Loading...
HomeMy WebLinkAboutReview Checklist TOWN OF YARMOUTH SEWAGE PLAN REVIEW CHECKLIST Location: A.M. W Lot 72- Zone of Contribution: In Out i° Acreage Commercial: Residential: }- 51r Street: 2 /avi Fac/ Village: (dede71 ✓ Floor Plan: - #Bedrooms: Owner: (e "C I ✓ 4 � Installer: 7! 11 Address:/f/ %/4'i ri / .:/.4 .W,1 Phone: Phone: -3-7/r---2 S.- X1.2. Builder: 5-72-t4/-e Engineer: bc(c_ r, Address: Phone: 5.--i - 7 7 W/ Phone: N/A YES / NO 1.Required# of copies received V 2. Date of soils exam and percolation test not older than 2 years i 3. 4-5 ft of naturally occurring pervious material, above water table 4.Foundation 2 ft above high point of road H.P.: Fnd: Var.: i., 5. Water line 10 ft from septic components Var.: ;_.„7, 6. Benchmark indicated and shown-NGVD if near wetlands 7. Septic tank minimum 10 ft from foundation, deck Var.: 8. Leaching minimum 20 ft full, 15 ft crawl, 10 ft slab Var.: 9. Leaching minimum 100 ft from wetlands Var.: 10. Leaching minimum 150 ft from drinking well/25 ft irrigation well Var.: 11. Tank/leaching minimum 10 ft from property line Var.: 12. System meets all other setback requirements Var.: 13. Uses adjustment for maximum high groundwater Var.: , 14. Leaching set 4-5 ft above adj. water or bottom of test hole Var.: _ 15. System not in top or subsoil(A,B horizons)or 5' removal ' _. 16.Proposed contours are suitable 17. System meets slope requirements-min. 1/8", '/4"preferred _- 18. System meets breakout requirements PVC liner: Wall: _ 19. Specified tee sizes are proper, gas baffle on outlet tee • 20. Sewage is under 10,000 gpd for parcel 21.No garbage disposal 22. System adequately sized for its intended use ;/J -23.Minimum 6"stone or compacted below tank and dbox 1/4------- 24. ,�'24.Manhole covers within 6"of grade,pump chamber cover to grade 25. Inspection port on plastic chambers/leach field \c -- 26. �26. Electrical permit for pump chamber/Separate meter for duplexes _ 27. Pump system-2" line,weep hole,check valve,tee in dbox,pump size Y 28. Septic tank/pump chamber to be factory waterproofed ,✓ 29. Vent provided if leaching below 3 feet, under driveway/parking 30. Buoyancy calculations for tank/pump chamber 31. Engineer to inspect and certify soils: wall: commercial: 32. Engineer/Registered Sanitarian and Land Surveyor stamps/signature Nr 33. H-20 loading is subject to vehicular traffic, groundwater 34. Title V Application and permit fee, installer signature l..-- - 35. Foundation footing min. 2 feet above adjusted ground water for new house 36. Deed Restriction required max. #bedrooms: max. flow: gpd Y 37. Check area lots for groundwater/Label groundwater in Assessor's Map 1/ Plan reviewed by: _ 6/03/03