Loading...
Review Checklist TOWN OF YARMOUTH SEWAGE PLAN REVIEW CHECKLIST } Location: A.M. 3`1 Lot 8 3 Zone of Contribution: In Out k Acreage q / s F Commercial: Residential: Street: 5 7 4>e ( K-a►q�� . Village: Floor Plan: #Bedrooms: 3 Owner: .Aize f- 4 Installer: Address: Phone: Phone: Builder: Engineer: 8 S C Address: Phone: Phone: N/A YE, NO 1.Required#of copies received 2� ,,•••- 2. /2.Date of soils exam and percolation test not older than 2 years V. 3.4-5 ft of naturally occurring pervious material,above water table / 4. Foundation 2 ft above high point of road H.P.: Fnd: Var.: 5. Water line 10 ft from septic components Var.: 6. Benchmark indicated and shown-NGVD if near wetlands 7. Septic tank minimum 10 ft from foundation, deck Var.: 8. Leaching minimum 20 ft full, 15 ft crawl, 10 ft slab Var.: 9. Leaching minimum 100 ft from wetlands Var.: - 10. Leaching minimum 150 ft from drinking well/25 ft irrigation well Var.: I 11.Tank/leaching minimum 10 ft from property line Var.: 1 12. System meets all other setback requirements Var.: 13. Uses adjustment for maximum high groundwater Var.: l ` ✓ 14. Leaching set 4-5 ft above adj. water or bottom of test hole Var.: ✓ 15. System not in top or subsoil(A,B horizons)or 5' removal / 1 16. Proposed contours are suitable 17. System meets slope requirements-min. 1/8", 1/4"pr 18. System meets breakout requirements PVC li r: Wall• 7 19. Specified tee sizes are proper, gas baffle on outlet tee 20. Sewage is under 10,000 gpd for parcel 21.No garbage disposal 22. System adequately sized for its inten ed us: 23.Minimum 6"stone or compacted bel tank . i dbox `L/n 24. Manhole covers within 6"of grade,p n . s amber cover to grade ✓/ 25. Inspection port on plastic chambers/leach field f 26. Electrical permit for pump chamber/Separate meter for duplexes V 27.Pump system-2"line,weep hole,check valve,tee in dbox,pump size 28. Septic tank/pump chamber to be factory waterproofed ✓ 29.Vent provided if leaching below 3 feet,under driveway/parking ✓ 30. Buoyancy calculations for tank/pump chamber ✓ / 31. Engineer to inspect and certify soils: wall: commercial: N 1 V 32. Engineer/Registered Sanitarian and Land Surveyor stamps/signature •� 33. H-20 loading is subject to vehicular traffic, groundwater V •� 34.Title V Application and permit fee,installer signature ✓ a1 g 35. Foundation footing min.2 feet above adjusted ground water for new house v.2- / . 36. Deed Restriction required max. #bedrooms: max. flow: gpd ✓ 37. Check area lots for groundwater/Label groundwater in Assessor's Map .� Plan reviewed by: ///4/2b2-z_ 6 03 03