Loading...
HomeMy WebLinkAbout31987-06-22-22-CPCONCRETE PLACEMENT INSPECTION Briggs Engineering & Testing PROJECT: A Division of PK Associates, Inc.PROJECT#: INSPECTOR: PAGE OF DATE:CODE:C26 TEMP.: H L WIND.: L H HUMID.: H L Concrete Source:General Contractor: Storage Location:Curing Box:Other: Inspection completed as per ACI-301 and Contract Documents. A checklist of major items is presented. All items in non-conformance are either corrected during inspection or noted herein. Detailed inspection of reinforcing for size, quantity, grade, spacing and configuration is reported separately when performed. Preplacement: Weather Steel arrangement Temp.Steel clearance Forms for general requirements.Steel cleanliness Grade preparation Steel supports Placement: Concrete placed within limits of ASTM C-94 and Contract Documents. Non-compliance items are either corrected before placement or noted herein.Concrete sampled in accordance with ASTM C-172. Unless otherwise noted all tests were conducted in accordance with ASTM's C31, C138, C143, C173, C 231 and C1064 respectively. ASTM C-94 Limits ASTM C-94 Limits Time Limits 1-1/2 hrs. max.Temperature 50-90° F Slump 4 - 7"Mixing 70-300 Rev. Air content 4.5 - 7.5%Density ± 3 p.c.f. Location:Walkway bathhouse area at kiki bar. Walkway area behind Shark Bite Café. Remarks:6x6" Wire mesh in placement. Tested/ sampled midway through load. The following is a list of all trucks sampled. All other trucks were verified to be in conformance with ASTM C94 and Project specifications. Any trucks not in compliance with standards may be tested, and are noted herein. Method of placement:Chute Pump Other Load Arr.Truck No. of Mix Conc.Slump Air Air Conc.Conc.C.A.Cyl.Set Gals.Unit No.Time No.Yds.Duration Temp.(in.)(%)Temp.Strength Strength Size Fabr.#added Weight (min.)(°F)(°F)Deliv.Required water (pcf) X 100 Weymouth St., Unit B-1, Rockland, Ma 02370 100 Pound Rd., Cumberland, RI 02864 Approved: c.p.i. Rev. 3, 07 Director of Field Operations:YH X X 74F √ Cape Cod Ready Mix 72F 58F 31987 Robert Carter Aquatic Builders Sean Skorohod Total Cubic Yards Placed CC INFLATABLE PARK/W. YARMOUTH 06/22/22 X X X X 4000 N/A N/A X SUN X X 11 11 X X X 63 81 72f 5.25" 6.75"2 10 15 3/4 3/4 5 5 66 (in.) 14000 40004.7%7:15 9:55 40004.9% 58-72F 58-72F 2 5 71 75 Sean Skorohod