Loading...
HomeMy WebLinkAboutReview Checklist TOWN OF YARMOUTH SEWAGE PLAN REVIEW CHECKLIST // Location: A.M. 13 3 Lot t 3 7 Zone of Contribution: In Out_/ Acreage Si b b� "�?, Commercial: Residential: Street: a 12 3 Z ) i 5 (c r" Aft) Village: Floor Plan: #Bedrooms: 3 Owner: Co-`/- e/t..) Ccu rtyve -_ Installer: Dv c Address: ( Phone: Phone: Builder: Engineer: L-2. . C L' n.), 's.i ce,ikj Address: Phone: Phone: N/A YES NO 1. Required#of copies received 2.Date of soils exam and percolation test not older than 2 years 3.4-5 ft of naturally occurring pervious material,above water table 1✓ 4.Foundation 2 ft above high point of road H.P.: Fnd: Var.: ,./.- 5. ,/5.Water line 10 ft from septic components Var.: t/ ' 6.Benchmark indicated and shown-NGVD if near wetlands 7. Septic tank minimum 10 ft from foundation, deck Var.: 8. Leaching minimum 20 ft full, 15 ft crawl, 10 ft slab Var.: 1 9. Leaching minimum 100 ft from wetlands Var.: 1 . 10.Leaching minimum 150 ft from drinking well/25 ft irrigation well Var.: 11.Tank/leaching minimum 10 ft from property line Var.: I/ / 12. System meets all other setback requirements Var.: 13. Uses adjustment for maximum high groundwater Var.: (./ 14.Leaching set 4-5 ft above adj. water or bottom of test hole Var.: 15. System not in top or subsoil(A,B horizons)or 5' removal 16.Proposed contours are suitable 17. System meets slope requirements-min. 1/8", i/"preferred 18. System meets breakout requirements PVC liner: Wall: ` -•_ 19. Specified tee sizes are proper, gas baffle on outlet tee LZ---' 20. Sewage is under 10,000 gpd for parcel v--------,-.'21.No garbage disposal l!__ _,../ - 22. System adequately sized for its intended use V 23.Minimum 6"stone or compacted below tank and dbox V 24. Manhole covers within 6"of grade,pump chamber cover to grade 25. Inspection port on plastic chambers/leach field 26. Electrical permit for pump chamber/Separate meter for duplexes r :., 27.Pump system-2"line,weep hole,check valve,tee in dbox,pump size 28. Septic tank/pump chamber to be factory waterproofed 29. Vent provided if leaching below 3 feet,under driveway/parking 30.Buoyancy calculations for tank/pump chamber 31. Engineer to inspect and certify soils: wall: commercial: 32. Engineer/Registered Sanitarian and Land Surveyor stamps/signature �/. 33.H-20 loading is subject to vehicular traffic, groundwater 34.Title V Application and permit fee,installer signature z 1/4------" 35.Foundation footing min. 2 feet above adjusted ground water for new house 36.Deed Restriction required max. #bedrooms: max. flow: gpd ,\.....2.- 37. - 37. Check area lots for groundwater/Label groundwater in Assessor's Map Plan reviewed by. 6 0.3 0 i'- .- c). z