Loading...
HomeMy WebLinkAboutReview Checklist TOWN OF YARMOUTH 7,-5.2.--1 SEWAGE PLAN REVIEW CHECKLIST //, Location: A.M. "g Lot /9 Zone of Contribution: In Le Out____ Acreage // 7/c - Commercial: Residential: u Street: /' 76c, Floor Plan: �.„.../- # Bedrooms: Owner: /KG /..t/ Ale,77- Installer: C/L�LG( Ci �,�✓��f1Jl�� 7 Address: Phone: ca" -39$7_ 1//to Phone: Builder: Engineer: or-05 ` ,- Address: Phone: 5 --(f S- 1 Phone: N/A YES NO 1. Required#of copies received _IIIM 2. Date of soils exam and percolation test not older than 2 years 3. 4-5 ft of naturally occurring pervious material, above water table 4. Foundation 2 ft above high point of road H.P.: Fnd: Var.: •__, IM 5. Water line 10 ft from septic components Var.: L.._-- 6. Benchmark indicated and shown-NGVD if near wetlands C 7. Septic tank minimum 10 ft from foundation, deck Var.: 8. Leaching minimum 20 ft full, 15 ft crawl, 10 ft slab Var.: 1 k-,---- 9. �� 9. Leaching minimum 100 ft from wetlands Var.: 10. Leaching minimum 150 ft from drinking well/25 ft irrigation well Var.: 11. Tank/leaching minimum 10 ft from property line Var.: 12. System meets all other setback requirements Var.: 13. Uses adjustment for maximum high groundwater Var.: 14. Leaching set 4-5 ft above adj. water or bottom of test hole Var.: 15. System not in top or subsoil(A,B horizons)or 5' removal 16. Proposed contours are suitable 17. System meets slope requirements-min. 1/8", 1/4"preferred 18. System meets breakout requirements PVC liner: Wall: 19. Specified tee sizes are proper, gas baffle on outlet tee 20. Sewage is under 10,000 gpd for parcel 21.No garbage disposal _IMIll 22. System adequately sized for its intended use 23. Minimum 6"stone or compacted below tank and dbox 24.Manhole covers within 6"of grade, pump chamber cover to i ade -,...-- 25. Inspection port on plastic chambers/leach field 26. Electrical permit for pump chamber/Separate meter for duplexes - 27.Pump system-2" line,weep hole,check valve, tee in dbox,pump size __ 28. Septic tank/pump chamber to be factory waterproofed 29. Vent provided if leaching below 3 feet, under driveway/parkin. 30. Buoyancy calculations for tank/pump chamber Mill 31. Engineer to inspect and certify soils: wall: commercial: 32. Engineer/Registered Sanitarian and Land Surveyor stamps/signature IM _---- 33. H-20 loading is subject to vehicular traffic, groundwater 34. Title V Application and permit fee, installer signature .---- 35. Foundation footing min. 2 feet above adjusted ground water for new house ..--'" 36. Deed Restriction required max. #bedrooms: 7 max. flow: , gpd 37. Check area lots for groundwater/Label groundwater in Assessor's Map\ i Plan reviewed by: :s fi4.- 6/03/03