HomeMy WebLinkAboutProperty Information SWEETSER ENGINEERING .
203 SETUCKET ROAD- P.O. BOX 713—SOUTH DENNIS—MASSACHUSETTS 02660
TEL(508)385-6900 EMAIL sweetsereng@aol.com FAX(508)385-6991
LAND SURVEYING—ENGINEERING—TITLE 5 SEPTIC SYSTEMS
SEPTIC DESIGN PROPOSAL PAGE 2
PROPERTY INFORMATION AND FLOOR PLAN SKETCH
Please fill out this form,including the floor plan sketch,and return to us with the signed proposal and retainer.
This information is necessary to properly prepare your Septic System Design.
If you are planning an addition,we require a set of plans including a foundation plan
AI Total #of Rooms C/ Year Round Home Seasonal Home Owner Occupied Rental
#//Bedrooms gamily Room/Den Living Room ✓ ining Room . #Bathrooms
Washer/Dryer 6ishwasher MA-Garbage Disposal //Gbas Service _ �-Town Water
In-ground Electric Wires* In-Ground Oil Tank* - In-ground Sprinkler* '- n-ground Gas Pipes*
* Please note on sketch where located. Sweetser Engineering assumes no responsibility if in-ground components are
damaged during Soil Testings, Inspections, Locations of and/or Installation of New Septic System.
Cellar: L/ Full Partial(Crawl) Slab
Wells: Main Use Irrigation Only (please provide location of all wells)
PLEASE USE THE SPACE BELOW AND THE BACK OF THIS SHEET TO PROVIDE US WITH A ROUGH SKETCH OF
THE EXISTING FLOOR PLAN(ALL FLOORS). Also include any items that should be avoided,IF FEASIBLE,i.e.shrubs. •
trees, patios,electric lines,tanks,etc.
e-%157:4104114,
C
----17 1 /yam` €
{
0r1G0ENl -plAJJu,t t .kt sn eeD , I
I
; I t I Vim 6 Q cvM e,e� bhp s 1
E;ocK RAo►4 i
k r _ — r
1
EXAMPLE
DEC 0 4 2020
HEALTH DEPT.