July 14, 2022 C19633.01
Yarmouth Conservation Commission By Hand Delivery
Attn: Heidi Hudson
1146 Route 28
South Yarmouth, MA 02664
Re: Certificate of Compliance Filing Package
Proposed Floating Dock and Pile Replacement
Sandra DiGiovanni
Skippy’s Pier 1 Marina
17 Neptune Lane
South Yarmouth, MA
Map 32, Parcel 118
DEP File NO: SE 83-1745
OOC Book 21423, Page 181
Dear Commission Members:
On behalf of our client Sandra DiGiovanni, we are submitting a Certificate of Compliance Filing Package.
The following items are enclosed:
• Yarmouth Conservation COC Administrative Checklist
• WPA Form 8A – Request for a Certificate of Compliance
• Copy of $75.00 check made payable to Town of Yarmouth for filing fee
• Engineer’s Statement of Compliance
• Approved Plan Showing Deviations (in Red)
Please schedule this for the July 21, 2022 public hearing. If you have any questions or require additional
information, please give our office a call. Thank you.
Sincerely,
COASTAL ENGINEERING CO., INC.
Carla A. Davis
Enclosures: as stated
cc: Sandra DiGiovanni
Skippy’s Pier 1 Marina
Nathan D. Jones, Project Manager
Yarmouth Conservation Commission • 1146 Route 28 • South Yarmouth, MA 02664-4492
Tel. (508)-398-2231 Ext. 1288 • Fax (508)-398-0836 • TTD# (508) 398-2231 • kgrant@yarmouth.ma.us
Rev 8/2021
Administrative Checklist
Certificate of Compliance
General Information:
All filings must be made on Town of Yarmouth forms.
All applications must be submitted two weeks prior to the next scheduled Conservation
Commission meeting. Refer to Meeting Schedule.
Failure to follow the Administrative Checklist shall result in an Administrative Incomplete
Application and will not be scheduled for a Public Hearing.
Contact the Conservation Office if you need assistance.
Submitting an Application:
1 complete original application, plan/sketch, and other supporting information
to the Conservation Division - mailed to/dropped off at Town Hall.
1 complete pdf of application, plan/sketch, and other supporting information
emailed to kgrant@yarmouth.ma.us.
Statement from Engineer and/or stamped As-Built plan if required under the
Order of Conditions to be included with both original and pdf application.
Refer to 310 CMR 10.05(9)(d).
Local filing fee. Refer to Fee Schedule. Make check payable to “Town of Yarmouth”
and include property address in memo.
All forms, Fee Schedule and Meeting schedule can be found at
https://www.yarmouth.ma.us/696/Filing-Forms.
CONSERVATION
DIVISION
X
X
X
X
wpaform8a.doc •• rev. 5/29/14 Page 1 of 2
Massachusetts Department of Environmental Protection
Bureau of Resource Protection - Wetlands
WPA Form 8A – Request for Certificate of Compliance
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40
Town of Yarmouth Wetland By-law, Chapter 143
DEP File Number:
SE 83-1745
Provided by DEP
A. Project Information
Important:
When filling out
forms on the
computer, use
only the tab
key to move
your cursor -
do not use the
return key.
1. This request is being made by:
Sandra DiGiovanni
Name
17 Neptune Lane
Mailing Address
South Yarmouth
City/Town
MA
State
02664
Zip Code
Phone Number
2. This request is in reference to work regulated by a final Order of Conditions issued to:
Sandra DiGiovanni
Applicant
3/8/2006
Dated
SE 83-1745
DEP File Number
Upon completion
of the work
authorized in
an Order of
Conditions, the
property owner
must request a
Certificate of
Compliance
from the issuing
authority stating
that the work or
portion of the
work has been
satisfactorily
completed.
3. The project site is located at:
17 Neptune Lane
Street Address
South Yarmouth
City/Town
32
Assessors Map/Plat Number
118
Parcel/Lot Number
4. The final Order of Conditions was recorded at the Registry of Deeds for:
Sandra DiGiovanni
Property Owner (if different)
Barnstable
County
21423
Book
181
Page
Certificate (if registered land)
5. This request is for certification that (check one):
the work regulated by the above-referenced Order of Conditions has been satisfactorily completed.
the following portions of the work regulated by the above-referenced Order of Conditions have
been satisfactorily completed (use additional paper if necessary).
the above-referenced Order of Conditions has lapsed and is therefore no longer valid, and the
work regulated by it was never started.
wpaform8a.doc •• rev. 5/29/14 Page 2 of 2
Massachusetts Department of Environmental Protection
Bureau of Resource Protection - Wetlands
WPA Form 8A – Request for Certificate of Compliance
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40
Town of Yarmouth Wetland By-law, Chapter 143
DEP File Number:
SE 83-1745
Provided by DEP
A. Project Information (cont.)
6. Did the Order of Conditions for this project, or the portion of the project subject to this request, contain
an approval of any plans stamped by a registered professional engineer, architect, landscape
architect, or land surveyor?
Yes If yes, attach a written statement by such a professional certifying substantial
compliance with the plans and describing what deviation, if any, exists from the plans
approved in the Order.
No
B. Submittal Requirements
Requests for Certificates of Compliance should be directed to the issuing authority that issued the final
Order of Conditions (OOC). If the project received an OOC from the Conservation Commission, submit
this request to that Commission. If the project was issued a Superseding Order of Conditions or was the
subject of an Adjudicatory Hearing Final Decision, submit this request to the appropriate DEP Regional
Office (see http://www.mass.gov/eea/agencies/massdep/about/contacts/find-the-massdep-regional-office-
for-your-city-or-town.html).
July 12, 2022 C19633.01
Yarmouth Conservation Commission By Hand Delivery
Attn: Heidi Hudson
1146 Route 28
South Yarmouth, MA 02664
Re: Statement of Compliance
Proposed Floating Dock and Pile Replacement
Sandra DiGiovanni
Skippy’s Pier 1 Marina, 17 Neptune Lane
South Yarmouth, MA
Map 32, Parcel 118
DEP File NO: SE 83-1745
OOC Book 21423, Page 181
Dear Commission Members,
We have reviewed the original plan submitted under the above referenced DEP File No. from circa
2006/2007. Coastal Engineering Company (CEC) has conducted a site inspection of the referenced
property and find the work originally completed in 2006 was in relatively substantial conformance with
the plan, “Proposed Dock & Pile Layout”, dated 10/28/2005 and Order of Conditions issued on
03/08/2006. A redline of the original submitted plan is provided for reference of the observed
deviations. CEC has completed a detailed site plan of the referenced property and has provided that
under a separate NOI of the current conditions
Therefore, on behalf of Sandra DiGiovanni, we respectfully request a Certificate of Compliance be
issued for this project.
Please contact me if you have any questions or require additional information.
Sincerely,
COASTAL ENGINEERING CO., INC.
Todd D. Turcotte, PE
Waterfront / Marine Division Manager
Enclosures:
cc: Sandra DiGiovanni
Skippy’s Pier 1 Marina
44' 38'-5 1/4" 44'
260
1
44' 44'
r 6'
I
40` TYP.
321-601
33,
TYP.
If
25'-6" -f--- 44' 40' 44' 44' 44' 44' 1 44'
332'
9
6'
SKIPPY'S PIER 1"
DG REALTY TRUST
AT 17 NEPTUNE LANE, SOUTH
YARMOUTH MA
DATE: REV. 1
DATE: REV. 2
DATE. REV. 3
SULLIVAN FLOTATION SYSTEMS, INC.
S "'A°" WARWICK NY (845) 986-7377
ta
WWW.SUUnOAT.COM DOCKSOSULLFLOAT.COM
MARINE TECH INC,
YARMOUTH, MA,
PROPOSED DOCK & PILE LAYOUT
DRAWN BY W.W.S. DWG NO. REV
DATE 10/28/05 S D 1 0
SCALE 1"=20' APPROVED BY ASSEMBLY #0
s
E
325'
28'
26'
22'
166'
9'
22'
34'34'
27'
263'
45.5'
53'
Float Area Calcs
Plan Actual
11,307sf 11,184sf