HomeMy WebLinkAboutSite Plan.69 ACCESS COVERS TO WITHIN 6" OF FIN. GRADE TOP OF FNDN EL. 9.9' ACCESS COVERS TO GRADE 9.5' MINIMUM .75' OF COVER OVER PRECAST PRECAST H-10� WATERTEST D'BOX RISERS (TYP.) 2'0 FOR LEVELNESS 7.9'f 2500 GAL H-10 10" SEPTIC TANK/ 7.23' TEE PUMP CHAMBER COMBINATION 5' LIQ. LEVEL (ACME OR El SEE DETAIL BELOW tf 8.62' 8.45' 1 48' 6" MIN. SUMP o 0 0 0 0` o 0 0 0 0 0 0 0•0 0� o 0 0 0 0 0`� 12" MIN. INT. DIM. . Op 00000pOo,� 0p 0o 0p 00000000000000000000000000000 u000000„ocio,�on000000(s�o�o„o„o,�o,coo,o. 6" CRUSHED STONE OR MECHANICAL COMPACTION. (15.221 [2]) SYSTEM PROFILE (NOT TO SCALE) 4"OSCH40 PVC PIPES LEVEL 1 ST 2' (2.5 % SLOPE) (1 % SLOPE) ( 1 % SLOPE) FACTORY WATERPROOFED FOUNDATION- 27' SEPTIC TANK 5' D' BOX 6' - *THE INSTALLER SHALL VERIFY THE LOCATIONS OF ALL UTILITIES AND ALL BUILDING SEWER OUTLETS AND ELEVATIONS PRIOR TO INSTALLING ANY PORTION OF SEPTIC SYSTEM LEGEN D 99 ____ EXISTING CONTOUR X 99. 1 EXIST. SPOT ELEV. -[99]-- PROPOSED CONTOUR [9$•4] PROPOSED SPOT EL. TH1 Y TEST HOLE 2% SLOPE OF GROUND UTILITY POLE FIRE HYDRANT NOTE NOT ALL SYMBOLS MAY APPEAR IN DRAWING TEST HOLE LOGS ENGINEER: DANIEL E. GONSALVES, SE #13587 WITNESS: MALLORY LANGLER DATE: 3/ 12/21 PERC. RATE _ < 2 MIN/INCH CLASS I SOILS Q ELEV. 1 p°' 8.5' A LS 10" 1OYR 3/1 B LS 20" 1 OYR 5/6 6 8' PERC C ACCESS FOR ROUTINE MAINTENANCE MUST BE PROVIDED FOR ZABEL FILTER. INSTALLER MUST FOLLOW ALL MANUFACTURER'S SPECIFICATIONS FOR PROPER FILTER INSTALLATION 8.39', MARK CORNERS OF (-MARK LEACHING FIELD W/ REBAR SET 4" BELOW INSPECTION PORT (SEE DETAIL) GRADE 2% SLOPE FILTER FABRIC 9.5 �P 8.74' FINISHED GRADE- 4" LOAM & SEED CLEAN FILL 4" PERFORATED PVC 3' O.C. S=0,005 - - 0 0 3/4"-1-1/2" DOUBLE WASHED 0 8" STONE LEACHING FIELD LEVEL BOTTOM 0 30.0' .74' 5.0 LEACHING 71 FACILITY ADJUSTED GROUNDWATE EL. 2.74 ALARM AND CONTROL PANEL TO BE INSTALLED INSIDE BUILDING. ALARM TO BE ON INV. IN 7.23' �J SEPARATE CIRCUIT FROM PUMP ZABEL FILTER 19" TEE FLOAT SWITCH ALARM ON OUTLET TEE W/EXTENSION SETTINGS:i:- PUMP ON 1500 GAL. MIN. 5" WORKING RANGE 6" THIS SIDE OF BAFFLE 5" 6.8' - PUMP OFF 12" MS GROUNDWATER ADJ. DATA: WELL: MIW 29 2.5Y 7/6 ZONE: A ADJUSTMENT: 1.74' (MARCH) NOTES 1. DATUM IS NAVD 88 2. MUNICIPAL WATER IS EXISTING Ow t 3. MINIMUM PIPE PITCH TO BE 1 /8" PER FOOT. e2 3 4. DESIGN LOADING FOR ALL PROPOSED PRECAST �t " -- UNITS TO BE AASHO H-LQ Cb zi Cedor v, 5. PIPE JOINTS TO BE MADE WATERTIGHT. m 6. CONSTRUCTION DETAILS TO BE IN ACCORDANCE a otn ocusa WITH 310 CMR 15.000 (TITLE 5.) o J 0 -6"DEPTH MIN. BELOW INV. n P a 8 24' 7. THIS PLAN IS FOR PROPOSED WORK ONLY AND NOT TO BE USED FOR LOT LINE STAKING OR ANY a OTHER PURPOSE. t r. o.-� Uth Shore 0 8. PIPE FOR SEPTIC SYSTEM TO SCH, 40-4" PVC. eI 9. COMPONENTS NOT TO BE BACKFILLED OR Nantucket CONCEALED WITHOUT INSPECTION BY BOARD OF Sound HEALTH AND PERMISSION OBTAINED FROM BOARD OF HEALTH. 10. CONTRACTOR SHALL BE RESPONSIBLE FOR R CALLING DIGSAFE (1-888-344-7233) AND VERIFYING THE LOCATION OF ALL UNDERGROUND & LOCUS MAP OVERHEAD UTILITIES PRIOR TO COMMENCEMENT OF WORK. SCALE 1 "=2000't PROVIDE QUICK DISCONNECT FOR PUMP 11. ANY UNSUITABLE MATERIAL ENCOUNTERED SHALL ASSESSORS MAP 34 PARCEL 126 BE REMOVED BENEATH AND 5' AROUND THE ACCESS COVERS PROPOSED LEACHING FACILITY. LOCUS IS WITHIN FEMA FLOOD ZONE AE EL. TO GRADE NOTE: 600t GAL. RESERVE 11 AS SHOWN ON COMMUNITY PANEL PROVIDED IN PC 12. EXISTING LEACHING FACILITY SHALL BE PUMPED AND REMOVED OR PUMPED AND FILLED WITH CLEAN #25001 CO589J DATED 7/16/2014 SAND. 13. ACCESS FOR ROUTINE MAINTENANCE MUST BE 2" PRESSURE LINE PROVIDED FOR ZABEL FILTER. INSTALLER MUST FOLLOW MANUFACTURER'S SPECIFICATIONS FOR PROPER FILTER SLOPE TO DRAIN BACK INSTALLATION, INSTRUCT OWNER ON MAINTENANCE. WEEP HOLES 14. INSTALLER TO VERIFY THE ELECTRICAL SYSTEM IS -CHECK VALVE SUITABLE FOR PUMP CONNECTION PRIOR TO ORDERING PUMPS. ELECTRICAL PERMIT REQUIRED. MYERS SRM 4 15. FEMA FLOOD RESISTANT FOUNDATION DESIGN AND SUBMERSIBLE 4/10 HP PUMP COMPLIANT GRADING REQUIRED. DESIGN BY OTHERS. SYSTEM (OR EQUAL) (ON BLOCK) 16. GUTTERS AND DOWNSPOUTS TO BE DIRECTED TO DRYWELLS OR ROOF DRIP LINES TO STONE TRENCHES \-- 6" BAFFLE FACTORY WATERPROOFED 2500 GAL. SEPTIC TANK/PUMP CHAMBER COMBINATION (NOT TO SCALE) o dCY) AR STREE CFG I G / G 1� ,�W o 1'07 0l � - G G .n1 11101 `4 a 0 BENCHMARK: CONC. PAD =8.85' NAVD88 C� oy� i PAVED\ DRIVE 9 O� LOT 259 0) DWG 9,395t S.F. - �..� w EXISTING DWELLING ,9 TO = 9.9' (CRAWLSPACE) M �z 17.5, 29.7, x PROPOSEDk ADDITION I (SLAB FNDN o Q u a a (� DECK ----5�`�- SHED I TH 1 N82 11 100• 0 17. ENGINEER TO INSPECT AND CERTIFY SYSTEM. MINIMUM 24 HOURS NOTICE REQUIRED. ZONING SUMMARY ZONING DISTRICT: R-25 RESIDENTIAL DISTRICT MIN. LOT SIZE 25,000 S.F. MIN. LOT FRONTAGE 150' MIN. FRONT SETBACK 30' MIN. SIDE SETBACK 15' MIN. REAR SETBACK 20' MAX. BUILDING COVERAGE 25% PROPOSED BUILDING COVERAGE 21.9% BUOYANCY CALCS: H-10 2500 GAL. ST/PC WEIGHS 24,000 LBS 6.5' x 12.0' x 2.26' x 62.4 = 11,000 LBS UP (OK) SYSTEM DESIGN. GARBAGE DISPOSER IS NOT ALLOWED DESIGN FLOW: 3 BEDROOMS @ 110 GPD = 330 GPD USE A 330 GPD DESIGN FLOW SEPTIC TANK: 330 GPD (2) = 660 USE A 2500 GAL. H-10 DUAL COMPARTMENT SEPTIC TANK/PUMP CHAMBER LEACHING: 330 GPD (.74) = 446 SF REQUIRED 15' X 30' = 450 SF OK 450 SF X .74 = 333 GPD OK USE A 15' X 30' PIPE AND STONE LEACHING FIELD MA APPROVED DATE BOARD OF HEALTH TITLE 5 SITE PLAN OF PROVIDE 46' OF 40 MILLINER AT 5' 45 CEDAR STREET OFF SAS IN AREA SHOWN. TOP AT SOUTH Y A R M O U T H, MA ELEV. 8.8', BOTTOM AT EL. 4.8't 5' REM O S TABLE SOIL REQUIRE 1 20" -1 .5' ARO�IND P I LEACHING ACILITY DOWN TO BLE S IL LAYS PLA� GROUNDWATER ENCOUNTERED AT 78" EL. 2.0 Scale: 11 "= 20' WITH CLE D. AN , TO M�T a SPECIE 110N OF�1 CMR 15.255( DICE #2 >-050 0 10 20 30 40 50 FEET 1/1&/-1,\ DATE PREPARED FOR MEYER & SONS BUILDERS, INC. t DANIEL A. OJALA, P.E., .L.S. DATE: JULY 22, 2021 EV: SEPTEMBER 16, 2021 (HEALTH COMMENTS) off 508-362-4541 I fax 508-362-9880 downcape.com down cope engineering, iac. civil engineers land surveyors 939 Main Street ( R to 6A) YARMOUTHPORT MA 02675 21-050 MEYER & SONS BLDRS.DWG