS LEACHING FACILITY OL Qo I � Lac s _I of U �9 \ o� Y m i �g 11 Rfe sq X0401 \\\ S '0 oaf \ NN \ Ov 30 40 50 FEET \,A N �w f XISTING 3RWELLING OP OF NDN EL. 7.0' ADJ. G.W. EL. 16.5" BENCH MARK - CORN. CONC. BULKHEAD ELEVATION = 25.2 / a LOT 62 21,880± SF 202 CV N / PAVED 10 / DRIVE < 25 Qo I � Lac s _I of U �a \ o� o ° m i �g 11 Rfe sq X0401 \\\ oaf \ NN \ Ov 30 40 50 FEET 1 N 21.5 NOTES 1. DATUM IS APPROXIMATE NGVD 2. MUNICIPAL WATER IS EXISTING 3. MINIMUM PIPE PITCH TO BE 1/8" PER FOOT 4. DESIGN LOADING FOR ALL PROPOSED PRECAST UNITS TO BE AASHO H -1Q 5. PIPE JOINTS TO BE MADE WATERTIGHT. 6. CONSTRUCTION DETAILS TO BE IN ACCORDANCE WITH 310 CMR 15.000 (TITLE V.) 7. THIS PLAN IS FOR PROPOSED WORK ONLY AND NOT TO BE USED FOR LOT LINE STAKING OR ANY OTHER PURPOSE. 8. PIPE FOR SEPTIC SYSTEM TO SCH. 40-4" PVC. 9. COMPONENTS NOT TO BE BACKFILLED OR CONCEALED WITHOUT INSPECTION BY BOARD OF HEALTH AND PERMISSION OBTAINED FROM BOARD OF HEALTH. 10. CONTRACTOR SHALL BE RESPONSIBLE FOR CALLING DIGSAFE (1-888-344-7233) AND VERIFYING THE LOCATION OF ALL UNDERGROUND & OVERHEAD UTILITIES PRIOR TO COMMENCEMENT OF WORK. 11. ANY UNSUITABLE MATERIAL ENCOUNTERED SHALL BE REMOVED 5' BENEATH AND AROUND THE PROPOSED LEACHING FACILITY. 12. EXISTING LEACHING FACILITY SHALL BE PUMPED AND REMOVED OR PUMPED AND FILLED WITH CLEAN SAND. 5' REMOVAL OF UNSUITABLE SOIL REQUIRED AROUND PERIMETER OF LEACHING FACILITY, DOWN TO SUITABLE SOIL LAYER. REPLACE WITH CLEAN MED. SAND, INSTALL 96'± OF 40 MIL POLY LINER TO PREVENT. BREAKOUT / TOP BOTTOMOM EL.EL. 18. LOCUS MAP SCALE 1"=2000'± ASSESSORS MAP 149 PARCEL 75 LOCUS IS NOT WITHIN APD (ZONE II) SYSTEM DESIGN: GARBAGE DISPOSER IS NOT ALLOWED DESIGN FLOW: 4 BEDROOMS 0 110 GPD = 440 GPD USE A 440 GPD DESIGN FLOW SEPTIC TANK: 440 GPD (2) = 880 USE A 1500 GAL. SEPTIC TANK LEACHING: SIDES: 2 (10.83 + 48.75) .83 (.74) = 73.2 GPD BOTTOM 10.83 x 48.75 (.74) = 390.7 GPD TOTAL: 626.9 S.F. 463.9 GPD USE (7) H-20 HICAP INFILTRATORS WITH 2.5' STONE AT ENDS AND 4' AT SIDES APPROVED DATE BOARD OF HEALTH ✓�'S/� L� / TITLE 5 SITE PLAN 0 OF 84 HOMER'S DOCK RD. I YARMOUTH (PORT), MA PREPARED FOR I 1 v PETER KIMBALL DATE AUGUST 4, 2009 off 508-362-4541 fax 508-362-9880 downcope.com down cape engineering, iac, civil engineers /and surveyors 939 Main Street ( Rte 6A) YARMOUTNPORT MA 02675 09-188.DWG(SB TO Qo I � Lac s _I of U �a of o� o ° m i �g i Rfe sq LOCUS MAP SCALE 1"=2000'± ASSESSORS MAP 149 PARCEL 75 LOCUS IS NOT WITHIN APD (ZONE II) SYSTEM DESIGN: GARBAGE DISPOSER IS NOT ALLOWED DESIGN FLOW: 4 BEDROOMS 0 110 GPD = 440 GPD USE A 440 GPD DESIGN FLOW SEPTIC TANK: 440 GPD (2) = 880 USE A 1500 GAL. SEPTIC TANK LEACHING: SIDES: 2 (10.83 + 48.75) .83 (.74) = 73.2 GPD BOTTOM 10.83 x 48.75 (.74) = 390.7 GPD TOTAL: 626.9 S.F. 463.9 GPD USE (7) H-20 HICAP INFILTRATORS WITH 2.5' STONE AT ENDS AND 4' AT SIDES APPROVED DATE BOARD OF HEALTH ✓�'S/� L� / TITLE 5 SITE PLAN 0 OF 84 HOMER'S DOCK RD. I YARMOUTH (PORT), MA PREPARED FOR I 1 v PETER KIMBALL DATE AUGUST 4, 2009 off 508-362-4541 fax 508-362-9880 downcope.com down cape engineering, iac, civil engineers /and surveyors 939 Main Street ( Rte 6A) YARMOUTNPORT MA 02675 09-188.DWG(SB TO