HomeMy WebLinkAboutJ5951 Dennis Yarmouth Middle School WE 2022-06-24Summary Report #55 June 27, 2022 Attn: Job No: 5951 Job Name:Dennis Yarmouth Middle School 296 Station Ave South Yarmouth, MA 02664 Permit No.:BLD-21-006153 TESTING INSPECTION ENGINEERING GK 12 Tech Circle, Natick, MA 01760 | (617) 938-3774 office | (617) 344-0478 fax Southern California New England Arizona Texas New York Miami June 20, 2022 Roney Nakhoul reported to Marcus Glynn with Fenagh at the shop in South Yarmouth, MA. Performed engineering misc. inspection. See attached. The work observed was, to the best of Roney's knowledge, in accordance with the approved plans, specifications and applicable standards of workmanship. June 21, 2022 Roney Nakhoul reported to Jon Pope with PMA at the jobsite. Performed engineering misc. inspection. See attached. Kyle Godek reported to Nicholas Hull with PMA at the jobsite. Performed window air leak test inspection. See attached. The work observed was, to the best of Kyle's, Roney's knowledge, in accordance with the approved plans, specifications and applicable standards of workmanship. Laboratory test results are enclosed if testing was done during the period covered by this report. Limitations: These inspections were performed in accordance with requirements, but please note this report shall not be relied upon by others, as acceptance or guarantee of the work. Even with diligent inspection techniques, the contractor is solely liable for defects or failures to adhere to the code. Reviewed by: Jillian Kass Staff Engineer 07-01-2022 Date TESTING INSPECTION ENGINEERING GK 12 Tech Circle, Natick, MA 01760 | (617) 938-3774 office | (617) 344-0478 fax Southern California New England Arizona Texas New York Miami Technical Contact: Bruce Tie, Engineering Manager (btie@fenaghengineering.com) Administrative Contact: Gaby Kass (Gkass@fenaghengineering.com) cc:Fenagh PM – emushi@fenaghengineering.com (email) Fenagh Technical Reviewer – btie@fenaghengineering.com (email) TESTING INSPECTION ENGINEERING Project No: 5951 Project Name: Dennis Yarmouth Middle School Project Location: 296 Station Ave, South Yarmouth, MA, 02664 Fenagh Representative: Roney Nakhoul Inspection Type: Engineering Inspection Pg. 1 of 1 June 20, 2022 Time In: 10:00 Break: 12:00-12:30 Time Out: 16:30 DFR ID: 38123 Weather: Sunny Temperature: 70°F Permit No. : BLD-21-006153 Plans Dated: N/A Conformance: The Work observed was, to the best of my knowledge, in accordance with the approved plans, specifications and applicable standards of workmanship. Limitations:These inspections were performed in accordance with requirements, but please note this report shall not be relied upon by others, as acceptance or guarantee of the work. Evenwith diligent inspection techniques, the contractor is solely liable for defects or failures to adhere to the code. Information provided herein has not been reviewed by supervisory staff,therefore, should be considered preliminary and subject to change, unless signed by both inspector and engineer below. Reviewed by: Roney Nakhoul Inspector 06-20-2022 Date Jillian Kass Staff Engineer 06-22-2022 Date 12 Tech Circle, Natick, MA 01760 | (617) 938-3774 office | (617) 344-0478 fax Southern California New England Arizona Texas New York Miami Roney Nakhoul reported to Marcus Glynn with Fenagh at the shop in South Yarmouth, MA. Assembled window testing frames for two windows. TESTING INSPECTION ENGINEERING Project No: 5951 Project Name: Dennis Yarmouth Middle School Project Location: 296 Station Ave, South Yarmouth, MA, 02664 Fenagh Representative: Roney Nakhoul Inspection Type: Engineering Inspection Pg. 1 of 1 June 21, 2022 Time In: 10:00 Break: 12:00-12:30 Time Out: 19:00 DFR ID: 38120 Weather: Sunny Temperature: 70°F Permit No. : BLD-21-006153 Plans Dated: 02/02/2021 Conformance: The Work observed was, to the best of my knowledge, in accordance with the approved plans, specifications and applicable standards of workmanship. Limitations:These inspections were performed in accordance with requirements, but please note this report shall not be relied upon by others, as acceptance or guarantee of the work. Evenwith diligent inspection techniques, the contractor is solely liable for defects or failures to adhere to the code. Information provided herein has not been reviewed by supervisory staff,therefore, should be considered preliminary and subject to change, unless signed by both inspector and engineer below. Reviewed by: Roney Nakhoul Inspector 06-21-2022 Date Jillian Kass Staff Engineer 06-22-2022 Date 12 Tech Circle, Natick, MA 01760 | (617) 938-3774 office | (617) 344-0478 fax Southern California New England Arizona Texas New York Miami Roney Nakhoul reported to Jon Pope with PMA at the jobsite. Building D North wall window measuring 93x96" was tested for air and water infiltration per ASTM E 783 and E 1105 at the parameters given from the project specifications. Report and photograph are attached. Additional Notes: This window met the test parameters. Referenced Details: Project specifications and architectural plans. Project submittals. WINDOW TESTING REPORT Project: Dennis Yarmouth Middle School Report Number: Project Address: 296 Station Ave South Yarmouth 02664 Client: PMA Consultants Date of Site Visit: 06-21-2022 Report Date: 06-21-2022 Purpose of Visit: Fenestration Field Air Leakage Resistance and Water Penetration Resistance Testing On-Site During Visit: Roney Nakhoul, Kyle Godek Report By: Roney Nakhoul Introduction: Fenestration water penetration resistance testing was performed as requested by the client. Windows were selected at random by client. Testing was performed using an internal test chamber on a pass / fail basis. See procedure for more details. Procedure: Air Leakage Resistance Air Leakage resistance testing was performed in accordance with ASTM E783-02: “Standard Test Method for Field Measurement of Air Leakage Through Installed Exterior Windows and Doors”, with respect to AAMA 502-12: “Voluntary Specification for Field Testing of Newly Installed Fenestration Products”. Water Penetration Resistance Water penetration resistance testing was performed in accordance with ASTME 1105-00: “Test Method for Field Determination of Water Penetration of Installed Exterior Windows, Skylights, Doors, and Curtain Walls, by Uniform or Cyclic Static Air Pressure Difference”, with respect to AAMA 502-12: “Voluntary Specification for Field Testing of Newly Installed Fenestration Products”, Procedure A and B. Procedure A (ASTM E 1105-00, Section 12.1) - A uniform static differential pressure is applied across the fenestration within 15 seconds and maintain this pressure, along with the specified rate of water spray for 15 minutes. Procedure B (ASTM E 1105-00, Section 12.2.2, 3 &4) - "Apply the specified static air pressure difference across the test specimen promptly and maintain this pressure, along with the specified rate of water spray, for the period of time stipulated by the specification or the specifier. Unless otherwise specified, the duration of the pressure cycle shall be 5 minutes." Per Section12.2.3, "While maintaining the water spray, reduce the air pressure difference to zero for a period of not less than 1 minute." Per Section 12.2.4, "Repeat the preceding two steps for the specified number of cycles. In no case, however, shall the total time of pressure application be less than 15 minutes. Massachusetts - 12 Tech Circle | Natick, MA 01760 | Phone (617) 938-3774 | Fax (617) 344-0478 California - 9070 Center Avenue | Rancho Cucamonga, CA 91730 | Phone (909 587-6374 New York – 54-21 73rd Place | Maspeth, NY 11378 | Phone (515) 787-3333 WINDOW TESTING REPORT Conformance Criteria: Air leakage resistance tests shall be conducted at a uniform cyclic test pressure of 1.57 psf. The maximum allowable rate of air leakage shall not exceed 0.09 cfm/ft2 Water penetration resistance tests shall be conducted at a static test pressure of 6.24 PSF. No water penetration shall occur as defined in ASTM E1105-00, Section 3.2.3. (Per project specification 08 4113 3.5 as provided by PMA) ASTM E 1105-00, Section3.2.3, defines water penetration as “penetration of water beyond a plane parallel to the glazing (the vertical plane) intersecting the innermost projection of the test specimen, not including interior trim and hardware, under the specified conditions of air pressure difference across the specimen”. Any such water penetration shall constitute failure of the water penetration resistance test. Water penetrating through the perimeter frame of the specimen shall also constitute failure. Water contained within drained flashing, gutters, and sills shall not constitute failure On-Site Results: Weather Temperature 75°F Wind Speed 0-2mph Wind Direction varied Barometric Pressure 29.90 in Hg Weather Sunny Test #1: Location Building D, North Elevation Unit Type Unit Dimensions 93x96 Test Pressure Water at 10.0 PSF Photos See attached Massachusetts - 12 Tech Circle | Natick, MA 01760 | Phone (617) 938-3774 | Fax (617) 344-0478 California - 9070 Center Avenue | Rancho Cucamonga, CA 91730 | Phone (909 587-6374 New York – 54-21 73rd Place | Maspeth, NY 11378 | Phone (515) 787-3333 WINDOW TESTING REPORT Test #1: Air Leakage Resistance Testing (ASTM E 783) Time of Test 2:00 PM Date of Test 06-21-2022 Extraneous Air Leakage (with plastic sheeting) 29 scfm Total Air Flow (no exterior plastic sheeting) 29 scfm Net Airflow 0 scfm Air Infiltration Rate 0 cfm Maximum Allowable Air Infiltration Rate 0.09 cfm/ft^2 Results Meets conformance criteria of ASTM E783 Test #1: Water Penetration Resistance Testing (ASTM E 1105) Time of Test 2:30 PM Date of Test 06-21-2022 Differential Pressure (psf) Duration (min.) Results 6.24 15 minutes Spray Rack continuously applied water to the exterior face of the fenestration product, with interior chamber at constant differential pressure of 6.24 psf. - - - 6.24 15 minutes complete The chamber was removed and no water was observed. Test pass. Massachusetts - 12 Tech Circle | Natick, MA 01760 | Phone (617) 938-3774 | Fax (617) 344-0478 California - 9070 Center Avenue | Rancho Cucamonga, CA 91730 | Phone (909 587-6374 New York – 54-21 73rd Place | Maspeth, NY 11378 | Phone (515) 787-3333 WINDOW TESTING REPORT Results Summary: Air leakage testing per ASTM E783-02 met the parameters set out in the project specifications and AAMA 502 for this fenestration type. Water leakage was tested per ASTM E1105. Differential air pressure was maintained within the capsule at 6.24 PSF and water spray delivery at 5.0 U.S. gal/ft^2/hour for the duration of the test period. The capsule was sealed to the window rough opening interior framing all around. No Water leakage was observed during the 15 minute test period. This window has passed ASTM E1105 testing, procedure A, following AAMA 502-12 standards. Work observed was, to the best of my knowledge, in conformance with: • Attached test parameters • ASTM E1105, E331, & E547 • AAMA 502, ANSI/AAMA/NWWDA 101/I.S.2-97 Limitations: These inspections were performed in accordance with requirements, but please note this report shall not be relied upon by others as acceptance or guarantee of the work. Even with diligent inspection techniques, the contractor is solely liable for defects or failures to adhere to the code. Information provided herein has not been reviewed by supervisory staff, therefore, should be considered preliminary and subject to change, unless signed by both inspector and engineer below. Roney Nakhoul Staff Engineer Massachusetts - 12 Tech Circle | Natick, MA 01760 | Phone (617) 938-3774 | Fax (617) 344-0478 California - 9070 Center Avenue | Rancho Cucamonga, CA 91730 | Phone (909 587-6374 New York – 54-21 73rd Place | Maspeth, NY 11378 | Phone (515) 787-3333 TESTING INSPECTION ENGINEERING Project No: 5951 Project Name: Dennis Yarmouth Middle School Project Location: 296 Station Ave, South Yarmouth, MA, 02664 Fenagh Representative: Roney Nakhoul June 21, 2022 Permit No. : TESTING INSPECTION ENGINEERING Project No: 5951 Project Name: Dennis Yarmouth Middle School Project Location: 296 Station Ave, South Yarmouth, MA, 02664 Fenagh Representative: Roney Nakhoul June 21, 2022 Permit No. : TESTING INSPECTION ENGINEERING Project No: 5951 Project Name: Dennis Yarmouth Middle School Project Location: 296 Station Ave, South Yarmouth, MA, 02664 Fenagh Representative: Roney Nakhoul June 21, 2022 Permit No. : TESTING INSPECTION ENGINEERING Project No: 5951 Project Name: Dennis Yarmouth Middle School Project Location: 296 Station Ave, South Yarmouth, MA, 02664 Fenagh Representative: Roney Nakhoul June 21, 2022 Permit No. : TESTING INSPECTION ENGINEERING Project No: 5951 Project Name: Dennis Yarmouth Middle School Project Location: 296 Station Ave, South Yarmouth, MA, 02664 Fenagh Representative: Kyle Godek Inspection Type: Window Air leak Test Pg. 1 of 1 June 21, 2022 Time In: 08:30 Break: 12:00-12:30 Time Out: 17:30 DFR ID: 38114 Weather: Sunny Temperature: 68°F Permit No. : BLD-21-006153 Plans Dated: N/A Conformance: The Work observed was, to the best of my knowledge, in accordance with the approved plans, specifications and applicable standards of workmanship. Limitations:These inspections were performed in accordance with requirements, but please note this report shall not be relied upon by others, as acceptance or guarantee of the work. Evenwith diligent inspection techniques, the contractor is solely liable for defects or failures to adhere to the code. Information provided herein has not been reviewed by supervisory staff,therefore, should be considered preliminary and subject to change, unless signed by both inspector and engineer below. Reviewed by: Kyle Godek Inspector 06-21-2022 Date Jillian Kass Staff Engineer 06-22-2022 Date 12 Tech Circle, Natick, MA 01760 | (617) 938-3774 office | (617) 344-0478 fax Southern California New England Arizona Texas New York Miami Kyle Godek reported to Nicholas Hull with PMA at the Job Site. See Roney Nakhoul's report for more information. J5951 - Dennis Yarmouth Middle School - Exception Log Pages 1 of 5 NCR ID#Date Location Inspector Issue RFI/ Submittal No.Resolved? (Y/N)Sub/ Contractor Date Resolved Comment 1 7/21/2021 Wall : C /d3 Arsene Ntwali Low break: Mix Desing 3500D, design strength of 3500 psi at 28 days, specified slump from 4 to 6 in., specified air content from 4.5% to 7.5% Y Marguerite Tuesday, January 18, 2022 12:53 PM EOR to Advise 7 day break 08/10/2021 Set 1 = 1,860 psi 28 day break 08/31/2021 Set 1 = 2,800 psi Set 1 = 2,900 psi Set 1 = 3,480 psi 28 day average = 3,060 psi 2 7/28/2021 Footing : C16/E Arsene Ntwali Low break: Mix Desing 3500D, design strength of 3500 psi at 28 days, specified slump from 4 to 6 in., specified air content from 4.5% to 7.5% : Lab Log No.: 15519 (2744-2745) Y Marguerite Tuesday, January 18, 2022 12:53 PM EOR to Advise 28 day break 08/25/2021 Set 1 = 3,370 psi Set 1 = 3,500 psi Set 1 = 3,650 psi 3 7/30/2021 Footings Set # 1 :Column line/Row: D.3/c116 Set # 2 Columm line / Row c5/H Arsene Ntwali Low break: Mix Desing 3500D, design strength of 3500 psi at 28 days, specified slump from 4 to 6 in., specified air content from 4.5% to 7.5% Y Marguerite Tuesday, January 18, 2022 12:53 PM EOR to Advise 28 day break 08/27/2021 Set 1 = 3,070 psi Set 1 = 3,330 psi Set 1 = 3,430 psi Set 2 = 3,330 psi Set 2 = 3,520 psi Set 2 = 3,580 psi 56 day break 09/24/2021 Set # 1 = 3,720 psi Set #2 = 3,670 psi 4 8/3/2021 Footings: Elevator pit foundation Arsene Ntwali Low break: Mix Desing 3500D, design strength of 3500 psi at 28 days, specified slump from 4 to 6 in., specified air content from 4.5% to 7.5% Y Marguerite Tuesday, January 18, 2022 12:53 PM EOR to Advise 7 day break 08/10/2021 Set 1 = 2,610 psi 28 day break 08/31/2021 Set 1 = 3,170 psi 56 day break 9/28/2021 Set 1 = 3,330 psi Set 1 = 3,490 psi Set 1 = 3,700 psi 56 day average set 1 = 3,510 psi 5 8/6/2021 Level 1 Wall at Building C and B - E/c2 Arsene Ntwali Low break: Mix Desing 3500D, design strength of 3500 psi at 28 days, specified slump from 4 to 6 in., specified air content from 4.5% to 7.5% Y Marguerite Tuesday, January 18, 2022 12:53 PM EOR to Advise 7 day break 08/13/2021 Set 1 = 2,980 psi 28 day break 09/3/2021 Set 1 = 3,170 psi 56 day break 10/8/2021 Set 1 = 3,230 psi Set 1 = 3,400 psi 6 8/6/2021 Level 1 Wall at Building C and B - J.7/b25 Arsene Ntwali Low break: Mix Desing 3500D, design strength of 3500 psi at 28 days, specified slump from 4 to 6 in., specified air content from 4.5% to 7.5% Y Marguerite Tuesday, January 18, 2022 12:53 PM EOR to Advise 7 day break 08/13/2021 Set 2= 2,390 psi 28 day break 09/03/2021 Set 2 = 3380 psi 56 day break 10/01/2021 Set 2 = 3710 psi 7 8/13/2021 Level 1 Footings at Building B: P.1/b33 Arsene Ntwali Low break: Mix Desing 3500D, design strength of 3500 psi at 28 days, specified slump from 4 to 6 in., specified air content from 4.5% to 7.5% Y Marguerite Tuesday, January 18, 2022 12:53 PM EOR to Advise 17 day break 08/30/2021 Set 1 = 3,090 psi 28 day break 09/10/2021 Set 1 = 3,460 psi Set 1 = 3,510 psi 56 day break 10/08/2021 Set 1 = 3760 psi Set 1 = 3850 psi 8 8/13/2021 Level 1 Footings at Building B: J.3/b24 Arsene Ntwali Low break: Mix Desing 3500D, design strength of 3500 psi at 28 days, specified slump from 4 to 6 in., specified air content from 4.5% to 7.5% Y Marguerite Tuesday, January 18, 2022 12:53 PM EOR to Advise 7 day break 08/20/2021 Set 2 = 2,320 psi 28 day break 09/10/2021 Set 2 = 2,840 psi 56 day break 10/08/2021 Set 2 = 3030 psi Set 2 = 3260 psi Set 2 = 3150 psi J5951 - Dennis Yarmouth Middle School - Exception Log Pages 2 of 5 9 8/20/2021 Level 1 Footings at Foundation: Wall: H/c5 Arsene Ntwali Low break: Mix Desing 3500D, design strength of 3500 psi at 28 days, specified slump from 4 to 6 in., specified air content from 4.5% to 7.5% : Lab Log No.: 15860 (3024) Y Marguerite Tuesday, January 18, 2022 12:53 PM EOR to Advise 7 day break 08/27/2021 Set 1 = 2,810 psi 28 day break 09/17/2021 Set 1 = 3,440 psi Set 1 = 3,500 psi 56 day break 10/15/2021 Set 1 = 3,920 psi Set 1 = 4,020 psi 10 9/3/2021 Level 1 Wall; U/a5 Arsene Ntwali Low break: Mix Desing 3500D, design strength of 3500 psi at 28 days, specified slump from 4 to 6 in., specified air content from 4.5% to 7.5% ; Lab Log No.: 16067 (3123) Y Marguerite Tuesday, January 18, 2022 12:53 PM EOR to Advise 7 day break 09/10/2021 Set 1 = 2,050 psi 28 day break 10/01/2021 Set 1 = 3,100 psi 56 day break 10/29/2021 Set 1 = 3,510 psi Set 1 = 3,630 psi Set 1 = 3,660 psi 11 9/9/2021 Level 1 Footing: M.5/b17 Arsene Ntwali Low break: Mix Desing 3500D, design strength of 3500 psi at 28 days, specified slump from 4 to 6 in., specified air content from 4.5% to 7.5% ; Lab Log No.: 16132 (3175) Y Marguerite Tuesday, January 18, 2022 12:53 PM EOR to Advise 7 day break 09/16/2021 Set 1 = 2,400 psi 28 day break 10/07/2021 Set 1 = 3,480 psi Set 1 = 3,490 psi 56 day break 11/04/2021 Set 1 = 4,050 psi Set 1 = 4,240 psi 12 9/10/2021 Level 1 Footing: L.9/b2 Arsene Ntwali Low break: Mix Desing 3500D, design strength of 3500 psi at 28 days, specified slump from 4 to 6 in., specified air content from 4.5% to 7.5% ; Lab Log No.: 16133 (3176) Y Marguerite Tuesday, January 18, 2022 12:53 PM EOR to Advise 7 day break 09/17/2021 Set 1 = 2,330 psi 28 day break 10/08/2021 Set 1 = 3,450 psi Set 1 = 3,450 psi Set 1 = 3,490 psi 56 day break 11/05/2021 Set 1 = 4,060 psi 13 8/13/2021 Level 1 Footings at Building B: Set # 1 P.1/b33 Set # 2 J.3/b24 Arsene Ntwali Low break: Mix Desing 3500D, design strength of 3500 psi at 28 days, specified slump from 4 to 6 in., specified air content from 4.5% to 7.5% ; Lab Log No.: 15745 (2945-2946) Y Marguerite Tuesday, January 18, 2022 12:53 PM EOR to Advise 7 day break 08/20/2021 Set 2 = 2,320 psi 28 day break 09/10/2021 Set 1 = 3,460 psi Set 1 = 3,510 psi Set 2 = 2,840 psi 56 day break 10/08/2021 Set 1 = 3,760 psi Set 1 = 3,850 psi Set 2 = 3,260 psi Set 2 = 3,030 psi Set 2 = 3,150 psi Set 2 = 3,260 psi 14 8/17/2021 Level 1 Footings at Building B: S.1/b27 Arsene Ntwali Low break: Mix Desing 3500D, design strength of 3500 psi at 28 days, specified slump from 4 to 6 in., specified air content from 4.5% to 7.5% ; Lab Log No.: 15745 (2945-2946) Y Marguerite Tuesday, January 18, 2022 12:53 PM EOR to Advise 7 day break 08/24/2021 Set 1 = 2,510 psi 28 day break 09/14/2021 Set 1 = 3,280 psi Set 1 = 3,430 psi 56 day break 10/12/2021 Set 1 = 4,070 psi Set 1 = 4,110 psi 15 9/23/2021 Level 1 Footings at Building B: P7/a18 Arsene Ntwali Low break: Mix Desing 5000D, design strength of 5,000 psi at 28 days, specified slump from 5 to 8 in., specified air content from 4% to 7% ; Lab Log No.: 16288 (3264) Y Marguerite Tuesday, January 18, 2022 12:53 PM EOR to Advise 7 day break 09/30/2021 Set 1 = 3,510 psi 28 day break 10/21/2021 Set 1 = 4,470 psi 56 day break 11/18/2021 Set 1 = 4,880 psi Set 1 = 5,120 psi Set 1 = 5,210 psi 16 11/2/2021 Level 1 Slab at Building D: Line A-D1, Row D1-before D16 Enea Mushi Measured Floor Flatness, Levelness (34.7 and 18.3) did not meet overall project requirement (35 and 25)N Marguerite Tuesday, January 18, 2022 12:53 PM EOR to Advise J5951 - Dennis Yarmouth Middle School - Exception Log Pages 3 of 5 17 9/27/2021 Level 1 Wall at Q-P.7/a18, a18-24/W D17 : Sampled @ N.4/b5 Arsene Ntwali Low break: Mix Desing 5000D, design strength of 5,000 psi at 28 days, specified slump from 5 to 8 in., specified air content from 4% to 7% ; Lab Log No.: 16339 (3323) Y Marguerite Tuesday, January 18, 2022 12:53 PM EOR to Advise 7 day break 10/04/2021 Set 1 = 3,510 psi 28 day break 10/25/2021 Set 1 = 4,170 psi 56 day break 11/22/2021 Set 1 = 4,700 psi 90 day break 12/26/2021 Set 1 = 5470 psi Set 1 = 5070 psi 18 12/16/2021 Level 1, area A @ S.1-S.5/b11 bottoms only: Level 16 @ K.9-N/b33 steel girts: Level low roof/high roof @ N.9-K/b1, K/b1-b22, L+P.7/a17-b21, LP.7/a17+b21, V-V.9/a15, W/a1-a14, W-V/a1, V/a1-a2, V-U/a2 Tony Paradis WPSs not available for review for Stellar Steel Erectors or United Steel. Stellar Steel Used FCAW process in the 2F, 4F, 2G and 3G possitions. United Steel used the SMAW process in the 2F possition. rnWPQRs recieved for Stellar Steel Erectors show no welders qualified for FCAW welds in the 4F or 3G positions. N PMA EOR to Advise 19 12/17/2021 top and bottom plates Tony Paradis Contractor has failed to maintain 3/4" minimum distance from screw to edge of light gauge surfaces as called for in General Note 4 on SK-3.Y PMA Wed 3/9/2022 12:46 PM EOR to Advise 20 11/18/2021 Level 1 Metal pan stairs at Building D Arsene Ntwali Low Break : Mix #: 4000DGRNA : Slump 5-9 air 0-3 Design Strength (psi): 4,000 @28 days : Lab Log No.: 17282 (3681)N PMA EOR to Advise 7 day break 11/25/2021 Set 1 = 2,060 psi 28 day break 12/16/2021 Set 1 = 2,580 psi 56 day break 01/13/2022 Set 1 = 3,220 psi 90 day break 02/16/2022 Set 1 = 3,350 psi 21 12/21/2021 locations at building A and B Blake Mullens The items as listed herein have not been accomplished in accordance with the approved documents, plans and specifications: No. 10 screw missing at inside leg of track connections. Contractor to install inside leg no 10 screws with lift access. Pins at typical parapet detail within this area not spaced properly. Pins installed at random locations instead of 5 pins within top 2" and 4 pins within bottom 2". N PMA EOR to Advise 22 1/10/2022 Level 1, gridlines P.1- J.1/B.33 Abdulwahab Abulgasem CMU blocks the Vertical #7 by 16” not reaching overlap requirements, and may getting conflict with other structures as going up.Y PMA 1/13/2022 EOR to Advise 23 11/8/2021 Level 2 Salb on metal deck at Building C: E/C4 Arsene Ntwali Low Break : Mix #: 4000DGRNA : Slump 5-9 air 0-3 Design Strength (psi): 4,000 @28 days : Lab Log No.: 16995 N PMA EOR to Advise 7 day break 11/15/2021 Set 1 = 2,880 psi 28 day break 12/06/2021 Set 1 = 3,820 psi 56 day break 01/03/2022 Set 1 = 4,160 psi Set 1 = 4,250 psi Set 1 = 4,300 psi 24 12/2/2021 Building C : F-G/C7-9 Arsene Ntwali Low Break : Mix #: 3000DNA : Slump 5-9 air 0-3 Design Strength (psi): 3,000 @28 days : Lab Log No.: 17226 (3735)N PMA EOR to Advise 7 day break 12/09/2021 Set 1 = 1,290 psi 28 day break 12/30/2021 Set 1 = 1,720 psi 56 day break 01/27/2022 Set 1 = 1,780 psi 90 day break 03/2/2022 Set 1 = 1,780 psi 25 1/19/2022 1-P/A.10 Low roof media center 2-P/A.12 Lowroof media center 3-A5/W Foundation plan A Roney Nakhoul Cohesion/Adhesion of SFRM Applied to Structural Members failure: Fireproofing material is not adhering to the glue. Noted that material was wet to touch and 2 samples taken Y PMA 2/21/2022 Fireproofing material was given more time to dry, plus warmer weather during this dates testing resulted with the above tests. Cohesion adhesion values exceed requirements by project specs . 26 11/16/2021 Building A : N/b20, A5/S Arsene Ntwali Grout, low break: Design Strength (psi): 3,000 @28 days, Lab Log No.: 17087 (3651)Y PMA 1/19/2021 Page 13 of UNIT MASONRY 04 2000- 13 Notes: 28-day compressive strength indicated, but not less than 2000 psi EOR to Advise 7 day break 11/23/2021 Set 1 = 2,300 psi 28 day break 12/14/2021 Set 1 = 2,660 psi 56 day break 01/11/2022 Set 1 = 3,300 psi Set 1 = 3,330 psi J5951 - Dennis Yarmouth Middle School - Exception Log Pages 4 of 5 27 11/18/2021 Building A :T.1/A7 Arsene Ntwali Grout, low break: Design Strength (psi): 3,000 @28 days, Lab Log No.: 17119 (3678)Y PMA 1/19/2021 Page 13 of UNIT MASONRY 04 2000- 13 Notes: 28-day compressive strength indicated, but not less than 2000 psi EOR to Advise 7 day break 11/25/2021 Set 1 = 1,830 psi 28 day break 12/16/2021 Set 1 = 2,290 psi 56 day break 01/13/2022 Set 1 = 2,450 psi 90 day break 02/16/2022 Set 1 = 2,660 psi 28 11/18/2021 Building D: T.1/A7 Arsene Ntwali Concrete, low break: Design Strength (psi): 4,000 @28 days, Lab Log No.: 17282 (3681)N PMA EOR to Advise 7 day break 11/25/2021 Set 1 = 2,060 psi 28 day break 12/16/2021 Set 1 = 2,580 psi 56 day break 01/13/2022 Set 1 = 3,220 psi 90 day break 02/16/2022 Set 1 = 3,350 psi 118 day break 03/16/2022 Set 1 = 3,580 psi 29 11/22/2021 Building A : T.1/A6 Arsene Ntwali Concrete, low break: Design Strength (psi): 3,000 @28 days, Lab Log No.: 17197 (3728)N PMA EOR to Advise 7 day break 11/29/2021 Set 1 = 1,720 psi 28 day break 12/20/2021 Set 1 = 2,310 psi 56 day break 01/17/2022 Set 1 = 2,370 psi 90 day break 02/20/2022 Set 1 = 2,390 psi 30 12/27/2021 Level 2, L-K.8/b21-b22 Eric Pitman Grout, low break: Design Strength (psi): 2,500 @28 days: Lab Log No.: 17890 (4010)N PMA EOR to Advise 32 day break 01/28/2022 Set 1 = 1,190 psi 56 day break 02/27/2022 Set 1 = 1,270 psi 90 day break 03/27/2022 Set 1 = 1,840 psi 118 day break 04/24/2022 Set 1 = 1,610 psi 31 2/9/2022 Grade on Level 1 at Line M.5- Q, Row a18-Pass a30 Enea Mushi Floor Levelness measurement did not meet project spec requirements. 3.9 FINISHING FLOORS AND SLABS Specified overall values of flatness, F(F) 35; and of levelness, F(L) 25; with minimum local values of flatness, F(F) 24; and of levelness, F(L) 17; for slabs-on grade N PMA EOR to Advise 32 1/12/2022 P.2-B.30 -B-32 Bernard Connaughton Mortar low break: Design Strength (psi): 1,800 psi @ 28 days: Lab Log No.: 17776 N PMA EOR to Advise 7 day break 01/19/2022 Set 1 = 1,060 psi Set 1 = 1,190 psi Set 1 = 1,250 psi 28 day break 02/09/2021 Set 1 =1,400 psi 56 day break 03/09/2022 Set 1 = 1,580 psi 90 day break 04/12/2022 Set 1 = 2,110 psi 33 1/11/2022 Gymnasium - East Elevation at Line P.2-M.3-b33 Bernard Connaughton Mortar low break: Design Strength (psi): 1,800 psi @ 28 days: Lab Log No.: 17775 N PMA EOR to Advise 7 day break 01/18/2022 Set 1 = 630 psi Set 1 = 740 psi Set 1 = 770 psi 28 day break 02/08/2021 Set 1 = 840 psi 56 day break 03/08/2022 Set 1 = 890 psi 90 day break 04/11/2022 Set 1 = 1,010 psi J5951 - Dennis Yarmouth Middle School - Exception Log Pages 5 of 5 34 1/24/2022 Gymnasium - at Line K/B33 Arsene Ntwali Mortar low break: Design Strength (psi): 1,800 psi @ 28 days: Lab Log No.: 17921 N PMA EOR to Advise 7 day break 01/31/2022 Set 1 = 1,390 psi Set 1 = 1,490 psi Set 1 = 1,610 psi 28 day break 02/21/2021 Set 1 = 1,630 psi 56 day break 03/21/2022 Set 1 = 1,960 psi Set 1 = 2,100 psi 35 1/21/2022 Gymnasium, Line J.7-b30- b31, J.7-b25-b29 Arsene Ntwali Mortar low break: Design Strength (psi): 1,800 psi @ 28 days: Lab Log No.: 17913 N PMA EOR to Advise 7 day break 01/28/2022 Set 1 = 1,270 psi Set 1 = 1,300 psi Set 1 = 1,400 psi 28 day break 02/18/2021 Set 1 = 1,630 psi 56 day break 03/18/2022 Set 1 = 2,050 psi 36 3/1/2022 Bldg B section 5 and section 11 Roney Nakhoul Missing Bands: Banding missing in several locations at the exterior face; sheathing needs to be removed to fix in the 11 section. Some of the inside bands also missing. This inspector observed that some studs were screwed into the top track which they should not, as this is a deflection track. Studs at some of the curved walls need securing at the bottom on both sides; these areas appear in progress Y PMA 3/9/2022 Observed hex screws being installed for the bracing in bldg B 37 2/24/2022 P.1/b26-30 Arsene Ntwali Mortar low break: Design Strength (psi): 1,800 psi @ 28 days: Lab Log No.: 18046 (4052)N PMA EOR to Advise 7 day break 02/11/2022 Set 1 = 1,050 psi Set 1 = 1,120 psi Set 1 = 1,220 psi 28 day break 02/18/2021 Set 1 = 1,450 psi Set 1 = 1,660 psi Set 1 = 1,810 psi 38 3/30/2022 Building B Roney Nakhoul Work in Progress - Building B cold form metal framing N PMA Reinspection is required 39 4/12/2022 Level 1 Auditorium Seating Rows 1, 3, 5 Bernard Connaughton Concrete in truck exceeded the 90 minutes batch to placement time by 35 minutes. Temperature was checked after 100 minutes and at 115 minutes in the truck and remained at 70F. Truck fully discharged all concrete at 125 minutes. N PMA EOR to Advise 7 day break 4/19/22 Set 1 = 4,460 psi 28 day break 5/10/22 Set 1 = 5,950 psi 40 4/15/2022 Building C, Level 2 Roney Nakhoul Work in Progress - HVAC Duct near the C-D connector, east side, needs to be firestopped.Y PMA 6/2/2022 Reinspected and approved 41 6/8/2022 Building B, Level 2 Roney Nakhoul EJ required for the electrical penetrations through the floor to wall expansion joint system FWD 1013.N PMA EJ Numbers to be provided by contractor. 42 6/13/2022 Building B, Level 2 Roney Nakhoul SOFP for the beam at B22-B24/K needs repairs.N PMA Reinspection is required Status: Work-in-Progress Legend: Status: Closed Status: Open