Loading...
HomeMy WebLinkAboutEngineer Certification Letter Engineering Works, Inc. Civil Engineers-Surveyors-Soil Evaluators 12 West Crossfield Road, Forestdale, MA 02644 Tel/fax (508)477-5313 Bruce Murphy - Health Director July 11, 2022 Yarmouth Board of Health 1146 Route 28 South Yarmouth, MA 02664 Re: 33 Maine Ave., West Yarmouth - Septic Upgrade, Map ID: 22-369 Dear Mr. Murphy, As per your request and in accordance with 310 CMR 15.021(3) of the State Environmental Code-Title 5, an as-built review of the septic system at the subject site has been conducted. I hereby certify that the Sanitary Subsurface Disposal System has been installed in substantial compliance with the design plan by Engineering Works, Inc. & JC Engineering, Inc., dated 5/3/22. The septic system consists of a new Infiltrator 1500 gallon poly tank, a new D-box and 4 rows of 5, High Capacity Infiltrator units , as shown on the plan. Should you have any questions, please do not hesitate to call. Sincerely, JUL i 12022 Peter T. McEntee P.E. HEALTH DEPT 1