HomeMy WebLinkAboutReview Checklist TOWN OF YARMOUTH
SEWAGE PLAN REVIEW CHECKLIST
Location: A.M. 11-13 Lot 6 2) Zone of Contribution: In Out ^ Acreage
Commercial: J( Residential:
Street: g38, es.A4
Village: Floor Plan: #Bedrooms:
Owner: petyLD Installer: 1i'3&-7-r1
Address: Phone:
Phone:
Builder: Engineer: CA-3› 4 A-C--
Address:
Address: Phone:
Phone:
N/A YES NO
1.Required#of copies received t,T�
2.Date of soils exam and percolation test not older than 2 years f�
3.4-5 ft of naturally occurring pervious material,above water table r/
4.Foundation 2 ft above high point of road H.P.: Fnd: Var.: V
5.Water line 10 ft from septic components Var.: +/
6.Benchmark indicated and shown-NGVD if near wetlands
7. Septic tank minimum 10 ft from foundation,deck Var.: L V
8.Leaching minimum 20 ft full, 15 ft crawl, 10 ft slab Var.: V
9.Leaching minimum 100 ft from wetlands Var.:
10.Leaching minimum 150 ft from drinking well/25 ft irrigation well Var.:
11.Tank/leaching minimum 10 ft from property line Var.: ✓
12. System meets all other setback requirements Var.:
13.Uses adjustment for maximum high groundwater Var.: __ ✓ _
14.Leaching set 4-5 ft above adj.water or bottom of test hole Var.'. V
15. System not in top or subsoil(A,B horizons)or 5'removal _
16.Proposed contours are suitable ✓
17. System meets slope requirements-min. 1/8", '4"preferred V
18. System meets breakout requirements PVC liner: Wall:
19. Specified tee sizes are proper,gas baffle on outlet tee
20. Sewage is under 10,000 gpd for parcel
21.No garbage disposal
22. System adequately sized for its intended use V
23.Minimum 6"stone or compacted below tank and dbox ✓
24.Manhole covers within 6"of grade,pump chamber cover to grade
25. Inspection port on plastic chambers/leach field
26. Electrical permit for pump chamber/Separate meter for duplexes
27.Pump system-2"line,weep hole,check valve,tee in dbox,pump size V
28. Septic tank/pump chamber to be factory waterproofed ✓
29.Vent provided if leaching below 3 feet,under driveway/parking ✓
30.Buoyancy calculations for tank/pump chamber ✓
31.Engineer to inspect and certify soils: wall: commercial: V
32.Engineer/Registered Sanitarian and Land Surveyor stamps/signature V
33.H-20 loading is subject to vehicular traffic,groundwater
34.Title V Application and permit fee,installer signature
35.Foundation footing min.2 feet above adjusted ground water for new house
36.Deed Restriction required max. #bedrooms: max. flow: gpd
37.Check area lots for groundwater/Label groundwater in Assessor's Map
Plan reviewed by. 6 oa o: